Question

There are two alternatives for a water supply project in a city. The details of cash...

There are two alternatives for a water supply project in a city. The details of cash flow of the alternatives are shown below.

Alternative-1

Initial cost = BD 100,000
Annual operating cost = BD 1000
Cost of renovation = BD 1700 at the end of every 10 years
One time upgrading cost = BD 20,000 at the end of 15 year

Alternative-2

Initial cost = BD 120,000
Annual operating cost = BD 900
Cost of renovation = BD 18,000 at the end of every 16 years
Compare the alternatives on the basis of capitalized cost and find out the economical alternative if the rate of interest is 7% per year

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Which of the following alternatives is superior over a 30 year period, if the interest rate...
Which of the following alternatives is superior over a 30 year period, if the interest rate is 5%? Determine the EUAC for each alternative, and also calculate the Capitalized Cost for each. a. Green roof costing $50,000 with a life of 30 years; utility costs $12,000/year b. Standard roof costing $20,000 with life of 10 years; utility costs $18,000/year
To increase the water supply in a city, there are several alternatives to building waterways. Build...
To increase the water supply in a city, there are several alternatives to building waterways. Build tunnels through the mountain or use pipes around the mountain. To build the tunnels it takes an initial investment value of $5.5 million but can operate forever without maintenance costs. As for installing the pipeline, it costs an initial investment of $5 million, with no maintenance costs, but a useful lifespan of only up to 50 years with a salvage value of 0. Which...
Two sites are currently under consideration for a bridge to cross the Nile River at Elmansoura...
Two sites are currently under consideration for a bridge to cross the Nile River at Elmansoura city, Dakahlia. The first alternative, Suspension bridge, would have a first cost of L.E 30 million with annual maintenance costs of L.E. 15,000. In addition, the concrete deck would have to be resurfaced every 10 years at a cost of L.E. 50,000. The second alternative, Truss Bridge and approach roads, are expected to cost L.E 12 million and have annual maintenance costs of L.E....
Compare two mutually exclusive alternatives below using annual worth analysis at MARR = 10% per year....
Compare two mutually exclusive alternatives below using annual worth analysis at MARR = 10% per year. Which alternative should be selected? Alternatives Alternative 1 Alternative 2 First cost, $ -90,000 -750,000 Annual cost, $/year -50,000 -10,000 Salvage value, $ 8,000 - Life, years 5 ∞ Alternative 2 and -$85,000 Alternative 1 and -$72,450 Alternative 2 and -$72,450 Alternative 1 and -$65,000
Two projects have the estimated details as shown in Table 2.2. Construct cash flow diagrams for...
Two projects have the estimated details as shown in Table 2.2. Construct cash flow diagrams for the two projects and use present worth (PW) analysis to determine which project should be selected at the rate of 12% per year Table 2.2: Details for Project R and Project S Project R Project S Initial cost (RM) 30,000 20,000 Annual cost (RM) 7,000 for first year, increasing by 1,000 per year for subsequent years 0 for the first 3 year, 5,000 from...
A large textile company is trying to decide among three alternatives of sludge dewatering processes. The...
A large textile company is trying to decide among three alternatives of sludge dewatering processes. The costs associated with these alternatives are shown below. Alternative Y will need an upgrade of $9700 at the end of year 2. At the end of year 2, alternative Z would be replaced with another alternative Z having the same installed and operating costs. If the MARR is 14% per year, which alternative should be chosen? Alternative X Y Z Installed costs $68,500 $48,500...
Consider the following two mutually exclusive alternatives for reclaiming a deteriorating​ inner-city neighborhood​ (one of them...
Consider the following two mutually exclusive alternatives for reclaiming a deteriorating​ inner-city neighborhood​ (one of them must be​ chosen). Notice that the IRR for both alternatives is 27.18​%. a. If MARR is 15​% per​ year, which alternative is​ better? b. What is the IRR on the incremental cash flow​ [i.e.,Upper Δ​(Y−X​)]? c. If the MARR is 27.5​% per​ year, which alternative is​ better? d. What is the simple payback period for each​ alternative? EOY x y 0 -$100,000 -$100,000 1...
Choose between the following two scenarios. Base your decision on Annualized Worth AW. Show the details...
Choose between the following two scenarios. Base your decision on Annualized Worth AW. Show the details of the calculation for full credit. A         Initial Cost 120,000      I = 6 %    Revenue per year 80,000               Maintenance Expenses First year 4000   grows each year by 1500 ( G = 1500 / yr)                 Operating Expenses     First year 6000 grows each year by 500.            Planning Horizon 20 years.   Salvage Value 10,000. B          Initial Cost 400,000    I = 3%                 Revenue     First...
J. Renner Inc. has been offered a four-year contract to supply parts for a local business....
J. Renner Inc. has been offered a four-year contract to supply parts for a local business. The cash flow information for the project is detailed below: Cost of equipment $250,000 Working capital required $20,000 Upgrading equipment in 2 years $90,000 Salvage value of equipment in 4 years $10,000 Annual net cash inflow $120,000 The working capital would be released at the end of the contract in 4 years. The cost of capital is 14%. Compute the NPV of the project:...
Alternative A has an initial acquisition cost of $10,000 and an annual average operating and maintenance...
Alternative A has an initial acquisition cost of $10,000 and an annual average operating and maintenance cost of $1402 per down time. Alternative B has a higher acquisition cost of $20,000, but has a lower annual average operating and maintenance cost of $500 per down time. With an expected lifetime of 5 years for both alternatives, and an annual interest of 5%, determine the break even number of down times per year. please show all work
ADVERTISEMENT