Question

The initial step in achieving the efficiency of a just-in-time system is to A. stop ordering...

The initial step in achieving the efficiency of a just-in-time system is to

A. stop ordering materials for inventory.

B. replace laborers with machines.

C. identify products that are not profitable.

D. redesign the plant layout.

Homework Answers

Answer #1

Answer: D

Plant layout should be redesigned initially.

JIT is an inventory technique that increases efficiency and decreases cost (by reducing waste) in production.

Plant layout or settings should be done in a way so that the process of work should be uninterrupted. Once there is easy flow of, its efficiency increases.

Other options are not correct:

A: the ordering can’t be stopped completely, but it could be minimized.

B: such replacement can increase cost, which is not JIT strategy.

C: this is irrelevant.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Question text Just-in-Time Inventory The Dixon Manufacturing Company uses the perpetual inventory system with its raw...
Question text Just-in-Time Inventory The Dixon Manufacturing Company uses the perpetual inventory system with its raw material inventory. Dixon plans to include raw material costing $2,000,000 in the products that it manufactures. John Dixon, president of the company, wants to adopt the just-in-time manufacturing philosophy for the raw materials inventory. He wants to have only the raw material needed for the next day’s production at the end of each day. The factory operates 250 days each year. Historically, the raw...
I know the answers I just need detailed step-by-step instructions. You are given the following information:...
I know the answers I just need detailed step-by-step instructions. You are given the following information: The Courtney Company has the following information for the Assembly Department for October 2011: Materials purchased $ 40,000 Materials used 44,000 Direct labor 30,000 Actual manufacturing overhead 56,000 Cost of goods completed and transferred to the Finishing Dept. 120,000 Overhead rate is 200 percent of direct labor costs. The Courtney Company uses a process costing system for the Assembly Department.               7a. Refer to...
Which of the following is not a typical outcome of implementing the just-in-time system? a. reduction...
Which of the following is not a typical outcome of implementing the just-in-time system? a. reduction of costs b. lower defect rates c. increased manufacturing flexibility d. increased sales volume
1) he initial processing department had a beginning inventory of 750 units and an ending inventory...
1) he initial processing department had a beginning inventory of 750 units and an ending inventory of 1,350 units, and it started 9,500 units into production. How many were transferred out to the next department? A.750 B. 1,350 C. 8,900 D. 10,250 2) There were 1,000 units in ending inventory after transferring 16,000 units to finished goods inventory. If the beginning inventory was 2,000 units, how many units were started in process? a. 1,000 b. 2,000 c. 15,000 d. 17,000...
Handcrafts Inc. manufactures to customer order using the job order cost system. For the month just...
Handcrafts Inc. manufactures to customer order using the job order cost system. For the month just ended, it registered the following data: Beginning work in process: P300,000 Cost of Orders completed: 2,400,000 Cost of Orders shipped: 2,000,000 Materials issued for the month: 1,700,000 Direct labor cost: 800,000 Factory overhead rate: 150% of direct labor cost The ending work in process inventory was: Select one: a. P1,400,000 b. P1,600,000 c. P500,000 d. P700,000
I know the answers I just need detailed step-by-step instructions.               15. Colorado Furniture had...
I know the answers I just need detailed step-by-step instructions.               15. Colorado Furniture had the following historical accounting data, per hundred board feet, concerning one of its products: Finished shelving: Direct materials $30 Direct labor 16 Variable overhead 10 Fixed overhead 12 Variable selling expenses 8 Fixed selling expenses 4 The shelving is normally transferred internally from the Cutting Division to the Finishing Division. It also may be sold externally for $110 per hundred board feet. The minimum...
1. Which of the following is FALSE regarding the budgeting system? A. The budgeting system aims...
1. Which of the following is FALSE regarding the budgeting system? A. The budgeting system aims to communicate management's plans throughout the entire organization. B. The budgeting system generates a detailed qualitative plan for acquiring and using financial and other resources over a specified forthcoming time period. C. The budgeting system provides a means of allocating resources to those parts of the organization where they can be used most effectively. D. The budgeting system helps managers uncover potential bottlenecks before...
Which of the following is not a method to mitigate the incentive to overproduce in an...
Which of the following is not a method to mitigate the incentive to overproduce in an absorption costing system? A. Charge managers inventory holding costs B. Evaluate managers on residual income C. Require senior management approval for all inventory purchases D. Institute a Just-in-time (JIT) production system Which of the following statements about variable costing systems is true? A. Variable overhead costs are treated as period costs B. Fixed overhead costs are treated as product costs C. Only direct materials...
Nosemer Company produces engine parts for large motors. The company uses a standard cost system for...
Nosemer Company produces engine parts for large motors. The company uses a standard cost system for production costing and control. The standard cost sheet for one of its higher volume products (a valve), is as follows: Direct materials (5 lbs. @ $4.00) $20.00 Direct labor (1.4 hrs. @ $10.50) 14.70 Variable overhead (1.4 hrs. @ $6.00) 8.40 Fixed overhead (1.4 hrs. @ $3.00) 4.20 Standard unit cost $47.30 During the year, Nosemer experienced the following activity relative to the produc-...
1. Match to appropriate definition A. Allocation Base B. Cost of goods manufactured C. Cost pool...
1. Match to appropriate definition A. Allocation Base B. Cost of goods manufactured C. Cost pool D. Indirect labor cost E. Job - Order costing system F. Just in time manufacturing G. Manufacturing overhead H. Overhead Applied I. Product cost J. Under applied overhead ____Used by companies that produce individual products or batches of products that are unique. ____involves minimizing inventory levels ____when actual overhead exceeds applied overhead ____the cost of the jobs completed during the period ____includes the cost...