Question

Provide a schematic of the pump station for the wastewater treatment plant. Design it as a...

Provide a schematic of the pump station for the wastewater treatment plant. Design it as a mid-scale and provide the dimension (Any dimension that makes sense will work).

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
As an environmental engineer, you have been selected to design a secondary wastewater treatment plant for...
As an environmental engineer, you have been selected to design a secondary wastewater treatment plant for your town of 15000 people which also has some industry that discharges wastewater to the plant. The average daily wastewater flow is 2.1 MGD. If the If the average domestic per capita sewage flow is 100 gpcd, what is the average flow of the industrial wastewater (in MGD)? *
). In a wastewater treatment plant a circular sedimentation tank need to be design. A influent...
). In a wastewater treatment plant a circular sedimentation tank need to be design. A influent flowrate is 0.15 Million cubic meter per day and the surface loading is 822.4 m3/d-m2 and detention time is 1.3 hours. Calculate the diameter and height of the sedimentation tank                     
Dechlorination contact tank (Wastewater Treatment) An activated sludge plant has a design flow (average daily flow)...
Dechlorination contact tank (Wastewater Treatment) An activated sludge plant has a design flow (average daily flow) of 11 MGD. Determine dimensions of dechlorination tank. The design parameters: use 1 tank. detention time = 30 sec, depth = 10 ft, rectangular tank: L = 4 W. use maximum hourly flow (3 * Average design flow)
Wastewater treatment The Ampang Jaya Municipal Council with a population of 350,000 and several industries discharged...
Wastewater treatment The Ampang Jaya Municipal Council with a population of 350,000 and several industries discharged 11 MGD of raw sewage into an activated sludge system treatment plant. The average concentration of BOD5 is 240 mg/L and the suspended solids is 260 mg/L. If the average domestic per capita sewage flow is 225 L/c.day, what is the average flow of the industrial wastewater (in MGD)? marks) If the average BOD5 load from the domestic sewage is 55gcapita-1day-1, determine the average...
As an Engineer, you are requested to implement a small wastewater treatment plant for your apartment...
As an Engineer, you are requested to implement a small wastewater treatment plant for your apartment that comprise of 52 flats. Explain the different steps or stages involved in the wastewater treatment process. (please type the answer )
Out of the following energy sources; Solar energy, Biomass, Wastewater treatment, Wind Power, and Geothermal Pump,...
Out of the following energy sources; Solar energy, Biomass, Wastewater treatment, Wind Power, and Geothermal Pump, which is the best to address the energy needs of a household or building, and why?
draw the flowchart of wastewater treatment plant and mention the waste removal in each process
draw the flowchart of wastewater treatment plant and mention the waste removal in each process
A wastewater treatment plant receives an average of 3.0 MGD of wastewater flow. Two rectangular primary...
A wastewater treatment plant receives an average of 3.0 MGD of wastewater flow. Two rectangular primary clarifiers operating in parallel will treat the flow. If the length of each clarifier is four times its width, the width is 20 ft, and the depth is 10 ft, determine: a) the overflow rate in gpd/ft2. b) the detention time of each clarifier (in days).
A wastewater treatment plant designed for a community of 60,000 people has a flow of 100...
A wastewater treatment plant designed for a community of 60,000 people has a flow of 100 gal/person/day and a biochemical oxygen demand (BOD) loading of 0.2 lb/person/day. The treatment plant has a permit limit for BOD equal to 15 mg/L. a. (6 pts) What is the concentration (in mg/L) of BOD coming into the plant (i.e., as raw, untreated sewage)? b. (2 pts) When the treatment plant is treating its waste and meeting its permit limit, what is the removal...
. A wastewater treatment plant is to be designed for the 5-d sustained peak flowrate given...
. A wastewater treatment plant is to be designed for the 5-d sustained peak flowrate given an average daily flow of 13 MGD. Two aerated grit chambers in parallel will provide a total detention time of 4 minutes at peak flow. Determine: a) The volume of each chamber, in m3 . b) Chamber dimensions, in m, (length and width) if the design depth is 3.5 m and W:D is 1.2:1. Is the calculated L:W within the recommended range? c) Using...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT