1. The differences are in the accuracy and complexity of the two methods.

2. Traditional costing is more simplistic and less accurate than ABC, and typically assigns overhead cost to products based on an arbitrary average rate.

3. ABC is more complex and more accurate than traditional costing.

4.Traditional cost accounting is obsolete whereas Activity Based Accounting is used more by various target-oriented companies.

5. ABC methods help the company to identify the needs of keeping or eliminating certain activities to add value to the products.

6. TCA methods focus on the structure rather than on processes whereas ABC methods focus on the activities or processes rather than on the structure.

7.ABC provides accurate costs whereas TCA accumulates values arbitrarily.

8. TCA is almost obsolete where as ABC methods are largely in use since 1981.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Compare and Contrast between Traditional Costing and Activity-based costing
Compare and Contrast between Traditional Costing and Activity-based costing
Accountants for Dylan Co. used traditional and ABC costing methods to calculate unit costs for two...
Accountants for Dylan Co. used traditional and ABC costing methods to calculate unit costs for two of the company’s products: Zippo and Zappo. The information they accumulated is presented below: Traditional Costing ABC Costing ZIPPO ZAPPO ZIPPO ZAPPO Units Produced 5,000 20,000 5,000 20,000 Cost PER UNIT:    Direct Materials $35 $25 $35 $25    Direct Labor $15 $15 $15 $15    Overhead $40 $40 $93 $27      Total Cost Per Unit $90 $80 $143 $67 Which costing method, Traditional...
Which of the following is not generally true when a company compares ABC and traditional costing?...
Which of the following is not generally true when a company compares ABC and traditional costing? A.        ABC uses more cost drivers. B.        ABC allocates cost based solely on production volume. C.        ABC is more expensive. D.        ABC is less likely to undercost complex, low-volume products.
Compare and contrast activity-based costing with traditional system using a single application base for conversion cost.
Compare and contrast activity-based costing with traditional system using a single application base for conversion cost.
What is the difference between traditional cost allocation and activity-based costing (ABC) systems? (2 marks) Explain...
What is the difference between traditional cost allocation and activity-based costing (ABC) systems? Explain how ABC systems facilitate better planning and control.
1. One of the advantages of activity-based costing systems over traditional systems is that ABC systems...
1. One of the advantages of activity-based costing systems over traditional systems is that ABC systems require less record-keeping. true/ false 2. The term "quality" refers to the degree to which products or services exceed customer expectations. True or False
Sunland Inc. has conducted the following analysis related to its product lines, using a traditional costing...
Sunland Inc. has conducted the following analysis related to its product lines, using a traditional costing system (volume-based) and an activity-based costing system. Both the traditional and the activity-based costing systems include direct materials and direct labor costs. Total Costs Products Sales Revenue Traditional ABC Product 540X $200,000 $53,000 $47,100 Product 137Y 162,000 48,000 29,000 Product 249S 92,000 25,000 49,900 For each product line, compute operating income using the traditional costing system. Product 540X $enter a dollar amount Product 137Y...
Marigold Inc. has conducted the following analysis related to its product lines, using a traditional costing...
Marigold Inc. has conducted the following analysis related to its product lines, using a traditional costing system (volume-based) and an activity-based costing system. Both the traditional and the activity-based costing systems include direct materials and direct labor costs. Total Costs Products Sales Revenue Traditional ABC Product 540X $207,000 $54,000 $48,700 Product 137Y 155,000 50,000 33,000 Product 249S 85,000 11,000 33,300 (a) For each product line, compute operating income using the traditional costing system. Product 540X $enter a dollar amount Product...
is volume costing system the same as traditional costing system?
is volume costing system the same as traditional costing system?
"Time-Driven Activity-Based Costing (ABC)" Please respond to the following: Analyze the major benefits and major weaknesses...
"Time-Driven Activity-Based Costing (ABC)" Please respond to the following: Analyze the major benefits and major weaknesses of traditional Activity-Based Costing (ABC) in determining accurate overhead costs over a time-driven ABC system. Provide a rationale for your response. Suggest the manner in which a business can achieve a competitive advantage in the marketplace through the use of ABC. Provide two (2) reasons to convince senior management that they should implement an ABC system.
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT
Active Questions
  • GPS Watches Please submit your finalized marketing plan. Conduct a final proof read.
    asked 47 seconds ago
  • A business PhD student who lived on a naval base, looked at prices of items at...
    asked 10 minutes ago
  • 1 Consider diversity, interpersonal communication, & technology in the workplace & explain the roles they may...
    asked 18 minutes ago
  • 1 Explain how "triggers to imbalance" in work-life balance influence the imbalance & how they can...
    asked 33 minutes ago
  • Spaulding is the leading maker for basketballs in the US. Spaulding prides itself on the quality...
    asked 44 minutes ago
  • Select True or False for the following statements about Heisenberg's Uncertainty Principle.  True False  It is possible to...
    asked 1 hour ago
  • Explain why, to maximize entropy, ice must remain at 0 degrees Celsius until all of it...
    asked 1 hour ago
  • THE CODE MUST BE PYTHON superHeroes = {   "MoleculeMan": {       "age": 29,       "secretIdentity": "Dan Jukes",       "superpowers":...
    asked 1 hour ago
  • Which of the four complexes of the mitochondrial electron transfer chain does not directly contribute to...
    asked 1 hour ago
  • Police response time to an emergency call is the difference between the time the call is...
    asked 1 hour ago
  • A space vehicle is traveling at 5030 km/h relative to Earth when the exhausted rocket motor...
    asked 1 hour ago
  • You have 3 parallel production lines which supply the assembly line. Acceptable quality percentage(AQP) for lines...
    asked 1 hour ago