Answer #1

Change Control Process:- Change control process is a systematic approach in order to make decisions & managing all the changes that are needed to be made in a system/ process for betterment of the same. The primary purpose of this process is that no unnecessary/ unrequired changes are implemented & all the changes are properly documented. Resource management & allocation would also be kept in mind & efficient use is always the agenda. There is a team which is responsible for conducting such process, & is formed with its stakeholders. Few basic steps in Change Control Process are mentioned below:-

  1. Changes request catering/documenting.
  2. Justification for changes to be made in process.
  3. Action plan to be created by responsible team.
  4. Quality check/ testing to be performed prior sending these for implementation.
  5. The desired team implements the program/process & then changes are reviewed.
  6. Final check & audit is being conducted & if qualified satisfactorily, the change request is closed.

2 Primary purpose of control:-

  1. Prevent/Stop unnecessary changes:- Controlled changes under proper supervision will help the process to gain efficiency & should gain the resource utility. If not performed under controlled manner, changes might lead to process deviation & could lead to unnecessary efforts for correction.
  2. Documenting the Changes:- Controlled & step-by-step procedure of making any change in product/ process, helps you to properly document & pen-down each & every detail of the change. Documenting helps to control the resource utilization as well.

Control, as a word is very difficult when come across in day-today life scenarios as well. It is very easy to say, one should control their temper, one should have control over emotions, controlled driving etc, but when the actual situation arrives, most of us fail to control ourselves. Controlling changes or anything can be complicated & needs proper supervision. While controlling any process, each & every aspect should be clear & sound enough, deadlines must be defined, quality cannot be compromised.

Earned Value:- earned value is process which helps the manager, to calculate the amount of real/actual work performed on that process. This helps in monitoring the projected plan, actual progress & other details to have an overview if project/ process are on their right track? It is basically a measure of what money & duration should have been spent, in comparison to the amount of work performed so far. It covers the budget of the cost of work performed till date. It is toll which can be used to predict future of projects, in terms of deadline, money & other factors.

Monitoring & control:- Monitoring as word suggest is just, checking & keeping an eye over the process so that fault & shortcomings can be analyzed. Monitoring is about just documenting the points that needs discussion over meeting. Results & better process would be achieved post meetings. The process which needs monitoring are being observed closely until project completion so that potential problems, faults can be identified in a timely manner & accordingly changes can be performed. Controlling as explained above is the making changes post monitoring if needed in any aspect/stage of project/process. The monitoring & control processes are executed respectively throughout the life of project.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Project Management Fundamentals Questions Only A project team is discussing the benefits and drawbacks of working...
Project Management Fundamentals Questions Only A project team is discussing the benefits and drawbacks of working on projects within their organization now that it has become project-oriented. They can agree on many advantages for the team and for the organization, but also agree there are some drawbacks, relative to the strong matrix structure the organization used to have. In a project-oriented organization the project team: ANSWER Will not always have a "home" Reports to the functional manager Has no loyalty...
Which of the following best describes a project management plan? The project charter, WBS, and project...
Which of the following best describes a project management plan? The project charter, WBS, and project scope statement The schedule, management plans, and budget A formal, approved document used to control the project The project manager's plan for managing and controlling the work The engineering department wants the project objective to be a 10 percent improvement in throughput. The information technology department wants no more than 5 percent of its resources to be used on the project. Management, who is...
Case Scenario LSS is engaged in flood relief support nationally and has been asked to do...
Case Scenario LSS is engaged in flood relief support nationally and has been asked to do several international Camp Noah projects. Last year the French government asked for resources for children in Southeastern France who had been affected by floods; LSS responded within 15 weeks with a French Camp Noah curriculum that met many of the project objectives. The Board of Directors of LSS commended the effort; international expansion was added to this year’s strategic objectives for the LSS organization....
The project has been performing as planned, and the team members have been exhibiting increasing levels...
The project has been performing as planned, and the team members have been exhibiting increasing levels of trust between each other. The sponsor and the buyer have been satisfied with the delivery of business value, and user acceptance testing results are positive. A technical expert consulting with the team has expressed concerns that the team is not in agreement on the best way to deliver to the next review. If the project manager wants to support the team in reaching...
Project Integration Management Questions Only A team member notifies you, after the fact, that she has...
Project Integration Management Questions Only A team member notifies you, after the fact, that she has added extra functionality to the project. There was no impact on the cost or schedule. What should be done as a result of this change? Make sure marketing is aware of the change. Implement change control processes to track the change. Inform the customer. Understand what functionality was added. You are having difficulty getting a project underway. You have not been able to get...
Question -Organizational change goes beyond promotions and the threat of layoffs. What ways other than those...
Question -Organizational change goes beyond promotions and the threat of layoffs. What ways other than those discussed in the case would you use to entice people to embrace proposed changes? Provide several suggestions and justify their rationale. CASE STUDY- Blue Cross and Blue Shield, and Others: Understanding the Science behind Change Kevin Sparks has been trying to get his staff to change the way it monitors and supports the data center for the past year, but he hasn’t been getting...
Explain the complete HAZOP procedure as followed in the industry. See summary below. Explain all the...
Explain the complete HAZOP procedure as followed in the industry. See summary below. Explain all the main parts of HAZOP study in details given in the Pdf file including: 1. Overview (including definitions and usage) 2. Hazop methodology (including phases like definition, preparation, examination, documentation and follow-up). Give examples also 3. Risk review 4. Risk communication Guidance: Study the procedure carefully and then write the answers in your own words. Hazard & Operability Analysis (HAZOP) 1   Overview: Hazard and Operability...
1. Tendons and ligaments are similar because they both have: a limited blood supply and low...
1. Tendons and ligaments are similar because they both have: a limited blood supply and low metabolism an abundant blood supply and low metabolism a limited blood supply and high metabolism an abundant blood supply and high metabolism 2. What is the name of the outer layer of connective tissue on skeletal muscle? perimysium epimysium endomysium intermediate fascia 3. The functional units of skeletal muscle that allow it shorten are: tendons fascicles sarcomeres perimysium 4. In terms of muscle actions...
THE CASE OF THE MEXICAN CRAZY QUILT “The mission of the project which you will head...
THE CASE OF THE MEXICAN CRAZY QUILT “The mission of the project which you will head is to get our new Mexican subsidiary ready for take-over by Mexican managers. My hope is that you will be able to do this in about two years,” explained Robert Linderman, president of Linderman Industries, Inc., to Carl Conway, newly appointed manager for “Operation Mexicano.” Conway had been hired specifically for this assignment because of his experience in managing large defense projects in the...
The airline negotiations: A potential joint venture that did not get off the ground The grand...
The airline negotiations: A potential joint venture that did not get off the ground The grand vision The context for this case study was that the airline industry was seeking to recover from 9/11, the Sars outbreak and general uncertainty surrounding the Middle East. One industry response to these challenges was to look for opportunities to rationalise and grow through alliances. European airline was seeking to develop a position in the growing China market. At the same time, an Asian...