Title : Need of maintenance of railways and consequences of failure of maintenance of railways.

The need for maintenance arises due to following reasons:

1) Due to weathering effect the wear and tear of railways and track components are likely to take place.

2) The new track may disturbed due to heavy axle load, frequency in trains.So it is to be checked frequently and periodically for its alignment gauage and surface levels of rail.

3) At points and crossing on curves there might be chances of deterioration due to high speed and heavy wheel loads.

4) Due to moving loads there may be loss of ballast, wear and tear of different parts of tracks.

For above necessity maintenance cycles are divided into following categories-

A) Routine maintenance- It may be carried out daily or periodically.

B) Daily maintenance- It may include daily inspection of tracks, track fitting- tightening of loose fish bolts, loose keys; cotters, etc, picking up slack, oiling of slide chair at points and crossing, cleaning of flange way.

It is generally carried out with the help of gang. For this purpose railway is divided into suitable section of length generally 5-6 km long and each gang is deputed for this sections.

C) Periodic maintenance- It may be carried out by departmental labours after an interval of 2-3 years. It may include maintenance of alignment of tracks, maintenance of components of tracks, maintenance of rails,gauges, drainage,points and crossing and approaches.

D) Special maintenance- It is carried out whenever necessity arises. Especially in case of derailment or accident of trains, when some components are to be replaced due to wear and tear such as sleepers, rails, fixture and fastening, etc.

Rail failure may be due to-

1) Horizontal cracks which occurs at rail end.

2) Square crack- when rail breaks through vertical plane.

3)Split head- It is crack on top having smooth appearance and dark in colour.

4)Split web- It's horizontal crack between bolt holes in web.

5) Horizontal fissures- it occurs due to defective rail heads

6) Transverse fissure- crack which starts from centre of head spread around the head.

7) Crushed head- in this failure the rail head gets sagged and flattened by skidding, slipping of wheels, weak end support and defect of manufacture.

Remedial measures in order to keep on maintenance work continue railway department should organise safety camps for staff in which proper guidance regarding their duties should be explained.

Psychological and physical test should be carried out among workers/staff.

The staff taking keen interest and performing extraordinary work in case of accident should be rewarded in form of cash prizes, certificates, medals.

Conclusion- In above answer the need of maintenance of railways, maintenance cycles, it's consequences of failure and remedial measures are explained.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
produce a 300 word report, complete with drawings as required to explain how the following are...
produce a 300 word report, complete with drawings as required to explain how the following are measured and carried out: • static load gauge • kinetic envelope • swept envelope • structure gauge • platform gauge • OLE heights and stagger gauge
produce a report detailing the planning process for an OLE construction activity using a recent work...
produce a report detailing the planning process for an OLE construction activity using a recent work as the basis for the report. the report should detail the following; • strategic planning process for engineering possessions • planning of engineers trains and on track plant •ordering and supply of materials •manpower requirements •road rail machines requirements •possession arrangements •on track plant detailed plans •interface with other engineering functions •isolation of traction supply •bill of quantities for activity •manufacturer, order and delivery...
Assessment 1.0: OLE Planning Process Produce a report detailing the planning process for an OLE construction...
Assessment 1.0: OLE Planning Process Produce a report detailing the planning process for an OLE construction activity (min 600 words), using a recent work as the basis for the report. The report should detail the following: • Strategic planning process for engineering possessions • Planning of engineer’s trains and on track plant • Ordering and supply of materials • Manpower requirements • Road rail machines requirements • Possession arrangements • On track plant detailed plans • Interface with other engineering...
Please read the following abstract and write a 3 sentence report that describes the major significance...
Please read the following abstract and write a 3 sentence report that describes the major significance of the study presented.   Plastics continue to benefit society in innumerable ways, even though recent public focus on plastics has centered mostly on human health and environmental concerns, including endocrine-disrupting properties and long-term pollution. The benefits of plastics are particularly apparent in medicine and public health. Plastics are versatile, cost-effective, require less energy to produce than alternative materials – such as metal or glass...
Stellar Bright Solar (SBS or the “Company”) is a business that contracts to develop, construct, and...
Stellar Bright Solar (SBS or the “Company”) is a business that contracts to develop, construct, and operate solar power plants. SBS entered into a contract to support the Big Desert solar power plant. According to the contract terms, SBS is responsible for the day-to-day operations of Big Desert as well as for general maintenance and repairs. Big Desert expects SBS to provide routine maintenance for continued operation of the plant and respond to equipment breakdowns and failures by providing immediate...
Which of the following best describes a project management plan? The project charter, WBS, and project...
Which of the following best describes a project management plan? The project charter, WBS, and project scope statement The schedule, management plans, and budget A formal, approved document used to control the project The project manager's plan for managing and controlling the work The engineering department wants the project objective to be a 10 percent improvement in throughput. The information technology department wants no more than 5 percent of its resources to be used on the project. Management, who is...
1. The failure of the new supply chain system affected Nike adversely. What were the reasons...
1. The failure of the new supply chain system affected Nike adversely. What were the reasons for the failure and how did the breakdown harm Nike? 2. What are the important elements to be kept in mind while implementing a new system in an organization? What is the importance of a good working relationship between partners and the sharing of responsibility in implementing critical projects? What mistakes did Nike and i2 make? 3. comment on the lessons learned and the...
Gender Bias in the Executive Suite Worldwide The Grant Thornton International Business Report (IBR) has described...
Gender Bias in the Executive Suite Worldwide The Grant Thornton International Business Report (IBR) has described itself as "a quarterly survey of business leaders from across the globe … surveying 11,500 businesses in 40 economies across the globe on an annual basis." 1 According to the 2011 IBR, the Asia Pacific region had a higher percentage (27 percent) of female chief executive officers (CEOs) than Europe and North America. Japan is the only Asia Pacific region exception. The report further...
What tools could AA leaders have used to increase their awareness of internal and external issues?...
What tools could AA leaders have used to increase their awareness of internal and external issues? ???ALASKA AIRLINES: NAVIGATING CHANGE In the autumn of 2007, Alaska Airlines executives adjourned at the end of a long and stressful day in the midst of a multi-day strategic planning session. Most headed outside to relax, unwind and enjoy a bonfire on the shore of Semiahmoo Spit, outside the meeting venue in Blaine, a seaport town in northwest Washington state. Meanwhile, several members of...
The Business Case for Agility “The battle is not always to the strongest, nor the race...
The Business Case for Agility “The battle is not always to the strongest, nor the race to the swiftest, but that’s the way to bet ’em!”  —C. Morgan Cofer In This Chapter This chapter discusses the business case for Agility, presenting six benefits for teams and the enterprise. It also describes a financial model that shows why incremental development works. Takeaways Agility is not just about the team. There are product-management, project-management, and technical issues beyond the team’s control. Lean-Agile provides...