You are requested by a client to design three (3) proposed channel (i.e. lined, unlined, and composite) to convey a 5-year ARI minor system water flow from a proposed 5-hectare project development at a university in Malaysia. The post-development time of concentration, tc at the development outlets are estimated to be 20 minutes.
Get Answers For Free
Most questions answered within 1 hours.