Question

As an environmental engineer, you have been selected to design a secondary wastewater treatment plant for...

As an environmental engineer, you have been selected to design a secondary wastewater treatment plant for your town of 15000 people which also has some industry that discharges wastewater to the plant. The average daily wastewater flow is 2.1 MGD. If the If the average domestic per capita sewage flow is 100 gpcd, what is the average flow of the industrial wastewater (in MGD)? *

Homework Answers

Answer #1

Ans) According to question,

Average daily waste water flow = Domestic wastewater flow + Industrial wastewater flow

Given,

Average daily waste water flow = 2.1 MGD or 2.1 x gal/day

Per capita waste water flow = 100 gal/capita-day

Number of person = 15000

=> Domestic wastewater flow = 100 gal /capita-day x 15000 = 1.5 x gal/day

Hence, putting values,

=> (2.1 x ) = (1.5 x ) + Industrial wastewater flow

=> Industrial wastewater flow = (2.1 - 1.5) x gal/day = 0.6 x gal/day or 0.6 MGD

Therefore, average Industrial wastewater flow is 0.60 MGD

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Wastewater treatment The Ampang Jaya Municipal Council with a population of 350,000 and several industries discharged...
Wastewater treatment The Ampang Jaya Municipal Council with a population of 350,000 and several industries discharged 11 MGD of raw sewage into an activated sludge system treatment plant. The average concentration of BOD5 is 240 mg/L and the suspended solids is 260 mg/L. If the average domestic per capita sewage flow is 225 L/c.day, what is the average flow of the industrial wastewater (in MGD)? marks) If the average BOD5 load from the domestic sewage is 55gcapita-1day-1, determine the average...
Dechlorination contact tank (Wastewater Treatment) An activated sludge plant has a design flow (average daily flow)...
Dechlorination contact tank (Wastewater Treatment) An activated sludge plant has a design flow (average daily flow) of 11 MGD. Determine dimensions of dechlorination tank. The design parameters: use 1 tank. detention time = 30 sec, depth = 10 ft, rectangular tank: L = 4 W. use maximum hourly flow (3 * Average design flow)
You have been retained to design a wastewater treatment plant using a conventional activated sludge process...
You have been retained to design a wastewater treatment plant using a conventional activated sludge process for a town of 40,000 people. The industrial flow contribution to the sewer system is 300,000 gallons per day. Effluent discharge standards require effluent BOD5 and total suspended solids concentration of <10 mg/l. Assume the following design criteria are applicable: Domestic sewage flow = 100 gal/cap/day (including I/I) BOD loading = 0.18 lbs/cap/day TSS loading = 0.20 lbs/cap/day BOD removal in primary = 33%...
A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process...
A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process followed by an activated sludge process composed of aeration tanks and a secondary clarifiers. This problem focuses on the activated sludge process. The activated sludge process receives a flow of 15 million gallons per day (MGD). The primary sedimentation process effluent has a BOD5 concentration of 180 mgBOD5/L (this concentration is often referred as S). Before flowing into the activated sludge process, the primary...
. A wastewater treatment plant is to be designed for the 5-d sustained peak flowrate given...
. A wastewater treatment plant is to be designed for the 5-d sustained peak flowrate given an average daily flow of 13 MGD. Two aerated grit chambers in parallel will provide a total detention time of 4 minutes at peak flow. Determine: a) The volume of each chamber, in m3 . b) Chamber dimensions, in m, (length and width) if the design depth is 3.5 m and W:D is 1.2:1. Is the calculated L:W within the recommended range? c) Using...
Problem #3: Biochemical Oxygen Demand (BOD) and Stream Quality A wastewater treatment plant designed for a...
Problem #3: Biochemical Oxygen Demand (BOD) and Stream Quality A wastewater treatment plant designed for a community of 45,000 people has a flow of 100 gal/person/day and a BOD5 loading of 0.2 lb/person/day. The upstream characteristics of the receiving waters are: stream flow rate = 20 cfs and BOD5 = 2 mg/L The water quality standards require the in-stream BOD5 to be less than 7 mg/L in this stretch of the river. The minimum BOD removal efficiency that the treatment...
The town of Camp Verde has been directed to upgrade its primary Waste Water Treatment Plant...
The town of Camp Verde has been directed to upgrade its primary Waste Water Treatment Plant (WWTP) to a secondary plant that can meet an effluent standard of 25 mg/L BOD5 and 30 mg/L suspended solids. They have selected a completely mixed activated sludge system for the upgrade. The existing primary treatment plant has a flow rate of 0.029 m3/s. The effluent from the primary tank has a BOD5 of 240 mg/L. Using the following assumptions, estimate the required volume...
You have been asked to provide a design for a rapid mix tank at a water...
You have been asked to provide a design for a rapid mix tank at a water treatme nt plant which has an average water temperature of 50F. The tank is to have a detention time (td= HRT) of 1.5 seconds, a mixing intensity (G) of 2,000/second, and treat a flow (Q) of 10 mgd. a. Identify the volume of reactor required (in ft^3 and gallons) b. Find the reactor dimensions (i.e., Depth and Diameter, in feet) if the rapid mix...
(Use the case of “Global Treps”) You have been selected as the project manager for the...
(Use the case of “Global Treps”) You have been selected as the project manager for the Global Treps project. You helped to run a local shark tank like event at your college last year as part of a class project, so you have a general idea of what is involved. The schedule goal is six months, and the budget is $120,000. Your favorite professor, Dr. K., and a few of her associates have agreed to fund the project. Your strengths...
What role could the governance of ethics have played if it had been in existence in...
What role could the governance of ethics have played if it had been in existence in the organization? Assess the leadership of Enron from an ethical perspective. THE FALL OF ENRON: A STAKEHOLDER FAILURE Once upon a time, there was a gleaming headquarters office tower in Houston, with a giant tilted "£"' in front, slowly revolving in the Texas sun. The Enron Corporation, which once ranked among the top Fortune 500 companies, collapsed in 2001 under a mountain of debt...