Question

Exercise-2.60: Orders for a computer are summarized by the optional features that are requested as follows...

Exercise-2.60:

Orders for a computer are summarized by the optional features that are requested as follows

Proportion of Orders

No optional features

0.3

One optional feature

0.5

More than one optional feature

0.2

(a) What is the probability that an order requests at least one optional feature?

(b) What is the probability that an order does not request more than one optional feature?

Homework Answers

Answer #1

From given information we find the following probabilities,

Let X be the number of optional features.

a) We want to find, the probability that an order requests at least one optional feature. That is to find, P(X >=1)

P(X >=1) = P(X = 1) + P(X > 1) = 0.5 +0.2 = 0.7

P(X >=1) = 0.7

b) we want to find, the probability that an order does not request more than one optional feature. That is to find, P(X <= 1)

P(X <= 1) = P(X =0 ) +P(X =1) = 0.3 + 0.5 = 0.8

P(X <= 1) = 0.8

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
The following table lists the history of 1000 orders for features in an entry-level computer product....
The following table lists the history of 1000 orders for features in an entry-level computer product. Extra Memory No Yes Optional high- No 560 80 speed processor Yes 120 240 Let A denote the event that an order requests the optional high-speed processor, and let B denote the event that an order requests extra memory. Determine the following probabilities. Round your answers to 2 decimal places.
Solve the following exercise: A computer is inspected at the end every hour. The computer may...
Solve the following exercise: A computer is inspected at the end every hour. The computer may be either working (up) or failed (down). If the computer is to be found up, the probability of remaining up for the next hour is 0.90. If it is down, the computer is repaired, which may require more than 1 hour. Whenever the computer is down (regardless of how long it has been), the probability of its still being down one hour later is...
Two computer specialists are completing work orders. Incoming jobs are randomly assigned to the first specialist...
Two computer specialists are completing work orders. Incoming jobs are randomly assigned to the first specialist with probability 0.69 and to the second specialist with probability 0.31. The time it takes the first specialist to complete an order is a normal random variable with mean 5.5 hours and standard deviation 1 hour and the time it takes the second specialist is normal with mean 6.3 hours and standard deviation 1.5 hours. Please give your answers to the nearest 0.001. Part...
California Consulting, LLC is a consulting business operated by Mr. Williams and one of his colleagues....
California Consulting, LLC is a consulting business operated by Mr. Williams and one of his colleagues. In a typical year, California Consulting responds to 12 requests for proposals (RFPs) in hopes of obtaining business. Each RFP results in either a ‘success’ (California Consulting is awarded the contract) or a ‘failure’ (California Consulting does not win the business). Assume that the outcomes follow the binomial distribution with the probability of success equal to 0.3. What is the probability of exactly 5...
Exercise 5-49 Algo (Use computer) Suppose 52% of recent college graduates plan on pursuing a graduate...
Exercise 5-49 Algo (Use computer) Suppose 52% of recent college graduates plan on pursuing a graduate degree. Twelve recent college graduates are randomly selected. a. What is the probability that no more than four of the college graduates plan to pursue a graduate degree? (Round your final answer to 4 decimal places.) Probability b. What is the probability that exactly five of the college graduates plan to pursue a graduate degree? (Round your final answer to 4 decimal places.) Probability...
1. Within a computer program, the number of bugs (i.e., coding errors) per lines of code...
1. Within a computer program, the number of bugs (i.e., coding errors) per lines of code has a Poisson distribution with an average of fifteen bugs per 1,000 lines. a. Find the probability that there will be exactly eight bugs in 1,000 lines of code. b. Find the probability that there will be at least eight bugs in 1,000 lines of code. c. Find the probability that there will be at least one bug in 1,000 lines of code. d....
In a typical year, California Consulting responds to 10 requests for proposals (RFPs) in hopes of...
In a typical year, California Consulting responds to 10 requests for proposals (RFPs) in hopes of obtaining business. Each RFP results in either a ‘success’ (California Consulting is awarded the contract) or a ‘failure’ (California Consulting does not win the business). Assume that the outcomes follow the binomial distribution with the probability of success equal to 0.4. What is the probability of exactly 4 successful RFPs? What is the probability of at least 3 but not more than 6 successful...
Exercise 11.2.5 Customers arrive at Bunkey’s car wash service at a rate of one every 20...
Exercise 11.2.5 Customers arrive at Bunkey’s car wash service at a rate of one every 20 minutes and the average time it takes for a car to proceed through their single wash station is 8 minutes. Answer the following questions under the assumption of Poisson arrivals and exponential service. (a) What is the probability that an arriving customer will have to wait? (b) What is the average number of cars waiting to begin their wash? (c) What is the probability...
The amount of cereal that can be poured into a small bowl varies with a mean...
The amount of cereal that can be poured into a small bowl varies with a mean of 1.7 ounces and a standard deviation of 0.3 ounce. A large bowl holds a mean of 2.8 ounces with a standard deviation of 0.4 ounce. A student opens a new box of cereal and pours one large and one small bowl. Assume that the amounts poured into the two bowls are independent. Complete parts​ (a) through​ (f) below. ​a) How much more cereal...
The following chart shows the probability of time it will take to finish a project and...
The following chart shows the probability of time it will take to finish a project and the amount of profit expected if the project is completed in that time. What is the expected value of the profit from this project? Project length profit Probability <30 days 100,000 0.3 30 to 45 days 75,000 0.2 > 45 days 60,000 0.5 78,667 82,750 65,000 75,000 A person making calls to sell insurance has a 0.15 probability of success. If that person makes...