Question

Sketch (Plan View and Section Cut) and quantify the following items. Quantify the following Earth work:...

Sketch (Plan View and Section Cut) and quantify the following items. Quantify the following Earth work: Assumptions: Site is level and prepared with stable soil 1. Fine grade for slab (Area Condition in SF- of Slab 24’ x 36’) 2. Excavation and Backfill for all foundation trenches (End area method Cross Section of Trench 2’ x1’ x the Perimeter of the slab in cubic yards). Concrete: Assumptions: 3,000 psi concrete: Rebar sticks are 40’ and lap is 38 bar diameters (a rebar diameter is measured by 1/8 of an inch i.e. a number 4 rebar is 4/8th of an inch or ½” in diameter.) . WWM is in 50’ x 4’ rolls with 6” of lap on all sides. (Rebar and Reinforcing are extra credit) 1. 24’ x 36’ x 4” slab on grade with one layer of 6x6~W2.1xW2.1 WWM (Trowel Finish) ( Cubic yards) 2. 2’ x 1’ Continuous spread footers under slab turn down including 2 # 4 rebar (cubic yards) 3. Sub-base 6” of gravel with 10 mil vapor barrier (both area Conditions ) Masonry: Assumptions: 14’ CMU Masonry has bond beams every 48” and vertical reinforcing 24” O.C. Consisting of grout and # 4 rebar. Unreinforced spaces will remain hollow! Reinforcing Extra Credit 1. 8” x 16” x 8” CMU around perimeter of building (assume no openings for now) Area Condition SF) 2. Brick Veneer on the outside of CMU (Area Condition SF)

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT