Question

A wastewater treatment plant receives an average of 3.0 MGD of wastewater flow. Two rectangular primary...

A wastewater treatment plant receives an average of 3.0 MGD of wastewater flow. Two rectangular primary clarifiers operating in parallel will treat the flow. If the length of each clarifier is four times its width, the width is 20 ft, and the depth is 10 ft, determine:

a) the overflow rate in gpd/ft2.

b) the detention time of each clarifier (in days).

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A primary clarifier, 10-ft side-water-depth, to be designed for an average flow of 1.6 MGD. The...
A primary clarifier, 10-ft side-water-depth, to be designed for an average flow of 1.6 MGD. The range of hydraulic detention times for primary clarifiers is 45 minutes to 2.5 hours. The minimum acceptable diameter, in feet (in whole-foot increments), is nearest
Problem #3: Biochemical Oxygen Demand (BOD) and Stream Quality A wastewater treatment plant designed for a...
Problem #3: Biochemical Oxygen Demand (BOD) and Stream Quality A wastewater treatment plant designed for a community of 45,000 people has a flow of 100 gal/person/day and a BOD5 loading of 0.2 lb/person/day. The upstream characteristics of the receiving waters are: stream flow rate = 20 cfs and BOD5 = 2 mg/L The water quality standards require the in-stream BOD5 to be less than 7 mg/L in this stretch of the river. The minimum BOD removal efficiency that the treatment...
Dechlorination contact tank (Wastewater Treatment) An activated sludge plant has a design flow (average daily flow)...
Dechlorination contact tank (Wastewater Treatment) An activated sludge plant has a design flow (average daily flow) of 11 MGD. Determine dimensions of dechlorination tank. The design parameters: use 1 tank. detention time = 30 sec, depth = 10 ft, rectangular tank: L = 4 W. use maximum hourly flow (3 * Average design flow)
A 14 mgd wastewater treatment plant has a primary clarifier that treats an influent with 800...
A 14 mgd wastewater treatment plant has a primary clarifier that treats an influent with 800 mg/L of solids and a removal efficiency of 55%. Sludge at the bottom of the tank is pumped at a rate of 0.1 mgd. a. What is the effluent solids concentration from the clarifier (in mg/L)? b. What is the solids concentration in the sludge at the bottom of the tank (in mg/Land %)? c. The primary sludge is further processed in a digester...
. A wastewater treatment plant is to be designed for the 5-d sustained peak flowrate given...
. A wastewater treatment plant is to be designed for the 5-d sustained peak flowrate given an average daily flow of 13 MGD. Two aerated grit chambers in parallel will provide a total detention time of 4 minutes at peak flow. Determine: a) The volume of each chamber, in m3 . b) Chamber dimensions, in m, (length and width) if the design depth is 3.5 m and W:D is 1.2:1. Is the calculated L:W within the recommended range? c) Using...
The volumetric flow to the ACME wastewater treatment plant is 25 MGD. The influent soluble BOD5...
The volumetric flow to the ACME wastewater treatment plant is 25 MGD. The influent soluble BOD5 is 200 mg/L and the effluent soluble BOD5 is 8 mg/L. The plant is designed to operate with a mean cell (biomass) residence time of 10 days. The yield coefficient is 0.6 mg biomass/mg substrate, and the biomass decay rate is 0.09/day. The reactor is to operate at a biomass concentration of 2500 mg/L. The thickened underflow biomass concentration from the secondary clarifier is...
You have been retained to design a wastewater treatment plant using a conventional activated sludge process...
You have been retained to design a wastewater treatment plant using a conventional activated sludge process for a town of 40,000 people. The industrial flow contribution to the sewer system is 300,000 gallons per day. Effluent discharge standards require effluent BOD5 and total suspended solids concentration of <10 mg/l. Assume the following design criteria are applicable: Domestic sewage flow = 100 gal/cap/day (including I/I) BOD loading = 0.18 lbs/cap/day TSS loading = 0.20 lbs/cap/day BOD removal in primary = 33%...
A rectangular horizontal-flow sedimentation basin in a conventional water treatment plant has been designed to treat...
A rectangular horizontal-flow sedimentation basin in a conventional water treatment plant has been designed to treat a flow of 50,000 m3 /day. It has a length = 80 m, width = 20 m, and depth = 3.6 m. For this problem, assume temperature = 20 °C (density of water = 103 kg/m3 and viscosity = 10-3 kg/m·s) and laminar flow. a. What is the hydraulic detention time? Does this meet the typical criteria for this type of sedimentation basin? b....
A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process...
A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process followed by an activated sludge process composed of aeration tanks and a secondary clarifiers. This problem focuses on the activated sludge process. The activated sludge process receives a flow of 15 million gallons per day (MGD). The primary sedimentation process effluent has a BOD5 concentration of 180 mgBOD5/L (this concentration is often referred as S). Before flowing into the activated sludge process, the primary...
The old plant grit removal process, that is used to treat the average flow of 15...
The old plant grit removal process, that is used to treat the average flow of 15 MGD consists of horizontal flow grit chamber that have a volume of 15,000 gallons. To reduce the footprint of the process, the new plant will use a Vortex type grit chamber that is capable of achieving the same grit removal performance in a fraction of the reactor volume. Remember that the flow to the new plant is 10 MGD . 11. What is the...