- Sustainable Project Development Concerns
Mainly
- Energy, Water, and Waste Water
- Cost Reduction and Project Management Strategies
- Design Principles and Environmental Stewardship
- All Options Above
- Water Treatment Process Consisting of
Primarily
- UV Application and Purification
- Coagulation, Filtration, Chlorination, and Purification
- Disinfection, Microfiltration, UV Application, and
Purification
- All Options Above
- The Major Sign off Require for the Application of
Certificate of Occupancy
- Electrical, Plumbing, and HVAC Sign Offs
- Electrical, Plumbing, and General Construction Sign Offs
- Punch Lists Mitigation
- All Options Above
- Describe your own language briefly about the partial payment
procedure of a construction project?
- At your own language outlined the material quality controls for
the construction of a complex infrastructure project.
- Determine the constructability of a two-story CMU wall of wind
load 30 ibf/ft2 with allowable stress 40 ibf/in2. The
wall is 10 feet height of each floor and the section modulus is 160
in3/ft?
- An office has a floor area of 2000 ft2 and maximum
occupants are 40. Cool air is supplied from ceiling diffusers. If
the efficiency is 1, determine how much air ventilation requires as
per ASHRAE
- Determine the additional scope of work for a change order of
concrete work of 210x150 size one story building of an ongoing mega
project. Assume SOF is 14” and building height is 12’?
A project was baselined at $20,000 per week for fifteen weeks to
complete. But already has taken 20 weeks. Two additional weeks is
estimated to complete the project. Determine the earned value of
work performed of this project.