A site assessment is performed to determine the following:
Solution:
First question:
Answer: All of the Above
Site Assessment is done to have a detailed overview of the site where construction is to be done. It is done to know the best location for the infrastructure to be built and of what size. Site Assessment is also carried out to improve the existing infrastructure with some modifications.
Second question:
Answer: c. The future volume of traffic per lane per hour.
Design capacity is the maximum number of vehicles that passes a particular point in a lane in one hour.