Question

Describe standard costs. Explain the benefits of using a standard cost system at a well-known company....

Describe standard costs. Explain the benefits of using a standard cost system at a well-known company. Do not post on a company that one of your classmates has already discussed.

Homework Answers

Answer #1

Standard cost is one of the important concept in cost accouting. It is the estimated cost of a product and serves to compare between the actual cost. It is the cost which would get incurred at the given condition. It is predetermined in natue and acts as a control costs by comparing with the actual one. The benefits of using it can be several. For example, ABC Ltd's standard cost helps in determining the budget. It helps in planning and forecasting the amount needed in to manufacture a product. It acts as a control tool as it can be compared with actual cost. It heps in motivating the employees and performance can measured on the basis of this cost.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Please new response and not one that is already posted. What are the major differences between...
Please new response and not one that is already posted. What are the major differences between job-order costing and process-costing systems? Give an example of a well-known company that might use job-order costing, and an example of a well-known company that might use process costing. Explain why you have chosen these companies, and do not choose companies that your classmates have already addressed in a post.
Explain the cost-benefit approach to understanding territoriality. Be sure to list some benefits as well as...
Explain the cost-benefit approach to understanding territoriality. Be sure to list some benefits as well as some costs, and explain proximate and ultimate aspects.
What is One Advantage of Standard Costs and One Potential Problem with using Standard Costs? Do...
What is One Advantage of Standard Costs and One Potential Problem with using Standard Costs? Do you feel the benefits outweigh the problems with using Standard Costs as a Manager?
One can calculate the 95% confidence interval for the mean with the population standard deviation known....
One can calculate the 95% confidence interval for the mean with the population standard deviation known. This will give us an upper and a lower confidence limit. What happens if we decide to calculate the 99% confidence interval? Describe how the increase in the confidence level has changed the width of the confidence interval. Do the same for the confidence interval set at 80%. Include an example with actual numerical values for the intervals in your post to help with...
One can calculate the 95% confidence interval for the mean with the population standard deviation known....
One can calculate the 95% confidence interval for the mean with the population standard deviation known. This will give us an upper and a lower confidence limit. What happens if we decide to calculate the 99% confidence interval? Describe how the increase in the confidence level has changed the width of the confidence interval. Do the same for the confidence interval set at 80%. Include an example with actual numerical values for the intervals in your post to help with...
One can calculate the 95% confidence interval for the mean with the population standard deviation known....
One can calculate the 95% confidence interval for the mean with the population standard deviation known. This will give us an upper and a lower confidence limit. What happens if we decide to calculate the 99% confidence interval? Describe how the increase in the confidence level has changed the width of the confidence interval. Do the same for the confidence interval set at 80%. Include an example with actual numerical values for the intervals in your post to help with...
how are overhead costs accounted for and computed using the traditional and ABC method? what is...
how are overhead costs accounted for and computed using the traditional and ABC method? what is the difference between a Job Order Costs System used in a manufacturing process versus a company that uses a Job Order Costs System for services? what are the 3 different types of activity levels? Describe each one. what is the name of the report used to accumulate costs for a Job Order Costs System? how do you prepare a job order cost report? what...
Standard Product Cost Atlas Furniture Company manufactures designer home furniture. Atlas uses a standard cost system....
Standard Product Cost Atlas Furniture Company manufactures designer home furniture. Atlas uses a standard cost system. The direct labor, direct materials, and factory overhead standards for an unfinished dining room table are as follows: Direct labor: standard rate $24.00 per hr. standard time per unit 4 hrs. Direct materials (oak): standard price $12.00 per bd. ft. standard quantity 17 bd. ft. Variable factory overhead: standard rate $2.40 per direct labor hr. Fixed factory overhead: standard rate $1.20 per direct labor...
Standard Product Cost Hickory Furniture Company manufactures unfinished oak furniture. Hickory uses a standard cost system....
Standard Product Cost Hickory Furniture Company manufactures unfinished oak furniture. Hickory uses a standard cost system. The direct labor, direct materials, and factory overhead standards for an unfinished dining room table are as follows: Direct labor: standard rate $19 per hr. standard time per unit 2.5 hrs. Direct materials (oak): standard price $9.5 per bd. ft. standard quantity 19 bd. ft. Variable factory overhead: standard rate $2.8 per direct labor hr. Fixed factory overhead: standard rate $1.2 per direct labor...
Standard Product Cost Atlas Furniture Company manufactures designer home furniture. Atlas uses a standard cost system....
Standard Product Cost Atlas Furniture Company manufactures designer home furniture. Atlas uses a standard cost system. The direct labor, direct materials, and factory overhead standards for an unfinished dining room table are as follows: Direct labor: standard rate $21.00 per hr. standard time per unit 3 hrs. Direct materials (oak): standard price $12.00 per bd. ft. standard quantity 18 bd. ft. Variable factory overhead: standard rate $2.80 per direct labor hr. Fixed factory overhead: standard rate $0.80 per direct labor...