Question

Calculate and Use Manufacturing Overhead Rate During the coming accounting year, Ester Manufacturing, Inc., anticipates the...

Calculate and Use Manufacturing Overhead Rate During the coming accounting year, Ester Manufacturing, Inc., anticipates the following costs, expenses, and operating data: Direct material (15,000 lb.) $ 225,000 Direct labor (@ $12/hr.) 480,000 Indirect material 35,000 Indirect labor 60,000 Sales commissions 90,000 Factory administration 65,000 Non factory administrative expenses 70,000 Other manufacturing overhead* 140,000 *Provides for operating 150,000 machine hours. a. Calculate the predetermined manufacturing overhead rate for the coming year for each of the following application bases: (1) direct labor hours, (2) direct labor costs, and (3) machine hours. Round direct labor hours and machine hours answers to two decimal places, when applicable. Round direct labor costs to two decimal places, when applicable (example: 76.25%). Application base Manufacturing overhead rate Direct labor hours $Answer Direct labor costs Answer% Machine hours $Answer b. For each item in requirement a, determine the proper application of manufacturing overhead to Job 128, to which 45 direct labor hours, $500 of direct labor cost, and 160 machine hours have been charged. Round answers to two decimal places, when applicable. Application base Overhead applied to Job 63 Direct labor hours $Answer Direct labor costs $Answer Machine hours $Answer

Homework Answers

Answer #1

a) Calculate predetermine overhead rate :

Predetermine overhead rate = Estimted overhead/Estimated allocation base

Basis on direct labour hour = 300000/40000 = 7.5 per labour hour

Basis on direct labour cost = 300000*100/480000 = 62.5% of direct labour cost

Basis on machine hour = 300000/150000 = 2 per machine hour

b) Calculate overhead applied :

Basic on direct labour hour = 45*7.5 = 337.50

Basis on direct labour cost = 500*62.5% = 312.50

Basis on machine hour = 162*2 = 320

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Calculating Plantwide Predetermined Overhead Rate. Manufacturing overhead costs totaling $5,000,000 are expected for this coming year....
Calculating Plantwide Predetermined Overhead Rate. Manufacturing overhead costs totaling $5,000,000 are expected for this coming year. The company also expects to use 100,000 direct labor hours and 40,000 machine hours. Required: Calculate the plantwide predetermined overhead rate using direct labor hours as the base. Provide a one-sentence description of how the rate will be used to allocate overhead costs to products. Calculate the plantwide predetermined overhead rate using machine hours as the base. Provide a one-sentence description of how the...
Amberjack Company is trying to decide on an allocation base to use to assign manufacturing overhead...
Amberjack Company is trying to decide on an allocation base to use to assign manufacturing overhead to jobs. The company has always used direct labor hours to assign manufacturing overhead to products, but it is trying to decide whether it should use a different allocation base such as direct labor dollars or machine hours. Actual and estimated data for manufacturing overhead, direct labor cost, direct labor hours, and machine hours for the most recent fiscal year are summarized here: Estimated...
Amberjack Company is trying to decide on an allocation base to use to assign manufacturing overhead...
Amberjack Company is trying to decide on an allocation base to use to assign manufacturing overhead to jobs. The company has always used direct labor hours to assign manufacturing overhead to products, but it is trying to decide whether it should use a different allocation base such as direct labor dollars or machine hours. Actual and estimated data for manufacturing overhead, direct labor cost, direct labor hours, and machine hours for the most recent fiscal year are summarized here: Estimated...
Johnson Inc. is a job-order manufacturing company that uses a predetermined overhead rate based on direct...
Johnson Inc. is a job-order manufacturing company that uses a predetermined overhead rate based on direct labor hours to apply overhead to individual jobs. For the current year, estimated direct labor hours are 93,000 and estimated factory overhead is $511,500. The following information is for September of the current year. Job A was completed during September, and Job B was started but not finished September 1, inventories        Materials inventory $ 8,400    Work-in-process inventory (All Job A) 33,000    Finished goods...
1. During the current month, Waterway Company incurs the following manufacturing costs. (a) Purchased raw materials...
1. During the current month, Waterway Company incurs the following manufacturing costs. (a) Purchased raw materials of $17,800 on account. (b) Incurred factory labor of $38,200. (c) Factory utilities of $3,800 are payable, prepaid factory property taxes of $2,810 have expired, and depreciation on the factory building is $9,800. Record the company’s manufacturing costs in its job order costing system. 2. During January, its first month of operations, Ayayai Company accumulated the following manufacturing costs: raw materials purchased $4,100 on...
​Sybil, Inc. uses a predetermined overhead allocation rate to allocate manufacturing overhead costs to jobs. The...
​Sybil, Inc. uses a predetermined overhead allocation rate to allocate manufacturing overhead costs to jobs. The company recently completed Job 300X. This job used 14 machine hours and 4 direct labor hours. The predetermined overhead allocation rate is calculated to be​ $44 per machine hour. What is the amount of manufacturing overhead allocated to Job 300X using machine hours as the allocation​ base? a. 176 b. 616 c. 792 d. 440
Fortify, Inc. uses a predetermined manufacturing overhead rate based on direct labor hours to apply its...
Fortify, Inc. uses a predetermined manufacturing overhead rate based on direct labor hours to apply its indirect product costs to jobs. The following information has been collected for the previous year: Direct materials $ 162,000 Direct labor 212,000 Sales commissions 112,000 Indirect labor 62,000 Rent on office equipment 37,000 Depreciation — factory building 87,000 Utilities — factory 221,000 Fortify used 37,000 direct labor hours and 62,000 machine hours during the previous year. What is the predetermined overhead rate per direct...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on...
Verizox Company uses a job order cost system with manufacturing overhead applied to products based on direct labor hours. At the beginning of the most recent year, the company estimated its manufacturing overhead cost at $172,960. Estimated direct labor cost was $454,480 for 18,400 hours. Actual costs for the most recent month are summarized here: Item Description Total Cost Direct labor (1,840 hours) $ 45,449 Indirect costs Indirect labor 2,510 Indirect materials 3,440 Factory rent 3,280 Factory supervision 4,770 Factory...
Wilmington Company has two manufacturing departments—Assembly and Fabrication. It considers all of its manufacturing overhead costs...
Wilmington Company has two manufacturing departments—Assembly and Fabrication. It considers all of its manufacturing overhead costs to be fixed costs. The first set of data that is shown below is based on estimates from the beginning of the year. The second set of data relates to one particular job completed during the year—Job Bravo. Estimated Data Assembly Fabrication Total Manufacturing overhead costs $ 3,570,000 $ 3,990,000 $ 7,560,000 Direct labor-hours 105,000 63,000 168,000 Machine-hours 42,000 210,000 252,000 Job Bravo Assembly...
Part IV. Predetermined Overhead            Cranston Company estimates the following overhead costs for the coming year:...
Part IV. Predetermined Overhead            Cranston Company estimates the following overhead costs for the coming year: Equipment depreciation                               $160,000 Equipment maintenance                                   60,000 Supervisory salaries                                         40,000 Factory rent                                                   100,000 Total                                                           $360,000 Cranston is also budgeting $600,000 in direct labor costs and 15,000 machine hours for the coming year. Required: a.                         b. Calculate the predetermined overhead rate using machine hours as the allocation base.