Question

The following data were taken from the records of Griggs Company for December: Administrative expenses $100,800...

The following data were taken from the records of Griggs Company for December:

Administrative expenses $100,800
Cost of goods sold (at standard) 550,000
Direct materials price variance-unfavorable 1,680
Direct materials quantity variance-favorable (560)
Direct labor rate variance-favorable (1,120)
Direct labor time variance-unfavorable 490
Variable factory overhead controllable variance-favorable (210)
Fixed factory overhead volume variance-unfavorable 3,080
Interest expense 2,940
Sales 868,000
Selling expenses 125,000

Required:

Prepare an income statement for presentation to management. Refer to the list of Labels and Amount Descriptions for the exact wording of the answer choices for text entries. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. A colon (:) will automatically appear for you if it is required.

Tannin Products Inc. prepared the following factory overhead cost budget for the Trim Department for July of the current year, during which it expected to use 20,000 hours for production:

1

Variable overhead cost:

2

Indirect factory labor

$52,000.00

3

Power and light

8,000.00

4

Indirect materials

20,000.00

5

Total variable overhead cost

$80,000.00

6

Fixed overhead cost:

7

Supervisory salaries

$53,600.00

8

Depreciation of plant and equipment

39,200.00

9

Insurance and property taxes

119,700.00

10

Total fixed overhead cost

212,500.00

11

Total factory overhead cost

$292,500.00

Tannin has available 25,000 hours of monthly productive capacity in the Trim Department under normal business conditions. During July, the Trim Department actually used 22,000 hours for production. The actual fixed costs were as budgeted. The actual variable overhead for July was as follows:

1

Actual variable factory overhead cost:

2

Indirect factory labor

$56,360.00

3

Power and light

8,570.00

4

Indirect materials

24,300.00

5

Total variable cost

$89,230.00

Required:

Construct a factory overhead cost variance report for the Trim Department for July. Refer to the Amount Descriptions list provided for the exact wording of the answer choices for text entries. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Tannin Products Inc. prepared the following factory overhead cost budget for the Trim Department for July...
Tannin Products Inc. prepared the following factory overhead cost budget for the Trim Department for July of the current year, during which it expected to use 25,000 hours for production: 1 Variable overhead cost: 2 Indirect factory labor $62,500.00 3 Power and light 12,500.00 4 Indirect materials 25,000.00 5 Total variable overhead cost $100,000.00 6 Fixed overhead cost: 7 Supervisory salaries $52,200.00 8 Depreciation of plant and equipment 39,200.00 9 Insurance and property taxes 163,600.00 10 Total fixed overhead cost...
Tiger Equipment Inc., a manufacturer of construction equipment, prepared the following factory overhead cost budget for...
Tiger Equipment Inc., a manufacturer of construction equipment, prepared the following factory overhead cost budget for the Welding Department for May of the current year. The company expected to operate the department at 100% of normal capacity of 8,400 hours. 1 Variable costs: 2 Indirect factory wages $30,240.00 3 Power and light 20,160.00 4 Indirect materials 16,800.00 5 Total variable cost $67,200.00 6 Fixed costs: 7 Supervisory salaries $20,000.00 8 Depreciation of plant and equipment 36,200.00 9 Insurance and property...
Tiger Equipment Inc., a manufacturer of construction equipment, prepared the following factory overhead cost budget for...
Tiger Equipment Inc., a manufacturer of construction equipment, prepared the following factory overhead cost budget for the Welding Department for May of the current year. The company expected to operate the department at 100% of normal capacity of 8,400 hours. 1 Variable costs: 2 Indirect factory wages $30,240.00 3 Power and light 20,160.00 4 Indirect materials 16,800.00 5 Total variable cost $67,200.00 6 Fixed costs: 7 Supervisory salaries $20,000.00 8 Depreciation of plant and equipment 36,200.00 9 Insurance and property...
Tiger Equipment Inc., a manufacturer of construction equipment, prepared the following factory overhead cost budget for...
Tiger Equipment Inc., a manufacturer of construction equipment, prepared the following factory overhead cost budget for the Welding Department for May of the current year. The company expected to operate the department at 100% of normal capacity of 8,400 hours. 1 Variable costs: 2 Indirect factory wages $30,240.00 3 Power and light 20,160.00 4 Indirect materials 16,800.00 5 Total variable cost $67,200.00 6 Fixed costs: 7 Supervisory salaries $20,000.00 8 Depreciation of plant and equipment 36,200.00 9 Insurance and property...
Tiger Equipment Inc., a manufacturer of construction equipment, prepared the following factory overhead cost budget for...
Tiger Equipment Inc., a manufacturer of construction equipment, prepared the following factory overhead cost budget for the Welding Department for May of the current year. The company expected to operate the department at 100% of normal capacity of 8,400 hours. 1 Variable costs: 2 Indirect factory wages $30,240.00 3 Power and light 20,160.00 4 Indirect materials 16,800.00 5 Total variable cost $67,200.00 6 Fixed costs: 7 Supervisory salaries $20,000.00 8 Depreciation of plant and equipment 36,200.00 9 Insurance and property...
The following data were drawn from the records of Perez Corporation. Planned volume for year (static...
The following data were drawn from the records of Perez Corporation. Planned volume for year (static budget) 3,000 units Standard direct materials cost per unit 2.30 pounds @ $ 1.60 per pound Standard direct labor cost per unit 2.20 hours @ $ 3.50 per hour Total expected fixed overhead costs $ 13,200 Actual volume for the year (flexible budget) 3,200 units Actual direct materials cost per unit 1.80 pounds @ $ 2.20 per pound Actual direct labor cost per unit...
Direct Materials, Direct Labor, and Reports budgeted and actual costs for variable and fixed factory overhead...
Direct Materials, Direct Labor, and Reports budgeted and actual costs for variable and fixed factory overhead along with the related controllable and volume variances.Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. A detailed estimate of what a product should cost.Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 6,800 units of product were as follows: Standard Costs Actual Costs Direct materials 8,800 lb. at $4.90 8,700...
1. The following data relating to direct materials cost for October of the current year are...
1. The following data relating to direct materials cost for October of the current year are taken from the records of Good Clean Fun Inc., a manufacturer of organic toys: Quantity of direct materials used 4,200 lbs. Actual unit price of direct materials $3.80 per lb. Units of finished product manufactured 1,010 units Standard direct materials per unit of finished product 4 lbs. Direct materials quantity variance—unfavorable $624 Direct materials price variance—favorable $420 Determine the standard direct materials cost per...
Flexible Overhead Budget Leno Manufacturing Company prepared the following factory overhead cost budget for the Press...
Flexible Overhead Budget Leno Manufacturing Company prepared the following factory overhead cost budget for the Press Department for October of the current year, during which it expected to require 8,000 hours of productive capacity in the department: Variable overhead cost:    Indirect factory labor $70,400    Power and light 3,520    Indirect materials 17,600       Total variable overhead cost $91,520 Fixed overhead cost:    Supervisory salaries $32,030    Depreciation of plant and equipment 20,130    Insurance and property taxes 12,810       Total fixed overhead cost 64,970 Total factory...
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials,...
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 74,000 units of product were as follows: Standard Costs Actual Costs Direct materials 229,400 lbs. at $5.60 227,100 lbs. at $5.50 Direct labor 18,500 hrs. at $18.30 18,930 hrs. at $18.50 Factory overhead Rates per direct labor hr., based on 100% of normal capacity of 19,310 direct labor hrs.: Variable cost, $3.70 $67,770 variable...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT