Question

For years, Tamarindo Company produced only one product: backpacks. Recently, Tamarindo added a line of duffel...

For years, Tamarindo Company produced only one product: backpacks. Recently, Tamarindo added a line of duffel bags. With this addition, the company began assigning overhead costs by using departmental rates. (Prior to this, the company used a predetermined plantwide rate based on units produced.) Surprisingly, after the addition of the duffel-bag line and the switch to departmental rates, the costs to produce the backpacks increased, and their profitability dropped. Josie, the marketing manager, and Steve, the production manager, both complained about the increase in the production cost of backpacks. Josie was concerned because the increase in unit costs led to pressure to increase the unit price of backpacks. She was resisting this pressure because she was certain that the increase would harm the company's market share. Steve was receiving pressure to cut costs also, yet he was convinced that nothing different was being done in the way the backpacks were produced. After some discussion, the two managers decided that the problem had to be connected to the addition of the duffel-bag line. Upon investigation, they were informed that the only real change in product costing procedures was in the way overhead costs are assigned. A two-stage procedure was now in use. First, overhead costs are assigned to the two producing departments, Patterns and Finishing. Second, the costs accumulated in the producing departments are assigned to the two products by using direct labor hours as a driver (the rate in each department is based on direct labor hours). The managers were assured that great care was taken to associate overhead costs with individual products. So that they could construct their own example of overhead cost assignment, the controller provided them with the information necessary to show how accounting costs are assigned to products:

Patterns Dept. Finishing Dept. Total
Accounting cost $30,000 $90,000 $120,000
Transactions processed 20,000 60,000 80,000
Total direct labor hours 15,000 30,000 45,000
Direct labor hours per backpack* 0.10 0.20 0.30
Direct labor hours per duffel bag* 0.20 0.40 0.60

* Hours required to produce one unit of each product.

The controller remarked that the cost of operating the accounting department had doubled with the addition of the new product line. The increase came because of the need to process additional transactions, which had also doubled in number.

During the first year of producing duffel bags, the company produced and sold 100,000 backpacks and 25,000 duffel bags. The 100,000 backpacks matched the prior year’s output for that product.

Compute the amount of accounting cost assigned to a backpack before the duffel-bag line was added by using a plant-wide rate approach based on units produced. Is this assignment accurate? Explain.

Homework Answers

Answer #1

Solution :- During the first year of producing duffel bags, the company produced and sold 1,00,000 backpacks and 25,000 duffel bags. Backpacks of 1,00,000 were matched the prior year's output for that product.

For both (1) & (2) answers...

- company decided to assign the accounting costs directly to the product lines by using the number of transactions.

Solution - 1 :- using number of transactions:

Overhead applied :-

Number of transaction has doubled

Solution - 2 :- By measuring the using departmental rates based on labour hours.

patterns = $ 2 per departmental labour hours.

finishing = $ 3 per departmental labour hours.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
True Colour Inc. manufactures waterproof laptop backpacks. The standard cost card of a single backpack is...
True Colour Inc. manufactures waterproof laptop backpacks. The standard cost card of a single backpack is given below:    Standard Quantity or Hours Standard Price or Rate Standard Cost Direct materials ? $ 4.00 per yard $ ? Direct labor ? ? ? Variable manufacturing overhead ? $ 2 per direct labor-hour ? Total standard cost per unit $ ? Overhead is applied to production on the basis of direct labor-hours. During March, 700 backpacks were manufactured and sold. Selected...
Cotopaxi makes backpacks. Traditionally, they bought fabric in quantity, and cut out the forms for their...
Cotopaxi makes backpacks. Traditionally, they bought fabric in quantity, and cut out the forms for their backpacks from large pieces, discarding the interstitial material as scrap. Due to the integrated nature of the production facility, the cost of all this fabric was considered a joint cost, allocated by the approximate relative sales value method, and the scraps were considered a waste by-product. Recently however, an enterprising employee had the great idea to use these scraps and make small, unique bags...
The following information is available pertaining to the Production Division of Clarkson Enterprises: Assembly Dept. Finishing...
The following information is available pertaining to the Production Division of Clarkson Enterprises: Assembly Dept. Finishing Dept. Total Overhead costs $10,000 $30,000 $40,000 Direct labor hours 8,000 2,000 10,000 Machine hours 3,000 5,000 8,000 Production information pertaining to Job 4X5: Assembly Dept. Finishing Dept. Total Prime costs $2,380 $-0- $2,380 Direct labor hours 280 -0- 280 Machine hours -0- -0- -0- Units produced 500 -0- 500 1. Refer to Figure 5-7. What is the plant wide overhead rate based on...
Product-Costing Accuracy, Plantwide and Departmental Rates, ABC Escuha Company produces two type of calculators: scientific and...
Product-Costing Accuracy, Plantwide and Departmental Rates, ABC Escuha Company produces two type of calculators: scientific and business. Both products pass through two producing departments. The business calculator is by far the most popular. The following data have been gathered for these two products: Product-Related Data Scientific Business Units produced per year 76,000 760,000 Prime costs $246,000 $2,460,000 Direct labor hours 98,000 980,000 Machine hours 49,400 494,000 Production runs 100 150 Inspection hours 2,000 3,000 Maintenance hours 2,250 9,000 Department Data...
The following information is available pertaining to the Production Division of Clarkson Enterprises: Assembly Dept.      ...
The following information is available pertaining to the Production Division of Clarkson Enterprises: Assembly Dept.       Finishing Dept.        Total Overhead costs                 $10,000        $30,000               $40,000 Direct labor hours 8,000           2,000                    10,000 Machine hours                 3,000           5,000                      8,000 Production information pertaining to Job 4X5: Assembly Dept.       Finishing Dept.        Total Prime costs           $2,380                    $-0-                        $2,380 Direct labor hours    280                         -0-                          280 Machine...
Highland Company produces a lightweight backpack that is popular with college students. Standard variable costs relating...
Highland Company produces a lightweight backpack that is popular with college students. Standard variable costs relating to a single backpack are given below: Standard Quantity or Hours Standard Price or Rate Standard Cost Direct materials ? $ 6.00 per yard $ ? Direct labor ? ? ? Variable manufacturing overhead ? $ 2 per direct labor-hour ? Total standard cost per unit $ ? Overhead is applied to production on the basis of direct labor-hours. During March, 760 backpacks were...
1. A company uses activity-based costing to determine the costs of its three products: A, B,...
1. A company uses activity-based costing to determine the costs of its three products: A, B, and C. The budgeted cost and activity for each of the company's three activity cost pools are shown in the following table: Budgeted Activity Activity Cost Pool Budgeted Cost Product A Product B Product C Activity 1 $ 89,000 7,900 10,900 21,900 Activity 2 $ 64,000 8,900 16,900 9,900 Activity 3 $ 120,000 4,400 2,900 3,525 How much overhead will be assigned to Product...
Highland Company produces a lightweight backpack that is popular with college students. Standard variable costs relating...
Highland Company produces a lightweight backpack that is popular with college students. Standard variable costs relating to a single backpack are given below: Standard Quantity or Hours Standard Price or Rate Standard Cost Direct materials ? $ 6.00 per yard $ ? Direct labor ? ? ? Variable manufacturing overhead ? $ 2 per direct labor-hour ? Total standard cost per unit $ ? Overhead is applied to production on the basis of direct labor-hours. During March, 400 backpacks were...
Highland Company produces a lightweight backpack that is popular with college students. Standard variable costs relating...
Highland Company produces a lightweight backpack that is popular with college students. Standard variable costs relating to a single backpack are given below: Standard Quantity or Hours Standard Price or Rate Standard Cost Direct materials ? $ 6 per yard $ ? Direct labor ? ? ? Variable manufacturing overhead ? $ 3 per direct labor-hour ? Total standard cost per unit $ ? Overhead is applied to production on the basis of direct labor-hours. During March, 1,000 backpacks were...
Sequential Method Eilers Company has two producing departments and two support departments. The following budgeted data...
Sequential Method Eilers Company has two producing departments and two support departments. The following budgeted data pertain to these four departments: Support Departments Producing Departments General Factory Receiving Assembly Finishing Direct overhead $500,000 $170,000 $42,000 $75,000 Square footage — 2,700 5,400 5,400 Number of receiving orders 300 — 1,680 1,020 Direct labor hours — — 25,000 40,000 The support departments are ranked in order of highest cost to lowest cost. Required: 1. Allocate the costs of the support departments using...