1. When do you use a p chart instead of an np chart?
2. When do you use a moving average chart instead of an individual’s chart?
3. What does an Acceptable Quality Level of 5% mean?
4. When should you change your control limits (name one thing only)?
5. When you change your process, you may have introduced new sort of _____________
6. Taguchi says that any deviation from target is ________________
7. What do you assume when using a c chart (name one thing only)?
8. How do Attribute data differ from Variable data?
9. Can you ever keep X double bar exactly on target?
10. What type of chart should you use with proportions?
(1)
For discrete property information, utilize the p diagram. Review that discrete property information results when you order or can each case you are estimating. For instance, you may track faulty and non-imperfect parts in an assembling procedure. This graph plots the extent ("p") of the information falling into the applicable class after some time.
At the point when every datum point depends on a similar example measure, a unique variant of the p outline can be utilized. The np graph pursues indistinguishable rule from the p diagram, in any case, plots the number of examples in a classification after some time as opposed to the extent in the class. The name "np" gets from the tradition of utilizing "n" to allude to test estimate. By increasing example measure by extent (n x p) you get the real number in a class.
ANSWERED
PLEASE RATE ME POSITIVE THANKS
Get Answers For Free
Most questions answered within 1 hours.