Question

If the variable manufacturing overhead is​ $50 per unit for a​ company, the lowest budgeted manufacturing...

If the variable manufacturing overhead is​ $50 per unit for a​ company, the lowest budgeted manufacturing cost per unit can be obtained by using normal capacity utilization as the denominator level capacity.

True

False

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
True-False ____1. Budgeted overhead cost rates can be expressed as an amount per unit of output...
True-False ____1. Budgeted overhead cost rates can be expressed as an amount per unit of output or per unit of input. ____2. There is no fundamental difference between the budgeted variable-overhead cost rate per unit of input and the budgeted price of individual direct materials. ____3. The variable-overhead spending variance is unfavorable if the actual variable overhead cost rate per unit of input (the cost-allocation base) is greater than the budgeted variable overhead cost rate per unit of input. ____4....
1) Determining Budgeted Overhead The overhead application rate for a company is $12 per unit, made...
1) Determining Budgeted Overhead The overhead application rate for a company is $12 per unit, made up of $7 per unit of fixed overhead and $5 per unit of variable over- head. Normal capacity is 10,000 units. In one month, there was a favorable flexible budget variance of $2,500. Actual overhead for the month was $110,000 and actual units produced were 15,125. Based on this information, determine the amount of the budgeted overhead for the actual level of production. 2)...
The overhead application rate for a company is 10$ per unit, made up of $6 per...
The overhead application rate for a company is 10$ per unit, made up of $6 per unit fixed overhead and 4$ per unit of variable overhead. Normal capacity is 10000 units. In one month there was a favoeable flexibe budgeted variance of 2500$. Actual overhead for the month was 110.000$ abd actual units produced were 13125. Determine the amount of the budgeted overhead for the actual level of production.
The standard variable overhead cost rate for the Gordon Company is $ 12.25 per unit. Budgeted...
The standard variable overhead cost rate for the Gordon Company is $ 12.25 per unit. Budgeted fixed overhead cost is $54,000. The company budgeted 6,000 units for the current period and actually produced 3,700 finished units. What is the fixed overhead volume​ variance Assume the allocation base for fixed overhead costs is the number of units expected to be produced. A. $8,675 favorable B. $20,700 unfavorable C. $8,675 unfavorable D. $20,700 favorable
Unkar Plutt Inc., is a recycling shop that reworks junk into artwork. Manufacturing overhead (both variable...
Unkar Plutt Inc., is a recycling shop that reworks junk into artwork. Manufacturing overhead (both variable and fixed) is allocated to products on the basis of budgeted machine-hours. In 2016, budgeted fixed manufacturing overhead cost was $17,000,000. Budgeted variable manufacturing overhead was $10 per machine-hour. The denominator level was 1,000,000 machine-hours. Required: 1. Prepare a graph for variable manufacturing overhead and fixed manufacturing overhead. The graph should display how Unkar Plutt Inc., variable and fixed manufacturing overhead costs will be...
4-24 Budgeted manufacturing overhead rate, allocated manufacturing overhead. Gammaro Company uses normal costing. It allocates manufacturing...
4-24 Budgeted manufacturing overhead rate, allocated manufacturing overhead. Gammaro Company uses normal costing. It allocates manufacturing overhead costs using a budgeted rate per machine-hour. The following data are available for 2017: Budgeted manufacturing overhead costs $4,600,000 Budgeted machine-hours      184,000 Actual manufacturing overhead costs $4,830,000 Actual machine-hours      180,000 Required: Calculate the budgeted manufacturing overhead rate. Calculate the manufacturing overhead allocated during 2017. Calculate the amount of under- or overallocated manufacturing overhead. Why do Gammaro’s managers need to calculate this amount?
flexible budgets. at normal capacity of 16,000 units, budgeted manufacturing overhead is: $48,000 variable and $270,000...
flexible budgets. at normal capacity of 16,000 units, budgeted manufacturing overhead is: $48,000 variable and $270,000 fixed. If stone had actual overhead costs of $321,000 in total, for 18000 units produced, the difference between actual and budgeted total costs is: $....favourable.
Dilia Company incurred manufacturing overhead cost for the year as follows: Direct materials $ 50 /unit...
Dilia Company incurred manufacturing overhead cost for the year as follows: Direct materials $ 50 /unit Direct labor $ 35 /unit Manufacturing overhead Variable $ 15 /unit Fixed ($25/unit for 1,500 units) $ 37,500 Variable selling and administrative expenses $ 10,500 Fixed selling and administrative expenses $ 20,000 The company produced 1,500 units and sold 1,200 of them at $225 per unit. Assume that the production manager is paid a 2 percent bonus based on the company’s net income. Required...
Buller Company uses normal costing. It allocates manufacturing overhead costs using a budgeted rate per machine-hour....
Buller Company uses normal costing. It allocates manufacturing overhead costs using a budgeted rate per machine-hour. The following data are available for 2019: Budgeted manufacturing overhead costs $4,800,000 Budgeted machine-hours 180,000 Actual manufacturing overhead costs $3,990,000 Actual machine-hours 150,000 Required: 1. Calculate the budgeted manufacturing overhead rate. 2. Calculate the manufacturing overhead allocated during 2019. 3. Calculate the amount of under- or overallocated manufacturing overhead. Why do Buller’s managers need to calculate this amount?
Sullivan Company is preparing its Manufacturing Overhead budget for the second quarter of the year. Budgeted...
Sullivan Company is preparing its Manufacturing Overhead budget for the second quarter of the year. Budgeted variable factory overhead is $3.00 per unit produced; budgeted fixed factory overhead is $75,000 per month, with $16,000 of this amount being factory depreciation. Refer to Sullivan Company. If the budgeted production for April is 6,000 units, then the total budgeted factory overhead for April is: A. $82,000 B. $93,000 C. $85,000 D. $77,000