A building has the following dimensions and characteristics: footprint of 100 ft x 50 ft and...

A building has the following dimensions and characteristics: footprint of 100 ft x 50 ft and 8 stories, 10 feet floor-to-floor height for each floor. The window-wall ratio is .33. Walls have an overall R-value of 20, windows have a U-value of 0.6. The roof has an R value of 30. Building is programmed as all office with 150 square feet per person.

Part a Q, in BTUH, assuming heating design conditions of 74 degree F inside and 10 degree F outside and 15 CFM ventilation air per occupantCalculate the design heating load,

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A 16-storey high building has plan dimensions of 60 x 60 (W=60 ft. and L=60 ft.)....
A 16-storey high building has plan dimensions of 60 x 60 (W=60 ft. and L=60 ft.). The floor height is equal to 12 feet. Under winter design conditions, one side receives a normal wind at a velocity of 15 mph. The neutral axis lies on the 7th floor. Estimate the pressure difference for all the four walls of the 1st and 16th floors considering only the wind and the stack effects. What is the net pressure difference on these floors...
Heating Load Calculation Given a heating-only garage (shown below) with the dimension of 20’ × 20’...
Heating Load Calculation Given a heating-only garage (shown below) with the dimension of 20’ × 20’ × 10’ (L × W × H), and the other building information: · A gate with the dimension of 15’ × 9’ and U-0.5 Btu/(hr.ft2.F) · Wall construction – insulated precast concrete wall panels with 4” LW concrete (R- value of 0.625 (hr.ft2.F)/Btu), 3” rigid insulation in the middle (R-value of 15 (hr.ft2.F)/Btu), and another 4” LW concrete (R-value of 0.625 (hr.ft2.F)/Btu) · Roof...
QUESTION 89 A high-rise building that has water tanks on the roof will probably have a...
QUESTION 89 A high-rise building that has water tanks on the roof will probably have a ________ water distribution system for the upper floors. Upfeed Pumped upfeed Downfeed None of the above 1 points    QUESTION 90 Which of the following ratings evaluates the performance of a building "assembly" in a fire? a. Building Construction Type b. Flame Spread rating c. Fire Resistance Rating d. Location in a building 1 points    QUESTION 91 Which of the following statements is...
Sustainable Project Development Concerns Mainly Energy, Water, and Waste Water Cost Reduction and Project Management Strategies...
Sustainable Project Development Concerns Mainly Energy, Water, and Waste Water Cost Reduction and Project Management Strategies Design Principles and Environmental Stewardship All Options Above Water Treatment Process Consisting of Primarily    UV Application and Purification Coagulation, Filtration, Chlorination, and Purification Disinfection, Microfiltration, UV Application, and Purification All Options Above The Major Sign off Require for the Application of Certificate of Occupancy Electrical, Plumbing, and HVAC Sign Offs Electrical, Plumbing, and General Construction Sign Offs Punch Lists Mitigation All Options Above...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT