city council member is faced with constituents complaining about
how long it's taking to fix potholes. The city used to use a
contractor whose mean time to repair a pothole was 3.2 days The
council member thinks that the new contractor's mean time to repair
a pothole higher than 3.2 days. She randomly selects a sample of 12
pothole service calls and obtains the following times to repair (in
days):
is there enough evidence to support the councilmembers claim?
( Use =0.05 level of significance). Show all the steps of an
appropriate hypothesis test. Assume all conditions are satisfied
for your chosen hypothesis test.