Question

Develop a transportation problem with (4) origin notes and (5) destination notes. List all variables in...

Develop a transportation problem with (4) origin notes and (5) destination notes. List all variables in the same manner as found in the text, along with the goal and constraints.

Homework Answers

Answer #1

AllTrans Inc is a Delaware based company who specializes in transporting toys for its client Happy Faces Inc, situated in Connecticut. The firm is given a contract to transport the toys consignments from 4 of its strategic source locations to 5 of its destinations. The source locations are Virginia (VA), Delaware (DE), Massachusetts (MA) and New York (NY). The destination states are California (CA), Orlando (OR), Idaho (ID), Washington (WA) and Nevada (NV). There are two intermediate locations in between the routes where the products have to be shipped first and then they get sourced to their respective locations - Texas (TX) and Nebraska (NE). The source locations have their respective supply capacity as shown in the diagram. The destination locations have their demand capacity as shown in the figure-1 below. Also, the handling capacity of the intermediate stations is 100 units. Assuming every location from source to intermediate has a distance of 1250 air miles. Similarly, assume that every location from intermediate to the destination has a distance of 1250 air miles. The cost to ship a box of 10 toys is $1 per air miles.

Solve this transportation problem with a view to minimizing the Cost of transportation.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
1. The transportation problem done in class is to find how many generators should be shipped...
1. The transportation problem done in class is to find how many generators should be shipped from each manufacturing facility to each distribution center so that shipping cost is minimized. To remind you, the LP is Min Transportation costs: 3x11 + 2 x12 + 7 x13 + 6 x14 + 7x21 + 5 x22 + 2 x23 + 3 x24 + 2x31 + 5 x32 + 4 x33 + 5 x34 s.t. Need to make sure demand at destination is...
We are given the following CSP problem. The variables and domains are as follows. A: {4,...
We are given the following CSP problem. The variables and domains are as follows. A: {4, 5, 6, 7, 8} B: {10, 20, 30, 40} C: {2, 3, 4} D: {28, 43, 56, 77, 94, 114} The constraints are: A + C is odd. A + D is a square of an integer. B + D < 60. Solve this problem using the following heuristics and algorithms. • Use backtracking search. • For variable ordering, use MRV. If there are...
LP Graphical Method Problems 1) MAXIMIZATION PROBLEM - 4 PTS Objective Function: Maximize Profit: 5X +...
LP Graphical Method Problems 1) MAXIMIZATION PROBLEM - 4 PTS Objective Function: Maximize Profit: 5X + 3Y Subject to the constraints: 5 X + 2 Y ≤ 40 3 X + 6 Y ≤ 48 X ≤ 7 2 X − Y ≥ 3 X , Y ≥ 0 ******* 2) MINIMIZATION PROBLEM - 4 PTS Objective function: Minimize Cost: 3X + 7Y Subject to the constraints: 9 X + 3 Y ≥ 36 4 X + 5 Y ≥...
The problem statement, all variables and given/known data Group#1: Buffer pH = 4.00 Group#2: Buffer pH...
The problem statement, all variables and given/known data Group#1: Buffer pH = 4.00 Group#2: Buffer pH = 4.35 Group#3: Buffer pH = 4.70 Group#4: Buffer pH = 5.00 Group#5: Buffer pH = 5.30 Group#6: Buffer pH = 5.60 1. Explain which group should havethe BEST OPTIMAL BUFFER (see choices above). 2. Explain which group has a buffer that has the HIGHEST BUFFERING CAPACITY AGAINST NaOH. 3. Explain which group has a buffer that has the HIGHEST BUFFERING CAPACITY AGAINST HCl....
Must be written in c++: This problem solely involves your demonstration of the proper usage of...
Must be written in c++: This problem solely involves your demonstration of the proper usage of C++ STL std::list<int> Below you will be given four total functions to develop (two are listed here, two separately after) Put all four of your functions in the same single source code file Submit ONLY your one source code CPP file online Submitting two or three or more separate CPP files will lose points (1) The first function you will need to implement is...
8. List all irreducible polynomials with binary coefficients of degree 4 or less. (Hint: produce a...
8. List all irreducible polynomials with binary coefficients of degree 4 or less. (Hint: produce a times table that shows the minimum number of products needed.) Show these as binary numbers (omitting the indeterminant) and as decimal numbers (interpreting the binary number into decimal). Is 23 a prime polynomial in this field? 9. Interpreting these decimal numbers into coefficients of polynomials with binary coefficients, what is the product of 11 and 10 modulo 31 in GF(2^4) over P = 31?...
INCLUDE ALL 5 STEPS FOR EACH HYPOTHESIS TEST. FOR EACH PROBLEM, LABEL EACH STEP CLEARLY AS...
INCLUDE ALL 5 STEPS FOR EACH HYPOTHESIS TEST. FOR EACH PROBLEM, LABEL EACH STEP CLEARLY AS 1-5. 1. NULL AND ALTERNATIVE HYPOTHESES 2. CRITICAL VALUE 3. TEST VALUE 4. DECISION 5. CONCLUSION 1. A stockbroker thought that the average number of shares of stocks traded daily in the stock market was about 500 million. To test the claim, a researcher selected a random sample of 40 days and found the mean number of shares traded each day was 508 million...
In Java or  C++ Develop a simulation program to simulate an 8-port Ethernet switch. The switch initially...
In Java or  C++ Develop a simulation program to simulate an 8-port Ethernet switch. The switch initially has no knowledge about the hosts connected to each port. It learns frame addresses and stores-and-forwards the frames. The input text file "in.txt" contains information of the incoming frames, one frame per line. There are 4 pieces of data per line: frame ID, arrival port, frame source address, and frame destination address. The frames arrive at the switch in the order of which they...
Directions: Develop an E-R (or EER depending upon need) Diagram. List all assumptions. Show the version...
Directions: Develop an E-R (or EER depending upon need) Diagram. List all assumptions. Show the version 1 (entities and data only) and version 3 (entities, attributes and relationships with cardinalities and participation constraints). 20 points of the grade will be based on evaluating your assumptions - you must give a detailed list of your assumptions identifying anchor concepts, data associated with the anchor and data that has more than one anchor participating in it. Remember, we are not talking out...
Notes: Requested info from Excel file must be copied/pasted (as picture) to Word File. Neatness matters,...
Notes: Requested info from Excel file must be copied/pasted (as picture) to Word File. Neatness matters, the sloppy presentation will be penalized even if your answers are correct.             Snow White and the Seven Dwarfs Snow White Corporation makes is well known for making children’s toy products. Presently the firm is planning to develop an optimal production schedule to manufacture seven of their popular products - Grumpy, Dopey, Doc, Happy, Bashful, Sneezy, and Sleepy. Relevant product information is provided below....