Assume that if the product requested is not in stock,
it needs to be manufactured
before the order handling can continue. In this way, an order can
never be rejected.
To manufacture a product, the required raw materials have to be
ordered. Two
preferred suppliers provide different types of raw material.
Depending on the prod-
uct to be manufactured, raw materials may be ordered from either
Supplier 1 or
Supplier 2, or from both. Once the raw materials are available, the
product can be
manufactured and the order can be confirmed. On the other hand, if
the product
is in stock, it is retrieved from the warehouse before confirming
the order. Then
the process continues normally. After confirming the order, the
shipment address is
received and the requested product is shipped while the invoice is
emitted and the
payment is received. Afterwards, the order is archived and the
process completes.
2. Simulation Objective(s)
- State the objective(s) of carrying out your simulation
project
2- Simulation objective in this process is to make the system efficient by analysing all the factors which are influencing the production process and shipping the product to the end customer at the earliest and with out facing stockout situation.The process of getting order and delivering the order to the requisite person need different process and in any typical manufacturing organization it should be standardized and efficient. The objective of the simulation is to implement an efficient process.