Question

Should the system engineer participate in the contract negotiation process? If so, in what capacity? SYSTEM...

Should the system engineer participate in the contract negotiation process? If so, in what capacity?

SYSTEM ENGINEERING MANAGEMENT FIFTH EDITION
Benjamin S. Blanchard

Homework Answers

Answer #1

System engineer, belonging to a competent decision making level may involve himself in the contract negotiation process during which the Engineer shall mediate the key terms of process control of the Project, management of Project stages, etc. Moreover, scope for additions and alterations under the Contractual terms can be better negotiated if the same is looked upon from the technical aspect, which shall be the key to freezing the designs in the system, or improvisation of the base standards for any given Project. In a way, that shall help in making the Project more competitive in nature. Also such measures add flexibility in execution of contracts on technical grounds. Hence, the system engineer should participate in the contract negotiation process.

This can happen in the capacity of the Panel Members, Board of Officers or as an independent Technical Advisor to the Contract-making Committee of the Organization.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
What is the purpose of a WBS? What is the difference between a WBS, a SWBS,...
What is the purpose of a WBS? What is the difference between a WBS, a SWBS, and a CWBS? How do work packages relate to the WBS? Construct a WBS for a program of your choice. SYSTEM ENGINEERING MANAGEMENT FIFTH EDITION Benjamin S. Blanchard
Which system call should you use to create get the child process’ exit status? What do...
Which system call should you use to create get the child process’ exit status? What do operating systems use to allow multiple processes load from and store to the same address without interfering with each other?
43) In the process of preparing a receiving report, the receiving department should perform all of...
43) In the process of preparing a receiving report, the receiving department should perform all of the following tasks except: (2pts) compare the completed receiving report to the information stored in the purchase order master data inspect and approve quality count the quantity received compare the vendor’s packing slip to a copy of the purchase requisition 44) Which of the following data stores is updated for job specifications? (2pts) termination data skills inventory data labor-force planning data payroll data All...
Company ABC is considering purchasing of New Packaging Machine system to improve its existing packaging process....
Company ABC is considering purchasing of New Packaging Machine system to improve its existing packaging process. In order to analyze the feasibility of this project the company needs the help Investment analysist to evaluate this project. In order to evaluate this proposal the company has shared following information. The project requires an initial investment of Rs.1000000 in equipment and it will be depreciated to zero on Straight line basis over 5 years. This system will generate 80,000 units each year...
By 1997, Como had achieved partial success in implementing project management. Lead times were reduced by...
By 1997, Como had achieved partial success in implementing project management. Lead times were reduced by 10 percent rather than the target of 25 to 35 percent. Internal resources were reduced by only 5 percent. The reduction in prototype time and cost was 15 percent rather than the expected 30 to 35 percent. Como’s automotive customers were not pleased with the slow progress and relatively immature performance of the company’s’ project management system. Change was taking place, but not fast...
By 1997, Como had achieved partial success in implementing project management. Lead times were reduced by...
By 1997, Como had achieved partial success in implementing project management. Lead times were reduced by 10 percent rather than the target of 25 to 35 percent. Internal resources were reduced by only 5 percent. The reduction in prototype time and cost was 15 percent rather than the expected 30 to 35 percent. Como’s automotive customers were not pleased with the slow progress and relatively immature performance of the company’s’ project management system. Change was taking place, but not fast...
As CEO of Ocean World​, Rita Greenwood knows it is important to control costs and to...
As CEO of Ocean World​, Rita Greenwood knows it is important to control costs and to respond quickly to changes in the highly competitive​ boat-building industry. When DMG Consulting proposes that Ocean World invest in an ERP​ system, she forms a team to evaluate the​ proposal: the plant​ engineer, the plant​ foreman, the systems​ specialist, the human resources​ director, the marketing director, and the management accountant. A month​ later, management accountant Marcus Chumura reports that the team and DMG estimate...
tasked with assessing Dax’s capacity and making a recommendation about what should be done going forward....
tasked with assessing Dax’s capacity and making a recommendation about what should be done going forward. Dax is an athletic, 25-year-old Air Force reserve pilot. His dream is to become a commercial airline pilot, and while awaiting further training he has been helping his father who works as a real-estate broker. Just over a week ago, Dax and his father drove to a rural property in order to appraise some land. When Dax and his father were finished assessing the...
Analysis: This section should include the issue register as a bare minimum, but may include also...
Analysis: This section should include the issue register as a bare minimum, but may include also why-why diagrams, a Pareto chart, a waste table and/or value-added analysis table. Flow analysis or simulation of this case study might be possible but might require making a lot of assumptions given the provided data. The first part of the project: Introduction    Walmart has continued to retain the top position on the Fortune 500 list for a consecutive fifth year. The brand has...
The questions: 1. What type of technology Acme and Omega utilize to transform inputs into outputs?...
The questions: 1. What type of technology Acme and Omega utilize to transform inputs into outputs? 2. Which strategic choice (differentiation or cost leadership) suits best to Acme? Omega? Do these companies have clear strategic choices or do they stuck in the middle? 3. Based on all the contingencies which type of structure is more suitable for these companies; mechanistic or organic? please answer each question alone The Paradoxical Twins: Acme and Omega Electronics John F. Veiga Part! boom of...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT