Question

You are a Project Manager of a project to build a ten-story building. At the beginning...

  1. You are a Project Manager of a project to build a ten-story building. At the beginning of the project you were targeted to build one floor per month. The planned cost per floor is €500,000. It is now month 8 and you have completed 9 floors and the total costs to date are €4,750,000. Calculate the following:
    1. CV;
    2. SV;
    3. CPI;
    4. EAC;

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
1.) A project manager is analyzing progress on a project to make a 10-minute documentary. It's...
1.) A project manager is analyzing progress on a project to make a 10-minute documentary. It's the end of week two on this three week project. The actual cost is $72,000. They have 7 minutes of usable film. The budgeted total cost is $100,000. Determine PV,EV,CV,CPI,SV, ans SPI a. First, map each description to an EVA category. Then, fill in the table. Week AC PV EV CV CPI SV SPI 2 72,000 b. What do the SPI and CPI values...
National Bank has several departments that occupy both floors of a two-story building. The departmental accounting...
National Bank has several departments that occupy both floors of a two-story building. The departmental accounting system has a single account, Building Occupancy Cost, in its ledger. The types and amounts of occupancy costs recorded in this account for the current period follow. Depreciation—Building $ 36,000 Interest—Building mortgage 54,000 Taxes—Building and land 16,000 Gas (heating) expense 5,000 Lighting expense 6,000 Maintenance expense 11,000 Total occupancy cost $ 128,000 The building has 8,000 square feet on each floor. In prior periods,...
A construction company is deciding whether to build a road or a building at a new...
A construction company is deciding whether to build a road or a building at a new township site. The road will cost $50 million to build in 2019 and will require a re-construction every 5 years of the road’s operation at the cost of $10 million. The annual maintenance costs of the road are $5 million per year for the first ten years of the road’s operation and $7 million per year thereafter. The building will cost $100 million to...
City Bank has several departments that occupy both floors of a two-story building. The departmental accounting...
City Bank has several departments that occupy both floors of a two-story building. The departmental accounting system has a single account, Building Occupancy Cost, in its ledger. The types and amounts of occupancy costs recorded in this account for the current period follow.          Depreciation—Building $ 27,000   Interest—Building mortgage 40,500   Taxes—Building and land 12,000   Gas (heating) expense 3,750   Lighting expense 4,500   Maintenance expense 8,250      Total occupancy cost $ 96,000       The building has 6,000 square feet on...
A. You are a project manager working on a new residential building. The work is getting...
A. You are a project manager working on a new residential building. The work is getting delayed for some technical reasons. B. Write an email to your client/customer apologising for the delay and request him to extend the deadline for one month.
We are building a simple storage facility for covered storage of bulk raw materials.   The Budget...
We are building a simple storage facility for covered storage of bulk raw materials.   The Budget is as Follows: The concrete floor is budgeted at $5000. The walls and doors are budgeted at $9000. The roof is budgeted at $5000. The plan is as follows:   The floor will require 2 days to complete, the walls and doors will require 4 days to complete, and the roof will require 2 days to complete. Actual work Complete to Date is as follows:...
The figure below depicts the schedule for a small project. The budgeted cost is shown within...
The figure below depicts the schedule for a small project. The budgeted cost is shown within the schedule bar for each activity. For the sake of simplicity, assume costs are distributed evenly throughout an activity's duration. For example, Activity A will take four weeks and has a total budgeted cost of $4,000. Consequently, expected expenditures for A will be $1,000 per week. In contrast, Activity B will cost $2,000 per week. Precedence relationships are as follows: A must precede B...
You are the project manager for a new multimillion-dollar building renovation for your organization. The company...
You are the project manager for a new multimillion-dollar building renovation for your organization. The company needs to maximize the space that it has, and the best approach is to do a staggered build-out in order to better maximize the space in the existing building. You feel that the best approach was to negotiate with multiple contractors on a fixed-price contract. Different contractors discussed other contracts with you, particularly ones to address the current market fluctuations in the raw materials...
Assume you have completed a capital budgeting analysis of building a new plant on land you...
Assume you have completed a capital budgeting analysis of building a new plant on land you own, and the project's NPV is $100 million. You now realize that instead of building the plant, you could build a parking garage, and would generate a pre tax revenue of $22 million. The project would last 3 years, the corporate tax rate is 40%, and the WACC is 9%. What is the new NPV of the project, after incorporating the effect of the...
Chase Opportunity has selected you as the project manager to oversee their latest project – Chase...
Chase Opportunity has selected you as the project manager to oversee their latest project – Chase Retail Complex. Chase’s vision is to build four (4) 10,000 square foot buildings (see concept drawing below). Within each building, suite sizes may vary per customer rental agreement (estimating five (5) 2,000 square foot areas per building). Chase has the funds to cover the total project costs and they have already purchased the land for construction. Chase wants to start construction January 2, 2007...