Question

What is the cost of production of “labor power?” What is “necessary labor?”

What is the cost of production of “labor power?” What is “necessary labor?”

Homework Answers

Answer #1

Answer) Cost of production of labour consists of preciously the quantity of means of subsidence necessary for a worker to continue working and to prevent working class from dying out. cost of the labor means the wages that has been given to the labour .It abstract value in motion available for investment in future time and place . Labor power is the labor time necessary for the production of a commodity which gives enough wages for his sustenance.

Necessary labor means the labor employed by the employer in material production to create necessary product.It depends on the development of social production in a given socio economic production. T he division of labor is necessary and surplus labor is preserved.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
(History of Economic Thought) Question. 2) (a) What is the difference between labor and labor power...
(History of Economic Thought) Question. 2) (a) What is the difference between labor and labor power according to Marx? (b) Explain what Marx means by surplus value and how he uses the difference between labor and labor power to explain surplus value and exploitation.
Direct Labor Variances The following data relate to labor cost for production of 4,000 cellular telephones:...
Direct Labor Variances The following data relate to labor cost for production of 4,000 cellular telephones: Actual: 2,710 hrs. at $13.20 Standard: 2,670 hrs. at $13.40 a. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Rate variance $    Time variance $    Total direct labor cost variance $   
Direct Labor Variances The following data relate to labor cost for production of 4,000 cellular telephones:...
Direct Labor Variances The following data relate to labor cost for production of 4,000 cellular telephones: Actual: 2,720 hrs. at $15.6 Standard: 2,680 hrs. at $15.8 a. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Rate variance $    Time variance $    Total direct labor cost variance $    b. The...
Direct Labor Variances The following data relate to labor cost for production of 3,500 cellular telephones:...
Direct Labor Variances The following data relate to labor cost for production of 3,500 cellular telephones: Actual: 2,370 hrs. at $15.40 Standard: 2,330 hrs. at $15.60 a. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Rate variance $    Time variance $    Total direct labor cost variance $    b. The...
Direct Labor Variances The following data relate to labor cost for production of 7,000 cellular telephones:...
Direct Labor Variances The following data relate to labor cost for production of 7,000 cellular telephones: Actual: 4,730 hrs. at $12.7 Standard: 4,660 hrs. at $12.9 a. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Rate variance $ 713,898.9 Favorable Time variance $ 1,226 Unfavorable Total direct labor cost variance $ Favorable...
Direct Labor Variances The following data relate to labor cost for production of 6,000 cellular telephones:...
Direct Labor Variances The following data relate to labor cost for production of 6,000 cellular telephones: Actual: 4,050 hrs. at $16.3 Standard: 3,990 hrs. at $16.6 Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Rate variance $ Time variance $ Total direct labor cost variance $ b. The employees may have been...
Direct Labor Variances The following data relate to labor cost for production of 3,200 cellular telephones:...
Direct Labor Variances The following data relate to labor cost for production of 3,200 cellular telephones: Actual: 2,180 hrs. at $13.9 Standard: 2,150 hrs. at $14.1 a. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Rate variance $ Time variance $ Total direct labor cost variance $ b. The employees may have...
The production P of a certain product depends on the labor L and the quantity of...
The production P of a certain product depends on the labor L and the quantity of capital K according to P (L, K) 8L^1/4 K^3/4 If the total labor and capital must be 800, determine the amounts of L and K necessary to obtain the maximum possible production.
Direct Labor Variances The following data relate to labor cost for production of 5,300 cellular telephones:...
Direct Labor Variances The following data relate to labor cost for production of 5,300 cellular telephones: Actual: 3,570 hrs. at $15.2 Standard: 3,510 hrs. at $15.5 a. Determine the direct labor The cost associated with the difference between the standard rate and the actual rate paid for direct labor used in producing a commodity.rate variance, direct labor The cost associated with the difference between standard and actual hours of direct labor spent for producing a commodity.time variance, and total direct...
(a) Find the power of the lens necessary to correct an eye with a far point...
(a) Find the power of the lens necessary to correct an eye with a far point of 23.7 cm (b) Find the power of the lens necessary to correct an eye with a far point of 45.0 cm.