Question

ABC Electronic ware house sale batteries, and is very popular item. Demand for this is normally...

ABC Electronic ware house sale batteries, and is very popular item. Demand for this is normally distributed. Average demand was 50 packs per day and a standard deviation of 10. Lead time is constant and which is 4 days. A 99% service level was desired.

A) 241

B) 221

C) 235

D) 226

E) 247

Now, ABC Electronic ware house sale customize Laptop. Lead time for this is normally distributed. Average Lead time is 10 days and a standard deviation of 4. The daily demand is constant at 10 packs per day. An 85% service level was desired.

A) 151

B) 142

C) 166

D) 193

E) 166

Homework Answers

Answer #1

1)

mean lead time μl= 4
standard deviation during lead time σl= 0
mean demand μd= 50
standard deviation of demand σd= 10
for 99% service level , corresponding critical z = 2.33
reorder point=demand during material in transit+safety stock
=lead time*demand/time period +safety stock
=μld+z*sqrt(μld2d2l2) = 246.600~ 247

option E is correct

2)

mean lead time μl= 10
standard deviation during lead time σl= 4
mean demand μd= 10
standard deviation of demand σd= 0
for 85% service level , corresponding critical z = 1.04
reorder point=demand during material in transit+safety stock
=lead time*demand/time period +safety stock
=μld+z*sqrt(μld2d2l2) = 141.600~ 142

option B is correct

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
(a) The demand for item X is estimated to be normally distributed with a mean demand...
(a) The demand for item X is estimated to be normally distributed with a mean demand of 300 units per day and a standard deviation of 20 units per day. What is the reorder point and safety stock under continuous review policy? (Assume 95% service level, z (0.95) =1.65) (b) The supplier has changed. All costs remain the same, but lead time changes from 3 days to 30 days.What would be the new reorder point and safety stock? What do...
Q. Daily demand for a product is normally distributed with a mean M= 12 units and...
Q. Daily demand for a product is normally distributed with a mean M= 12 units and standard deviation Q= 4 units. Lead time is 9 days. The order quantity for this item is set at a 12-day supply. a. If a minimum probability of satisfying demand per cycle of 0.80 is desired, what is the reorder point? b. If a fill rate of 9% is desired, what is the reorder point?
Daily demand for a certain product is normally distributed, with a mean of 200 and a...
Daily demand for a certain product is normally distributed, with a mean of 200 and a standard deviation of 25. The supplier is reliable and maintains a constant lead time of 4 days. The cost of placing an order is $10 and the cost of holding inventory is $0.50 per unit per year. Consider service level of 90%. What is the required safety stock? a.) 64 b.) 85 c.) 75 d.) 54 What is the reordering point? 864 762 575...
The daily demand for 60” flat-screen TVs at the Sterling Archer’s discount warehouse is normally distributed...
The daily demand for 60” flat-screen TVs at the Sterling Archer’s discount warehouse is normally distributed with a mean of 5 units and a standard deviation of 5 units. The lead time for receiving a shipment of new TVs is 10 days and is fairly consistent. Determine the reorder point and safety stock for service levels of 90%, 95%, and 98%.
Choose the right answer: A product’s usage is normally distributed with average demand of 400 units/day...
Choose the right answer: A product’s usage is normally distributed with average demand of 400 units/day and a weekly standard deviation of 125. The product’s lead time is 20 days. Currently, the reorder point for this product is 8,200. The company work 5 days per week. If the company would like to have a service level of 95% for this product then A. it must decrease its safety stock by approximately 412 units. B. it must decrease its safety stock...
The daily demand for 52-inch plasma TVs at Sarah’s Discount Emporium is normally distributed, with an...
The daily demand for 52-inch plasma TVs at Sarah’s Discount Emporium is normally distributed, with an average of 8 and a standard deviation of 2.5 units. The lead time for receiving a shipment of new TVs is 9 days and is constant. Determine the service level for reorder point (ROP) of 84. We are assuming a continuous-review model is used. Note: 1- Do not round any of your intermediate numbers. 2- Before rounding your final answer, convert it to the...
Flex Inc., an electronic system integrator, developed a new product, which consists of a key component...
Flex Inc., an electronic system integrator, developed a new product, which consists of a key component sourced from a supplier and the software developed in house. For the coming selling season, Flex’s demand forecast for the integrated system is normally distributed with a mean of 1000 and standard deviation of 600. Flex incurs no costs associated with software integration. It sells the integrated system at $121 per unit to several of its key customers. Flex can also dump any integrated...
In a large law firm, the demand for copier paper has normally distributed with an average...
In a large law firm, the demand for copier paper has normally distributed with an average of 10 packages of a day with the standard deviation of 2. Each package contains 500 sheets. The firm operates 255 days a year. Holding cost for the paper is $1 per year per package, and ordering cost is $10 per order. a) What order quantity would minimize total annual ordering and holding cost? b) What is the total annual inventory cost associated with...
Question 5: Forecasting (8 p) The table below shows the demand (in units per quarter) of...
Question 5: Forecasting (8 p) The table below shows the demand (in units per quarter) of a specific product in the past three years. Quarter Year 1 2 3 4 2015 350 254 176 228 2016 367 258 169 236 2017 342 250 166 228 Predict demand in quarter 1 and quarter 2 of 2018, given that the demand forecast for the whole year is a total of 1,040 units. Question 6: DRP (8 p) A central DC supplies a...
A loan made on March 14 is due September 13 of the following year. Find the...
A loan made on March 14 is due September 13 of the following year. Find the exact time for the loan in a​ non-leap year and a leap year. days. The exact time in a​ non-leap year is ? days The exact time in a leap year is ? days. Data Table Sequential Numbers for Dates of the Year Day of Month Jan. Feb. Mar. Apr. May June July Aug. Sept. Oct. Nov. Dec. 1 1 32 60 91 121...