Question

What are the risks if the Job scheduling system is not properly controlled?

What are the risks if the Job scheduling system is not properly controlled?

Homework Answers

Answer #1

If the Job scheduling system is not properly controlled, it would lead to following risks:

1. It would lead to chaos in operations due to mismanagement of job schedules and might lead to wastage of time and other resources.

2. It would enable the workflow inefficient and would result in loss of productivity.

3. It can lead to an increase in employee conflicts due to stressed and inefficiently managed workplace. This would also result in increase employee turnover and low retention rates.

4. It can bring losses to the firm in form of increased costs and low quality of products due to inefficient job scheduling.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Which scheduling process is provably optimal? priority scheduling round-robin scheduling shortest job first scheduling All of...
Which scheduling process is provably optimal? priority scheduling round-robin scheduling shortest job first scheduling All of the above None of the above
Assume you are going on a job interview. Considering your personal preferred work schedule, what scheduling...
Assume you are going on a job interview. Considering your personal preferred work schedule, what scheduling practices would be most satisfying to you and might lead you to accept employment with the organization? What scheduling practices might cause you to look elsewhere for a job? Develop a list of questions to ask your potential employer regarding scheduling practices in his or her organization.
What is the average waiting time for Processes If the Operating System uses the Priority Scheduling...
What is the average waiting time for Processes If the Operating System uses the Priority Scheduling (PS) Scheduling Algorithm? (P1=20 ms, P2=15 ms, P3=10 ms, P4=5 ms) Priority Order: P1, P4, P3, P2
1. What is the average waiting time for Processes If the Operating System uses the Shortest-Job-First...
1. What is the average waiting time for Processes If the Operating System uses the Shortest-Job-First (SJF) Scheduling Algorithm? (P1=5 ms, P2=10 ms, P3=15 ms) 2. How many page faults occur in the Optimum Page Replacement algorithm (OPR) with the following reference string for three-page frames?    Reference String: 4,2,1,3,2,3,4,1 3. What is the average waiting time for Processes If the Operating System uses Shortest-Job-Remaining-First (SJRF) Scheduling Algorithm? (P1=5 ms, P2=10 ms, P3=15 ms) Arrival Time ( P1=0 ms, P2=5...
Assume that a system works properly if at least three out of five components work properly....
Assume that a system works properly if at least three out of five components work properly. Assume all components have equal reliability r. Compute the probability that the system works properly. Now assume the r=.9. What is the reliability of the system?
Can all risks be controlled? Explain why or why not providing three reasons to support your...
Can all risks be controlled? Explain why or why not providing three reasons to support your position. has to be 250 minimum
(management of plastics) what are the risks and consequences of designing a system that manages solid...
(management of plastics) what are the risks and consequences of designing a system that manages solid waste? to clarify if we want to design a system that minimises the negative impacts on the environment and considering the community to be involved. what are the risks of designing it ? what are the consequences of the risk? thanks
Compare Earliest-Deadline First (EDF) scheduling against Rate-Monotonic (RM) scheduling. Now, consider an overloaded system, i.e., the...
Compare Earliest-Deadline First (EDF) scheduling against Rate-Monotonic (RM) scheduling. Now, consider an overloaded system, i.e., the total CPU utilization of all tasks is higher than 100%. In your opinion, between EDF and RM, which one is better, and from what perspective?
What is the purpose of the job cost sheet in a job order costing system?
What is the purpose of the job cost sheet in a job order costing system?
what is a integrated system of people processes and procedures that minimize or eliminate business risks
what is a integrated system of people processes and procedures that minimize or eliminate business risks