When starting the production process for a product, managers must decide if they are going to...

When starting the production process for a product, managers must decide if they are going to make all the components in house, or outsource some parts to other vendors. This is commonly called a?

Homework Answers

Answer #1

The answer is Make-or-Buy Decision

Make-or-buy decision is an act of deciding whether to manufacture a product in-house or to purchase it from an external supplier.

A make-or - buy decision, also referred to as an outsourcing decision, compared the costs and benefits associated with manufacturing a desired product or service locally with the costs and benefits inherent with recruiting an alternative provider for the services with question. In order to adequately measure prices, a organization must consider all factors related to the purchase and storing of the products versus the production of the products in-house.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Maintenance managers must decide when to change the light bulbs in streetlamps and other relatively inaccessible...
Maintenance managers must decide when to change the light bulbs in streetlamps and other relatively inaccessible installations. It is costly to send out crews to change a single failed bulb. If each bulb lasts approximately the same amount of time, they can all be changed at once, producing significant cost savings. Suppose that a financial analysis of the lights at Coors field has concluded that it will pay to replace all of the light bulbs at the same time if...
Why would Boeing outsource its electronics production and then bring its manufacture back in-house? In the...
Why would Boeing outsource its electronics production and then bring its manufacture back in-house? In the early 2000s, The Boeing Company (NYSE: BA) outsourced key portions of its aircraft manufacturing and design operations, including electronics and central computers. Beginning in 2007, Boeing’s 787 Dreamliner (a new model for Boeing) was assembled in the U.S., with global subcontractors assigned the work of assembling key sections of the 787. Subcontractors also worked on various software systems and electronics components for the 787....
As a supervisor of a production department, you must decide the daily production totals of a...
As a supervisor of a production department, you must decide the daily production totals of a certain product that has two models, the Deluxe and the Special. The profit on the Deluxe model is $12 per unit and the Special's profit is $10. Each model goes through two phases in the production process, and there are only 100 hours available daily at the construction stage and only 80 hours available at the finishing and inspection stage. Each Deluxe model requires...
When evaluating its monthly performance, the managers of Drury Corporation decide to direct their attention only...
When evaluating its monthly performance, the managers of Drury Corporation decide to direct their attention only to those activities that deviated from their budgeted amounts. They are therefore engaging in: Just-in-time management Activity-based management Organization-based management Management by exception Budgetary slack refers to: Overspending the budget allowance The time lag between budget preparation and actual operations. Intentionally manipulating the budget to make it easier to meet its expectations The time lag between budget discussions and actual preparation of budgets Which...
Boston Metal Company (BMC), a small manufacturer of fabricated metal parts, must decide whether to compete...
Boston Metal Company (BMC), a small manufacturer of fabricated metal parts, must decide whether to compete to become the supplier of transmission housings for Gulf Electric. Gulf Electric produces transmission housings in its own in‐house manufacturing facility, but it has almost reached its maximum production capacity. Therefore, Gulf is looking for an outside supplier. To compete, BMC must design a new fixture for the production process and purchase a new forge. The available details for this purchase are as follows:...
Theory of Constraints Production of a product includes four (4) processes. Each process has a capacity....
Theory of Constraints Production of a product includes four (4) processes. Each process has a capacity. The work day is Work day (Hours) long. Which process is the constraint on production? How much can be produced in a working day? Use the data on the spreadsheet to make your calculation. Note: Provide all answers to two decimal places. For example 3 enter as 3.00 and 24 as 24.00 Process 1 Capacity per hour 5.10 Process 2 Capacity per hour 8.05...
How you will select manufacturing process for a project (shoe company that you're starting? Here is...
How you will select manufacturing process for a project (shoe company that you're starting? Here is some useful info from my book: Process selection refers to deciding on the way production of goods or services will be organized. It has major implications for capacity planning, layout of facilities, equipment, and design of work systems. Process selection occurs as a matter of course when new products or services are being planned. However, it also occurs periodically due to technological changes in...
The production department in a process manufacturing system completed 82,000 units of product and transferred them...
The production department in a process manufacturing system completed 82,000 units of product and transferred them to finished goods during a recent period. Of these units, 24,600 were in process at the beginning of the period. The other 57,400 units were started and completed during the period. At period-end, 16,100 units were in process. Prepare the department’s equivalent units of production with respect to direct materials under each of the three separate assumptions using the FIFO method for process costing....
Wilma Company must decide whether to make or buy some of its components. The costs of...
Wilma Company must decide whether to make or buy some of its components. The costs of producing 60,500 switches for its generators are as follows. Direct materials $29,600 Variable overhead $44,400 Direct labor $21,480 Fixed overhead $83,600 Instead of making the switches at an average cost of $2.96 ($179,080 ÷ 60,500), the company has an opportunity to buy the switches at $2.70 per unit. If the company purchases the switches, all the variable costs and one-fourth of the fixed costs...
A manufacturer considers his production process to be out of control when defects exceed 3%. In...
A manufacturer considers his production process to be out of control when defects exceed 3%. In a random sample of 85 items, the defect rate is 5.9% but the manager claims that this is only a sample fluctuation and the production is not really out of control . At the 0.01 level of significance, test the managers claim.   HINTS: 1.57, 0.0582, 2.33 A) Step 1: What is the claim? Be careful, this is a tricky question; but the claim is...