Question

Consider the raw data generated by mass spectrometry for an element: mass (amu) % abundance 89.90470...

Consider the raw data generated by mass spectrometry for an element:

mass (amu) % abundance
89.90470 100.0
90.90565 21.8
91.90504 33.3
93.90632 33.8
95.90828 5.4

1. Use the given data to calculate the average atomic mass of this element.

2. What is the symbol for this element?

3. What is the name of this element?

4. What period is this element in?

5. What group is this element in?

Homework Answers

Answer #1

Consider the raw data generated by mass spectrometry for an element:

mass (amu)

% abundance

89.90470

100.0

90.90565

21.8

91.90504

33.3

93.90632

33.8

95.90828

5.4

1. Use the given data to calculate the average atomic mass of this element.

average atomic mass= mass * % abundance of all isomers / total number of atoms

=89.90470*100+90.90565*100+91.90504*100+93.90632*100+95.90828*100/194.3

= 46252.999 /194.3

=238.049402985 amu

2. What is the symbol for this element?

The symbol for this element is U

3. What is the name of this element?

Uranium

4. What period is this element in?

period 7

5. What group is this element in?

group n/a, f-block

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A fictional element has two isotopes. Isotope 1 has a mass of 70.0 amu and a...
A fictional element has two isotopes. Isotope 1 has a mass of 70.0 amu and a relative abundance of 80.28%. Isotope 2 has a mass of 87.0 amu. Find the relative abundance (%) of Isotope Calculate the average atomic mass of the fictional element.
The average atomic mass of nickel is 58.693 amu. Given the data in the following table,...
The average atomic mass of nickel is 58.693 amu. Given the data in the following table, what is the natural abundance of nickel-64? 58Ni: 57.935 amu 68.0769% abundance 60Ni: 59.931 amu 26.2231% abundance 61Ni: 60.931 amu 1.1399% abundance 62Ni: 61.928 amu 3.6345% abundance 64Ni: 63.928 amu ? % abundance
Med Student Sleep Average (Raw Data, Software Required): Here we consider a small study on the...
Med Student Sleep Average (Raw Data, Software Required): Here we consider a small study on the sleep habits of med students and non-med students. The study consists of the hours of sleep per night obtained from 30 non-med students and 25 med students. The sample data is given in the table below. Test the claim that, on average, the mean hours of sleep for all med students is different from that for non-med students. Test this claim at the 0.05...
Med Student Sleep Average (Raw Data, Software Required): Here we consider a small study on the...
Med Student Sleep Average (Raw Data, Software Required): Here we consider a small study on the sleep habits of med students and non-med students. The study consists of the hours of sleep per night obtained from 30 non-med students and 25 med students. The sample data is given in the table below. Test the claim that, on average, the mean hours of sleep for all med students is different from that for non-med students. Test this claim at the 0.05...
Med Student Sleep Average (Raw Data, Software Required): Here we consider a small study on the...
Med Student Sleep Average (Raw Data, Software Required): Here we consider a small study on the sleep habits of med students and non-med students. The study consists of the hours of sleep per night obtained from 30non-med students and 25 med students. The sample data is given in the table below. Test the claim that, on average, the mean hours of sleep for all med students is different from that for non-med students. Test this claim at the 0.01 significance...
(Raw Data, Software Required): Here we consider a small study on the sleep habits of med...
(Raw Data, Software Required): Here we consider a small study on the sleep habits of med students and non-med students. The study consists of the hours of sleep per night obtained from 30 non-med students and 25med students. The sample data is given in the table below. Test the claim that, on average, the mean hours of sleep for all med students is different from that for non-med students. Test this claim at the 0.01 significance level. (a) The claim...
Med Student Sleep Average (Raw Data, Software Required): Here we consider a small study on the...
Med Student Sleep Average (Raw Data, Software Required): Here we consider a small study on the sleep habits of med students and non-med students. The study consists of the hours of sleep per night obtained from 30 non-med students and 25 med students. The sample data is given in the table below. Test the claim that, on average, the mean hours of sleep for all med students is different from that for non-med students. Test this claim at the 0.01...
Consider the data contained in the table below, which lists 30 monthly excess returns to two...
Consider the data contained in the table below, which lists 30 monthly excess returns to two different actively managed stock portfolios (A and B) and three different common risk factors (1, 2, and 3). (Note: You may find it useful to use a computer spreadsheet program such as Microsoft Excel to calculate your answers.) Period Portfolio A Portfolio B Factor 1 Factor 2 Factor 3 1 1.02 % 0.00 % 0.02 % -0.94 % -1.62 % 2 7.52 6.64 6.82...
Reliable Construction Company Reliable Construction Company is deciding how much they will bid for a contract...
Reliable Construction Company Reliable Construction Company is deciding how much they will bid for a contract to build a new plant for a major manufacturer. Based on the specifications of the new plant, Reliable has estimated what the company’s total cost would be if it were to undertake the project. Reliable estimates that the project would cost $4.55 million (M) and are thinking about bidding $5.4 M in the proposal. Reliable also estimates that the cost of preparing a proposal...
Reliable Construction Company Reliable Construction Company is deciding how much they will bid for a contract...
Reliable Construction Company Reliable Construction Company is deciding how much they will bid for a contract to build a new plant for a major manufacturer. Based on the specifications of the new plant, Reliable has estimated what the company’s total cost would be if it were to undertake the project. Reliable estimates that the project would cost $4.55 million (M) and are thinking about bidding $5.4 M in the proposal. Reliable also estimates that the cost of preparing a proposal...