Give at least 10 design constraints in software system with some explanation.
In software architecture design, constraints come in two basic
flavors - technical and business. On most projects there are only a
handful of constraints, but these constraints are a highly
influential architectural driver. Constraints, as the dictionary
definition above indicates, are a limiting factor and severely
restrict options for making design decisions. They are also fixed
design decisions that cannot be changed and must be satisfied. You
could think of constraints as the ultimate non-negotiable, "must
have" requirement. It is for this reason that architecture design
constraints must be created and accepted with care.
Anthony Lattanze of Carnegie Mellon University, author of the
Architecture Centric Design Methodology and one of the ATAM
creators, likens design constraints in software architecture to
"load bearing walls" employed in traditional building architecture.
Load bearing walls of a building are extremely strategic and
strongly influence the shape and form of the building. What's more,
once these essential walls are placed and bearing weight it becomes
cost prohibitive to move them.
Technical and business constraints are similarly load bearing. Many
design decisions will hang on fixed constraints, further cementing
them into your system's design. Adding a component or even
refactoring architectural styles might be costly but it can still
be done. Deciding to jump from .Net to the JVM requires demolition
and rebuilding.
As architecture design constraints are so important it's worth
taking some time to understand them in greater detail so you can
properly deal with them when they arise.
Technical Constraints in Software Architecture
Technical constraints are fixed technical design decisions that
absolutely cannot be changed. Most often technical constraints are
provided by stakeholders (perhaps after some digging) at the outset
of the project. Sometimes a team may choose to create a constraint,
perhaps to simplify the world in which they are working. Regardless
of the origin, these architecture drivers are technical in nature
and are considered unchangeable and indeed very soon become
so.
There are many common examples of technical constraints that you've
likely seen.
Programming language - often times a specific programming language will be required for various reasons. For example, the customer may be a Java or Ruby or Microsoft shop. You might simply prefer a certain language over another, or have specific expertise that dictates using a particular programming language. Nearly always, once you've picked a language you are stuck with that choice for the remainder of the project,
Operating system or platforms supported - It must work on Windows, or Linux, or iOS, or Qt on Solaris, or IE 6 on Windows XP, or ... building software that does not satisfy the platform constraint means you have failed to design a software system that satisfies stakeholders' key concerns.
Use of a specific library or framework - Sometimes a specific library might be required to be used. The specific origin might come from the business but the influence is very technical. A common example at many companies is the use of specific open source libraries. Some companies might require that open source always be used. Other companies, might have an approved list indicating which open source software may be used. An interesting example at IBM is that we are required to target the "Blue" JVM, IBM's JDK for all JVM-based projects.
Business Constraints
Business constraints are unchangeable business decisions that in some way restrict the software architecture design. Business constraints are similar to technical constraints in that they are decisions that cannot be changed, but rather than influencing structures directly through technology, the influence occurs indirectly through business decisions. It might be easiest to discuss some examples.
Schedule - "We have to be ready to demo at the trade-show in November." The final delivery date is fixed based on input from the business and cannot be changed. It is now up to you to design a system that can be built within the required schedule.
Budget - I've found that this is less true for product development, but nearly every development contractor must learn to deal with budget constraints. In some cases you might be able to increase the budget, but often budgets, whether fixed through contract or expectations, become constraints on the project and team building the software.
Team composition and make-up - In some cases there may be requirements that specific personnel be used or not used during project. For example, someone may be unavailable, already committed to another project or you may be required to include specific individuals, perhaps for training purposes.
Software licensing restrictions or requirements - Often times you will be required to use specific software components because they are already owned. I've also seen situations where components have been used in very... interesting... ways to satisfy specific licensing restrictions. Legal considerations are extremely constraining.
Identifying Constraints
Constraints originate from a variety of sources. In my
experience, more often than not at least one stakeholder has a
specific concern that will result in a constraint. For example, the
business line or some other stakeholder might decide that IE6
running on Windows XP must be supported (and in spite of our
resistance it remains a requirement). If you've ever created a web
application for a federal agency of the US Government then you'd
know that this was a constraint on all web projects until very
recently. United States law requires support of a specific
operating system and browser. Period. That changes when Congress
passes a new law.
Constraints can also be created before a project even starts,
during procurement. In my previous role at IBM as an application
engineer / consultant with expertise in the Watson Explorer
platform (a/k/a Vivisimo Velocity or Data Explorer), every project
on which I worked was constrained to use the Watson Explorer
platform. As a consultant I was only brought in once the decision
had been made to purchase and deploy Watson Explorer. This
constraint is fixed during the pre-sales and sales phase of the
system.
It's common that quality attributes and functional requirements
will be offered up as constraints. It is a huge mistake to treat a
quality attribute as a constraint, even one that is extremely high
priority. Quality attributes are NEVER constraints.
When starting a project I advise teams and teammates to be very
conservative when fixing constraints. Challenge constraints. Do not
accept them lightly. Is this requirement an absolute must-have or
is it just extremely important? Is the decision a strong suggestion
or a threshold of success for the system?
Over time, design decisions you've made can become constraining but
it's important to distinguish between the constraints you are given
and the constraints you've created for yourself. Ultimately, the
constraints you give yourself can change if you need them to while
constraints you are given are non-negotiable. This is why
constraints should be considered a distinct architectural driver
and tracked explicitly from quality attributes, functional
requirements, and specific design decisions.