Fitzgerald Marine Reserve is a great place to go tidepooling, if
you go near low tide....
Fitzgerald Marine Reserve is a great place to go tidepooling, if
you go near low tide. At 12:00am on September 4, 2018 (midnight,
right after September 3 ended, with September 4 just beginning),
there was a high tide of 3.5ft. The first low tide after that point
was at 7am on September 4, 2018, with a depth of 0.5ft.
Assuming the tides in Half Moon Bay follow a simple sinusoidal
model, write a formula for H(t), the water’s height t...
Write a C++ program that converts time of day from a 24-hour
notation to a 12-hour...
Write a C++ program that converts time of day from a 24-hour
notation to a 12-hour notation. For example, it should convert
14:25 to 2:25 PM.
(A) The user provides input as two integers separated by ‘:’.
The following function prototype should capture the user inputs as
described below:
void input(int& hours24, int& minutes);
//Precondition: input(hours, minutes) is called with
//arguments capable of being assigned values.
//Postcondition:
// user is prompted for time in 24 hour format:
// HH:MM, where...
The program shown below reads in (N) values of time
(hours, minutes, and seconds). If the...
The program shown below reads in (N) values of time
(hours, minutes, and seconds). If the values for
hours, minutes and seconds are a legal military
time (i.e. 00 00 00 to 23 59 59) the program should display the
formatted results (i.e. 12 34 56 should be displayed as
12:34:56).
If there's an error for any of the entered values, an exception
should be thrown and an error message should be displayed. Note,
there are three exception conditions, one...
The following are 30 time lapses in minutes between eruptions
of Old Faithful geyser in Yellowstone...
The following are 30 time lapses in minutes between eruptions
of Old Faithful geyser in Yellowstone National Park, recorded
between the hours of 8 a.m. and 10 p.m. on a certain day, and
measured from the beginning of one eruption to the beginning of the
next:
68, 63, 66, 63, 61, 44, 60, 62, 71,
62, 62, 55, 62, 67, 73, 72, 55, 67, 68, 65,
60, 61, 71, 60, 68, 67, 72, 69, 65,
66
A researcher wants to...
In the following situation, should one machine be purchased and
operated 24 hours a day, or...
In the following situation, should one machine be purchased and
operated 24 hours a day, or should three machines be
bought and operated 8 hours?
The machine cost $ 120000 with an economic life of 10
years.
The 24 operation is really only 95% efficiency because of
maintenance and repair activities.
Labor is paid in full no matter how many hours they work in
each shift.
First shift operators get $ 12, second shift operators get $
14, and third...
Q2. In the following situation, should one machine be purchased
and operated 24 hours a day,...
Q2. In the following situation, should one machine be purchased
and operated 24 hours a day, or should three machines
be bought and operated 8 hours?
The machine cost $ 120000 with an economic life of 10
years.
The 24 operation is really only 95% efficiency because of
maintenance and repair activities.
Labor is paid in full no matter how many hours they work in
each shift.
First shift operators get $ 12, second shift operators get $
14, and...
Linear Programming Formulation Project
IE-311 Operation Research I
Western Bank of Commerce and Industry (WBCI) is...
Linear Programming Formulation Project
IE-311 Operation Research I
Western Bank of Commerce and Industry (WBCI) is a busy bank that
has requirements for between 10 and 18 tellers, depending on the
time of the day. The afternoon time, from noon to 2 P.M., is
usually heaviest. The table below indicates the workers needed at
various hours that the bank is open:
Time Period
Number Required
9 A.M - 10 A.M
10
10 A.M. – 11 A.M.
12
11 A.M. –...
(Estimated time allowance: 12 minutes) Call-Si
Corp. currently has two products, high priced cell phones and...
(Estimated time allowance: 12 minutes) Call-Si
Corp. currently has two products, high priced cell phones and apps
for its cell phones. Call-Si Corp. has decided to sell a new line
of low-priced cell phones. Sales revenues for the new line of cell
phones are estimated at $2,000 a year and variable costs are $1,500
a year. The project is expected to last 10 years. Also,
non-variable costs are $500 per year. The company has spent $200 in
a research and...