Question

Griffen Company makes pipe using metal. The company uses a standard costing system. Variable overhead is...

Griffen Company makes pipe using metal. The company uses a standard costing system. Variable overhead is allocated on the basis of direct material usage (pounds). Overhead is allocated to units based on expected production of 12,300 units. Griffen maintains a materials inventory, so the amount of material used is not necessarily the same as the amount of material purchased in any one month.

The standard cost sheet for a unit of pipe follows.

Direct material 9 pounds @ $ 8 $ 72.00
Direct labor 5 hours @ $ 28 140.00
Variable overhead 9 pounds @ $ 5 45.00
Fixed overhead 23.00
$ 280.00

August financial results show that the average purchase price of metal was $8.30 per pound. The purchase price variance $34,695 unfavorable. The variable overhead efficiency variance was 8,300 unfavorable. Good output produced totaled 15,300 units.

Required:

a. How many pounds of metal were purchased in August? (Do not round intermediate calculations.)

b. What was the direct material efficiency variance in August? (Do not round intermediate calculations. Indicate the effect of each variance by selecting "F" for favorable, or "U" for unfavorable. If there is no effect, do not select either option.)

c. How many pounds of metal were used in August? (Do not round intermediate calculations.)

Homework Answers

Answer #1

In the given problem there is no details of inventory so the total amount purchased is used for production

For any clarifications please comment.

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct...
Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct labor-hours and its standard cost card per unit is as follows: Direct materials: 5 pounds at $9 per pound $ 45 Direct labor: 3 hours at $14 per hour 42 Variable overhead: 3 hours at $8 per hour 24 Total standard cost per unit $ 111 The planning budget for March was based on producing and selling 28,000 units. However, during March the company...
Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct...
Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct labor-hours and its standard cost card per unit is as follows:   Direct materials: 4 pounds at $8 per pound $ 32          Direct labor: 2 hours at $16 per hour 32          Variable overhead: 2 hours at $6 per hour 12          Total standard cost per unit $ 76           The planning budget for March was based on producing and selling 32,000...
Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct...
Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct labor-hours and its standard cost card per unit is as follows: Direct materials: 5 pounds at $8 per pound $ 40 Direct labor: 3 hours at $15 per hour 45 Variable overhead: 3 hours at $9 per hour 27 Total standard cost per unit $ 112 The planning budget for March was based on producing and selling 21,000 units. However, during March the company...
Overhead Variances, Four-Variance Analysis Oerstman, Inc., uses a standard costing system and develops its overhead rates...
Overhead Variances, Four-Variance Analysis Oerstman, Inc., uses a standard costing system and develops its overhead rates from the current annual budget. The budget is based on an expected annual output of 125,000 units requiring 500,000 direct labor hours. (Practical capacity is 520,000 hours.) Annual budgeted overhead costs total $830,000, of which $585,000 is fixed overhead. A total of 119,100 units using 498,000 direct labor hours were produced during the year. Actual variable overhead costs for the year were $261,100, and...
Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct...
Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct labour-hours, and its standard costs per unit are as follows:   Direct materials: 5 kg at $10.00 per kg $ 50.00     Direct labour: 3 hours at $17 per hour 51.00     Variable overhead: 3 hours at $7 per hour 21.00     Total standard cost per unit $ 122.00   The company planned to produce and sell 24,000 units in March. However, during March the company actually produced and...
Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct...
Preble Company manufactures one product. Its variable manufacturing overhead is applied to production based on direct labor-hours and its standard cost card per unit is as follows: Direct materials: 5 pounds at $8.00 per pound $ 40.00 Direct labor: 2 hours at $14 per hour 28.00 Variable overhead: 2 hours at $5 per hour 10.00 Total standard cost per unit $ 78.00 The planning budget for March was based on producing and selling 25,000 units. However, during March the company...
Druid Company makes a single product and uses a standard costing system that applies overhead on...
Druid Company makes a single product and uses a standard costing system that applies overhead on the basis of direct labor hours. They recently used 2,000 labor hours to produce 400 units. Their static budget indicated expectations of 500 units, 3,000 DLH and $60,000 in variable overhead. Actual VOH totaled $30,000. What was the variable overhead spending variance? Please indicate favorable variances with an "f" and unfavorable variances with a "u" (Round to the nearest dollar at the end of...
Lamp Light Limited (LLL) manufactures lampshades. It applies variable overhead on the basis of direct labor...
Lamp Light Limited (LLL) manufactures lampshades. It applies variable overhead on the basis of direct labor hours. Information from LLL’s standard cost card follows: Standard Quantity Standard Rate Standard Unit Cost Variable manufacturing overhead 0.6 $0.80 $0.48 During August, LLL had the following actual results: Units produced and sold 24,600 Actual variable overhead $ 9,450 Actual direct labor hours 15,600 Required: Compute LLL’s variable overhead rate variance, variable overhead efficiency variance, and over- or underapplied variable overhead. (Do not round...
Patel and Sons, Inc., uses a standard cost system to apply overhead costs to units produced....
Patel and Sons, Inc., uses a standard cost system to apply overhead costs to units produced. Practical capacity for the plant is defined as 55,800 machine hours per year, which represents 27,900 units of output. Annual budgeted fixed overhead costs are $279,000 and the budgeted variable overhead cost rate is $3.90 per unit. Factory overhead costs are applied on the basis of standard machine hours allowed for units produced. Budgeted and actual output for the year was 21,700 units, which...
Erie Company manufactures a small mp3 player called the Jogging Mate. The company uses standards to...
Erie Company manufactures a small mp3 player called the Jogging Mate. The company uses standards to control its costs. The labor standards that have been set for one Jogging Mate mp3 player are as follows: Standard Hours Standard Rate per Hour Standard Cost      27 minutes $6.00 $2.70 During August, 9,555 hours of direct labor time were needed to make 19,500 units of the Jogging Mate. The direct labor cost totaled $56,375 for the month. Required: 1. According to the standards,...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT