Construction on the site was initiated in February 2016. The Dias project gained approval from all five agencies in April 2016. However, unforeseen circumstances necessitated further changes to the engineering design. Despite this setback, the developer decided to move forward with the construction, accepting the risk of agency comments regarding the new engineering design. The constructed homes feature multi-car garages or detached garages with an upstairs studio. Homes are be two-story and have a minimum of four bedrooms and 3.5 baths. Because homes are located on a hillside, extensive grading studies for retaining walls are required. Lots have customized landscaping per Robson’s request and feature multiple trees along the new right of way and in each lot.
For this specific project, perform the following exercise:
a)four project risks are
b)ranking as per least likelihood to occur is unforseen circumstances
most likely occur retaining of walls
unforseem circumstances<agency comments<economic downturn<retaining of walls
c)risk is
unforseen circumstances= insignificant
agency comments =moderate
economic downturn=minor
retaining of walls=major
d)to mitigate the risk grading study is must
checking out of consequences and result if previous project, taking reviews from other companies
and also with proper plantation and scaling of land project can be successful