Question

. A wastewater treatment plant is to be designed for the 5-d sustained peak flowrate given...

. A wastewater treatment plant is to be designed for the 5-d sustained peak flowrate given an average daily flow of 13 MGD. Two aerated grit chambers in parallel will provide a total detention time of 4 minutes at peak flow. Determine: a) The volume of each chamber, in m3 . b) Chamber dimensions, in m, (length and width) if the design depth is 3.5 m and W:D is 1.2:1. Is the calculated L:W within the recommended range? c) Using the chamber width calculated in part b, determine the chamber length required to have a length-to-width ratio of 3:1. d) For the chamber volume calculated in part a and length from part c, what is the redesigned chamber depth and width-to-depth ratio? Is this ratio within the recommended range? e) Grit chamber detention time at Qavg, in min

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A wastewater treatment plant receives an average of 3.0 MGD of wastewater flow. Two rectangular primary...
A wastewater treatment plant receives an average of 3.0 MGD of wastewater flow. Two rectangular primary clarifiers operating in parallel will treat the flow. If the length of each clarifier is four times its width, the width is 20 ft, and the depth is 10 ft, determine: a) the overflow rate in gpd/ft2. b) the detention time of each clarifier (in days).
Problem #3: Biochemical Oxygen Demand (BOD) and Stream Quality A wastewater treatment plant designed for a...
Problem #3: Biochemical Oxygen Demand (BOD) and Stream Quality A wastewater treatment plant designed for a community of 45,000 people has a flow of 100 gal/person/day and a BOD5 loading of 0.2 lb/person/day. The upstream characteristics of the receiving waters are: stream flow rate = 20 cfs and BOD5 = 2 mg/L The water quality standards require the in-stream BOD5 to be less than 7 mg/L in this stretch of the river. The minimum BOD removal efficiency that the treatment...
The old plant grit removal process, that is used to treat the average flow of 15...
The old plant grit removal process, that is used to treat the average flow of 15 MGD consists of horizontal flow grit chamber that have a volume of 15,000 gallons. To reduce the footprint of the process, the new plant will use a Vortex type grit chamber that is capable of achieving the same grit removal performance in a fraction of the reactor volume. Remember that the flow to the new plant is 10 MGD . 11. What is the...
A mechanically cleaned bar screen is installed ahead of an aerated grit chamber in a wastewater...
A mechanically cleaned bar screen is installed ahead of an aerated grit chamber in a wastewater treatment plant. The width of the screen channel is 0.86 m. At peak flow condition the flow upstream of the screen is 0.72 m3/s with a depth of 1.40 m. For a screen opening area of 0.84 m2, determine the head loss across the screen when the screen is 40% clogged, consider the discharge coefficient to be 0.6.
Dechlorination contact tank (Wastewater Treatment) An activated sludge plant has a design flow (average daily flow)...
Dechlorination contact tank (Wastewater Treatment) An activated sludge plant has a design flow (average daily flow) of 11 MGD. Determine dimensions of dechlorination tank. The design parameters: use 1 tank. detention time = 30 sec, depth = 10 ft, rectangular tank: L = 4 W. use maximum hourly flow (3 * Average design flow)
A rectangular horizontal-flow sedimentation basin in a conventional water treatment plant has been designed to treat...
A rectangular horizontal-flow sedimentation basin in a conventional water treatment plant has been designed to treat a flow of 50,000 m3 /day. It has a length = 80 m, width = 20 m, and depth = 3.6 m. For this problem, assume temperature = 20 °C (density of water = 103 kg/m3 and viscosity = 10-3 kg/m·s) and laminar flow. a. What is the hydraulic detention time? Does this meet the typical criteria for this type of sedimentation basin? b....
You have been retained to design a wastewater treatment plant using a conventional activated sludge process...
You have been retained to design a wastewater treatment plant using a conventional activated sludge process for a town of 40,000 people. The industrial flow contribution to the sewer system is 300,000 gallons per day. Effluent discharge standards require effluent BOD5 and total suspended solids concentration of <10 mg/l. Assume the following design criteria are applicable: Domestic sewage flow = 100 gal/cap/day (including I/I) BOD loading = 0.18 lbs/cap/day TSS loading = 0.20 lbs/cap/day BOD removal in primary = 33%...
A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process...
A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process followed by an activated sludge process composed of aeration tanks and a secondary clarifiers. This problem focuses on the activated sludge process. The activated sludge process receives a flow of 15 million gallons per day (MGD). The primary sedimentation process effluent has a BOD5 concentration of 180 mgBOD5/L (this concentration is often referred as S). Before flowing into the activated sludge process, the primary...
A completely mixed activated-sludge process is being designed for a wastewater flow of (2.64 mgd) using...
A completely mixed activated-sludge process is being designed for a wastewater flow of (2.64 mgd) using the kinetics equations. The influent BOD of 120 mg/Lis essentially all soluble and the design effluent soluble BOD is 7 mg/L, which is based on a total effluent BOD of 20 mg/L. For sizing the aeration tank, the mean cell residence time is selected to be10 days and the MLVSS 2000 mg/L. The kinetic constants from a bench-scale treatability study are as follows: Y...
Part I. Indicate whether true or false (T or F). ____ Storm water detention ponds typically...
Part I. Indicate whether true or false (T or F). ____ Storm water detention ponds typically are designed to regulate the outflow peak rate at or below a single target value, such as the pre-development (pre-land use change) peak runoff rate for a specified return period event. Detention storage alters the peak but not the volume of the outflow hydrograph. _____ Typical rating curves for weirs are concave upward. Typical rating curves for orifices are concave downward. ____ A sediment...