Question

Which one of the following is the difference in direct material costs between the actual cost...

Which one of the following is the difference in direct material costs between the actual cost incurred during the period and the total standard cost in the flexible budget for the units manufactured during the period?

a) direct materials price variance

b) direct materials mix variance

c) direct materials usage variance

d) direct materials flexible-budget variance

e) direct materials efficency variance

Homework Answers

Answer #1

Solution :

The Answer is (d) Direct Material Flexible Budget Variance.

Flexible Budget is the budget which is adjusted as per the activity level or production level and cost are adjusted accordingly. The difference between Standard Material Cost generated by flexible budget and Actual Cost Incurred is called the Direct Material Flexible Budget Variance. All other options given in the question are incorrect since the difference is the between standard costs and actual costs not of quantity, rate, material mix.

Please vote up and write your doubts in comment section. Would be glad to help you further.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Mastery Problem: Manufacturing Cost Variance (Actual Costs Compared to Standard Costs) Manufacturing cost variances may come...
Mastery Problem: Manufacturing Cost Variance (Actual Costs Compared to Standard Costs) Manufacturing cost variances may come from material costs that are higher or lower than expected, material usage that is not what was expected, higher or lower labor costs than expected, or more or less time spent to produce an item than expected. Overhead cost and volume variances are another cause for costs to be higher or lower than what was expected. The total manufacturing variance can be broken down...
Direct Materials, Direct Labor, and Reports budgeted and actual costs for variable and fixed factory overhead...
Direct Materials, Direct Labor, and Reports budgeted and actual costs for variable and fixed factory overhead along with the related controllable and volume variances.Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. A detailed estimate of what a product should cost.Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 6,800 units of product were as follows: Standard Costs Actual Costs Direct materials 8,800 lb. at $4.90 8,700...
The direct labor rate variance is the difference between the a.actual costs and the actual hours...
The direct labor rate variance is the difference between the a.actual costs and the actual hours at the standard rate b.actual hours at the standard rate and the standard costs c.actual costs and the standard costs d.actual rate and the standard rate The direct materials quantity variance is the difference between the a.actual quantity at the standard price and the standard costs b.actual costs and standard costs c.standard quantity and the actual quantity d.actual costs and the standard price at...
     The accountant of JYD Corporation prepared the following cost analysis report on direct labor costs...
     The accountant of JYD Corporation prepared the following cost analysis report on direct labor costs for the jobs completed during the previous months: Job         Actual Hrs. at Actual Rates           Actual Hrs. at Standard Rates      Standard Hrs. at Standard Rates 105         P2,270                                                   P2,590                                                   P2,170 110         10,740                                                   10,970                                                   10,500 117         4,730                                                   4,900                                                   4,620 120         13,850                                                   13,600                                                   13,480 Total      P31,590                                P32,060                                P30,770 What is the total direct labor variance for the jobs completed? What is the labor rate variance? What is...
23-11 Hutto Corp. has set the following standard direct materials and direct labor costs per unit...
23-11 Hutto Corp. has set the following standard direct materials and direct labor costs per unit for the product it manufactures. # Lbs/Hrs per unit Cost per lb/Hr Standard Cost Materials 15 $4.00 $60 Direct Labor 3 $15.00 $45 During May the company incurred the following actual costs to produce 9,000 units. Total Lbs/Hrs Cost per lb/Hr Standard Cost Materials 138,000 $3.75 $517,500 Direct Labor 31,000 $15.10 $468,100 Compute the (1) direct materials price and quantity variances and (2) direct...
23-11 Hutto Corp. has set the following standard direct materials and direct labor costs per unit...
23-11 Hutto Corp. has set the following standard direct materials and direct labor costs per unit for the product it manufactures. # Lbs/Hrs per unit Cost per lb/Hr Standard Cost Materials 15 $4.00 $60 Direct Labor 3 $15.00 $45 During May the company incurred the following actual costs to produce 9,000 units. Total Lbs/Hrs Cost per lb/Hr Standard Cost Materials 138,000 $3.75 $517,500 Direct Labor 31,000 $15.10 $468,100 Compute the (1) direct materials price and quantity variances and (2) direct...
The total variable cost flexible-budget variance for any given period: Multiple Choice Is directly affected by...
The total variable cost flexible-budget variance for any given period: Multiple Choice Is directly affected by the difference between actual sales volume and the sales volume embodied in the flexible budget. Is decomposable into production-volume and production-mix components. Can be broken down into flexible-budget variances for major costs such as materials, labor, variable overhead, and variable selling expenses. Is decomposable into sales-volume and sales-mix components. Is the difference between actual total variable cost incurred and master budgeted total variable cost.
8. What does a favourable direct materials price variance indicate? a. The actual cost of materials...
8. What does a favourable direct materials price variance indicate? a. The actual cost of materials purchased was greater than the standard cost of materials purchased. b. The standard cost of materials purchased was less than the actual cost of materials purchased. c. The standard cost of materials purchased was greater than the actual cost of materials purchased. d. The actual quantity of materials used was less than the standard quantity of materials used for actual production. 9. In flexible...
Shade Company adopted a standard cost system several years ago. The standard costs for direct labor...
Shade Company adopted a standard cost system several years ago. The standard costs for direct labor and direct materials for its single product are as follows: Materials (5 kilograms × $12/kilogram) = $60/unit; direct labor (3.5 hours/unit × $20/hour) = $70/unit. All materials are issued at the beginning of processing. The operating data shown below were taken from the records for December: In-process beginning inventory None In-process ending inventory—80% complete as to labor 1,030 units Units completed during the period...
1. yers Corporation has the following data related to direct materials costs for November: actual costs...
1. yers Corporation has the following data related to direct materials costs for November: actual costs for 4,610 pounds of material, $5.00; and standard costs for 4,470 pounds of material at $6.10 per pound. What is the direct materials price variance? a.$854 favorable b.$5,071 favorable c.$5,071 unfavorable d.$854 unfavorable 2. Myers Corporation has the following data related to direct materials costs for November: actual costs for 4,650 pounds of material, $5.10 and standard costs for 4,430 pounds of material at...