1.) The pile load test data of a 300 mm diameter and 15 m long pile...

1.) The pile load test data of a 300 mm diameter and 15 m long pile is as
follows . Design a pile group system to carry a load of 4000 kN. Compute
the settlement of the pile group for the designed load.   

Load in kN 0 500 1000 1500 2000 2500
Settlement in mm 0 8.5 16.5 25.5 38.0    60.0



2.) Design a retaining wall for a 8 m sandy soil backfill with unit weight as
17.5 kN/m3 and angle of internal friction 30 degrees. Check the stability
of the designed retaining wall.