Question

Formulate the situation as a system of inequalities. (Let x represent the number of dinghies the...

Formulate the situation as a system of inequalities. (Let x represent the number of dinghies the company can manufacture and y represent the number of rowboats.)

A boat company manufactures aluminum dinghies and rowboats. The hours of metal work and painting needed for each are shown in the table, together with the hours of skilled labor available for each task. How many of each kind of boat can the company manufacture?

(hours)            Dinghy                  Rowboat              Labor Available

Metal Work         2                              3                           120

Painting              2                              2                           100

(                   )    (labor for metal work)

(                   )    (labor for painting)

x ≥ 0, y ≥ 0

Sketch the feasible region.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Consider the feasible region in the xy-plane defined by the following linear inequalities. x ≥ 0...
Consider the feasible region in the xy-plane defined by the following linear inequalities. x ≥ 0 y ≥ 0 x ≤ 10 x + y ≥ 5 x + 2y ≤ 18 Part 2 Exercises: 1. Find the coordinates of the vertices of the feasible region. Clearly show how each vertex is determined and which lines form the vertex. 2. What is the maximum and the minimum value of the function Q = 60x+78y on the feasible region?
A division of the Winston Furniture Company manufactures dining tables and chairs. Each table requires 40...
A division of the Winston Furniture Company manufactures dining tables and chairs. Each table requires 40 board feet of wood and 3 labor-hours. Each chair requires 16 board feet of wood and 4 labor-hours. The profit for each table is $40, and the profit for each chair is $30. In a certain week, the company has 3200 board feet of wood available and 520 labor-hours available. How many tables and chairs should Winston manufacture to maximize its profit? (Let x...
A pet food manufacturer produces two types of food: Regular and Premium. A 20kg bag of...
A pet food manufacturer produces two types of food: Regular and Premium. A 20kg bag of regular food requires 3 hours to prepare and 5 hours to cook. A 20kg bag of premium food requires 3 hours to prepare and 6 hours to cook. The materials used to prepare the food are available 9 hours per day, and the oven used to cook the food is available 16 hours per day. The profit on a 20kg bag of regular food...
A division of the Winston Furniture Company manufactures x dining tables and y chairs. Each table...
A division of the Winston Furniture Company manufactures x dining tables and y chairs. Each table requires 40 board feet of wood and 3 labor-hours. Each chair requires 16 board feet of wood and 4 labor-hours. In a certain week, the company has 3200 board feet of wood available and 520 labor-hours. If the profit for each table is $50 and the profit for each chair is $18, how many tables and chairs should Winston manufacture to maximize its profits...
1. Suppose the equation p(x,y)=-2x^2+80x-3y^2+90+100 models profit when x represents the number of handmade chairs and...
1. Suppose the equation p(x,y)=-2x^2+80x-3y^2+90+100 models profit when x represents the number of handmade chairs and y is the number of handmade rockers produced per week. (1) How many chairs and how many rockers will give the maximum profit when there is not constraint? (2) Due to an insufficient labor force they can only make a total of 20 chairs and rockers per week (x + y = 20). So how many chairs and how many rockers will give the...
A company produces two models of products, SUPER and ULTRA. Each SUPER model generates a profit...
A company produces two models of products, SUPER and ULTRA. Each SUPER model generates a profit of $8, and each ULTRA model generates a profit of $5. The table below shows how many minutes are required to produce each model on two different machines with maximum available time. How many products of each model must be produced to maximize profit? How much is the maximum profit? SUPER ULTRA Time Available Machine 1 3 minutes 2 minutes 360 minutes Machine 2...
26) Let X represent the number of tires with low air pressure on a randomly chosen...
26) Let X represent the number of tires with low air pressure on a randomly chosen car. The probability distribution of X is as follows. x 0 1 2 3 4 P x 0.1 0.3 0.2 0.1 0.3 Send data to Excel Part: 0 / 6 0 of 6 Parts Complete Part 1 of 6 (a) Find P 2 . = P 2 25) Determine whether the table represents a discrete probability distribution. Explain why or why not. x P...
The data below represent the number of days​ absent, x, and the final​ grade, y, for...
The data below represent the number of days​ absent, x, and the final​ grade, y, for a sample of college students at a large university. Complete parts​ (a) through​ (e) below. No. of​ absences, x 0 1 2 3 4 5 6 7 8 9 Final​ grade, y 88.6 85.7 82.6 80.1 77.177.1 72.672.6 63.2 67.4 64.4 61.4 ​(a) Find the​ least-squares regression line treating the number of​ absences, x, as the explanatory variable and the final​ grade, y, as...
16- Your total pay y is proportional to the number of hours x that you work....
16- Your total pay y is proportional to the number of hours x that you work. Suppose in 2 hours your wage is $24. a) Write an equation that represents the situation described above. b) How many hours must you work to earn $192? c) Is the equation you found in part (a) represent a mathematical or statistical model? Explain.
X Company uses a plantwide overhead allocation system, with direct labor hours as the cost driver....
X Company uses a plantwide overhead allocation system, with direct labor hours as the cost driver. Budgeted overhead for the year is $923,000. The following annual budgeted and actual information is available for the only three products that it produces - X, Y, Z: X Y Z Units of production 950 37,900 3,300 Direct labor hours per unit 7 2 5 Direct labor wage rate $16.00 $21.00 $26.00 How much overhead was allocated to Product Z?