High Desert Potteryworks makes a variety of pottery products
that it sells to retailers, such as Home Depot. The company uses a
job-order costing system in which predetermined overhead rates are
used to apply manufacturing overhead cost to jobs. The
predetermined overhead rate in the Moulding Department is based on
machine-hours, and the rate in the Painting Department is based on
direct labour cost. At the beginning of the year, the company’s
management made the following estimates:
Department | ||||||
Moulding | Painting | |||||
Direct labour-hours | 13,250 | 62,500 | ||||
Machine-hours | 75,000 | 8,500 | ||||
Direct materials cost | $ | 515,000 | $ | 655,000 | ||
Direct labour cost | $ | 132,500 | $ | 437,500 | ||
Manufacturing overhead cost | $ | 682,500 | $ | 743,750 | ||
Job 205 was started on August 1 and completed on August 10. The
company’s cost records show the following information concerning
the job:
Department | ||||||
Moulding | Painting | |||||
Direct labour-hours | 35 | 130 | ||||
Machine-hours | 140 | 25 | ||||
Materials placed into production | $ | 520 | $ | 382 | ||
Direct labour cost | $ | 340 | $ | 730 | ||
Required:
1. Compute the predetermined overhead rate used
during the year in the Moulding Department. Compute the rate used
in the Painting Department. (Round "Cost per machine-hour"
answer to 2 decimal places.)
2. Compute the total overhead cost applied to Job
205. (Do not round intermediate calculations. Enter your
answer rounded to the nearest whole dollar.)
3-a. What would be the total cost recorded for Job
205? (Do not round intermediate calculations. Enter your
answers rounded to the nearest whole dollar.)
3-b. If the job contained 70 units, what would be
the cost per unit? (Do not round intermediate calculations
and round your final answer to 2 decimal
places.)
4. At the end of the year, the records of High
Desert Potteryworks revealed the following actual cost and
operating data for all jobs worked on during the year:
Department | ||||||
Moulding | Painting | |||||
Direct labour-hours | 10,500 | 62,500 | ||||
Machine-hours | 65,500 | 9,500 | ||||
Direct materials cost | $ | 435,000 | $ | 685,000 | ||
Direct labour cost | $ | 113,000 | $ | 441,000 | ||
Manufacturing overhead cost | $ | 607,550 | $ | 734,375 | ||
What was the amount of under- or overapplied overhead in each
department at the end of the year? (Do not round
intermediate calculations.)
1) Overhead rate
Molding overhead rate = 682500/75000 = 9.1 per MH
painting overhead rate = 743750/62500 = 11.90 per DLH
2) Total overhead applied = (140*9.1+130*11.90) = 2821
3a) Total Cost
Molding | Painting | Total | |
Direct material | 520 | 382 | 902 |
Direct labor | 340 | 730 | 1070 |
Overhead | 1274 | 1547 | 2821 |
Total Cost | 2134 | 2659 | 4793 |
3b) Unit cost = 4793/70 = 68.47
4) Calculate following
Applied overhead | Actual overhead | ||
Molding overhead | 65500*9.1 = 596050 | 607550 | 11500 Under applied |
Painting overhead | 62500*11.9 = 743750 | 734375 | 9375 Over applied |