In terms of logical enablers, why is process plan and production scheduling simplified in group technology?...

In terms of logical enablers, why is process plan and production scheduling simplified in group technology?

What are the benefits of having group technology, process plan and scheduling?

Homework Answers

Answer #1

Group technology is a technique in which parts having similar geometry and configurations are clubbed together and are manufactured together at one location using a small number of processes or technique. The underlying principle is that a single solution can be found for a multiple problems, thus reducing time and cost. Thus simplifying the process plan and scheduling.

Benefits of group technology, process plan and scheduling:-

1. It promotes standardisation of tooling, fixtures and setups.

2. Process planning and scheduling are simplified.

3. Material handling is reduced.

4. Setup time is reduced.

5. Work in process is also reduced.

6. Higher quality work is accomplished using group technology.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A particular technology is both highly profitable and produces large benefits for consumers in terms of...
A particular technology is both highly profitable and produces large benefits for consumers in terms of a large consumer surplus. The technology also has a negative production externality. Explain under what conditions this particular technology should no longer be used if you take a perspective of societies overall welfare.
1. Which of the following is NOT a short-term planning activity? a. Master production scheduling b....
1. Which of the following is NOT a short-term planning activity? a. Master production scheduling b. Integrated business planning: S&OP and CPFR c. Strategic business plan d. Production and purchasing control 2. Manufacturing planning and control is a set of business processes that determine how you are going to use resources—e.g., capacity, equipment, people, and technology—to produce what your customers want when they want it. True False 3. Aggregate planning helps you align your production capacity with _________. a. inventory...
a factory has a production plan calling for 20,000 products/year. the cost to process a single...
a factory has a production plan calling for 20,000 products/year. the cost to process a single work order is $50 and the cost to hold one unit of one product in stock for one year is $5. the production rate is 100 units/day and the usage rate is 60 unit/day. 1. write the equation for epq and label the variable. 2. compute the factory EPQ 3. What is the maximun level of finished goods inventory?
Why does the scheduling function depend on the planning function? Which one must be done first?...
Why does the scheduling function depend on the planning function? Which one must be done first? Why? Describe what an activity estimated duration is. How is it determined? Why might a contractor prefer to state a project completion time in terms of number of days after the project starts rather than a specific date? Give some examples of instances when this would be appropriate. Why is it important to determine the critical path of a project? What happens if activities...
I need these TERMS defination for PTEC process technology major 1-controller 2-set point 3-reverse Acting 4-Integral...
I need these TERMS defination for PTEC process technology major 1-controller 2-set point 3-reverse Acting 4-Integral (Rest) 5- Control Valve 6- Lpuver/Damper 7-Electric Motor 8- Instrument Air regulator 8-Erors 9-Proportional Band(Gain) 10-Integrally-Mounted 11-Transducer explain what final control elemnt do explain what idiffrent btween s varibles (mainpulated) and Variable (Measured) what is penumatic signal ? What is Electric signal What is Digital signal thank you !!
Enactment of Technology Strategy-Creating and Implementing a Development Strategy describes how development projects are traditionally managed...
Enactment of Technology Strategy-Creating and Implementing a Development Strategy describes how development projects are traditionally managed and states the bases as to why so many fail and/or not completed on time. It describes six phases of a development project and claims that traditionally management attention and influence is heavy in the end phases of the project when they should be focused at the beginning phases of the project for success. These suggest the development strategy leadership approach for senior management...
One process for the production of methanol is the catalytic reaction of carbon dioxide and hydrogen....
One process for the production of methanol is the catalytic reaction of carbon dioxide and hydrogen. The chemical reaction is given by: CO2  3H2  CH3OH  H2O It is desired to produce 1000 mol/hr of methanol. The single pass conversion of the reactor is 10% while the overall conversion is 80% (both in terms of hydrogen). Note, carbon dioxide in the fresh feed is in 20% excess and all of the product (methanol) and the byproduct (water) is...
43) In the process of preparing a receiving report, the receiving department should perform all of...
43) In the process of preparing a receiving report, the receiving department should perform all of the following tasks except: (2pts) compare the completed receiving report to the information stored in the purchase order master data inspect and approve quality count the quantity received compare the vendor’s packing slip to a copy of the purchase requisition 44) Which of the following data stores is updated for job specifications? (2pts) termination data skills inventory data labor-force planning data payroll data All...
Question 5: Forecasting (8 p) The table below shows the demand (in units per quarter) of...
Question 5: Forecasting (8 p) The table below shows the demand (in units per quarter) of a specific product in the past three years. Quarter Year 1 2 3 4 2015 350 254 176 228 2016 367 258 169 236 2017 342 250 166 228 Predict demand in quarter 1 and quarter 2 of 2018, given that the demand forecast for the whole year is a total of 1,040 units. Question 6: DRP (8 p) A central DC supplies a...
Review the discussion below and reply with your thoughts in your own words: 1. Why are...
Review the discussion below and reply with your thoughts in your own words: 1. Why are hospitals adopting the “Toyota Way”? According to Colliver (2013), “the Toyota Way, as it is called, is the company’s systematic approach to producing cars and trucks efficiently, with the primary goal of pleasing the customer” (para. 2). Hospitals are adopting the “Toyota Way” because of the need to compete as reimbursements are dwindling. More hospitals are doing this to attract patients because the available...