Professor Murphy wants to set up a control chart to monitor the percentage of absenteeism in...

Professor Murphy wants to set up a control chart to monitor the percentage of absenteeism in his introductory statistics course (50 students are registered). Absences per period for the last 15 class sessions are in the table below.

Session

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

Absent

5

0

2

2

3

8

10

3

5

5

1

2

0

2

3

Using 3 sigma limits, calculate lower and upper control limits for a p-chart to track absences.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
As a member of a management team, you are concerned with the absenteeism among​ assistants. The...
As a member of a management team, you are concerned with the absenteeism among​ assistants. The issue has been raised by your management team, who feel they often have to perform work normally done by their assistants. To get the​ facts, absenteeism data were gathered for the last three​ weeks, which is considered a representative period for future conditions. After taking random samples of 65 personnel files each​ day, the following data were​ produced:                                                                                                                                         Day Assistants Absent Day Assistants...
As a hospital administrator of a large​ hospital, you are concerned with the absenteeism among​ nurses'...
As a hospital administrator of a large​ hospital, you are concerned with the absenteeism among​ nurses' aides. The issue has been raised by registered​ nurses, who feel they often have to perform work normally done by their aides. To get the​ facts, absenteeism data were gathered for the last three​ weeks, which is considered a representative period for future conditions. After taking random samples of 60 personnel files each​ day, the following data were​ produced:                                                                                                                                         Day Aides Absent Day...
HCH Manufacturing has decided to use a p-Chart with 2-sigma control limits to monitor the proportion...
HCH Manufacturing has decided to use a p-Chart with 2-sigma control limits to monitor the proportion of defective steel bars produced by their production process. The quality control manager randomly samples 250 steel bars at 12 successively selected time periods and counts the number of defective steel bars in the sample. Sample   Defects 1   7 2   10 3   14 4   8 5   9 6   11 7   9 8   9 9   14 10   11 11   7 12   8 Step 1 of...
calculate the upper and lower control limits and then construct a control chart. Display your chart....
calculate the upper and lower control limits and then construct a control chart. Display your chart. Question: Using the control chart rules for detecting special causes, can you detect a special cause? Explain why or why not. Week Average Delay Time (in days) 1 34 2 30 3 35 4 32 5 28 6 26 7 29 8 28 9 35 10 26 11 34 12 31 13 28 14 40 15 26 16 32 17 31 18 30 19...
Inter State Moving and Storage Company is setting up a control chart to monitor the proportion...
Inter State Moving and Storage Company is setting up a control chart to monitor the proportion of residential moves that result in written complaints due to late delivery, lost items, or damaged items. A sample of 40 moves is selected for each of the last 12 months. The number of written complaints in each sample is 7, 9, 4, 9, 2, 6, 11, 8, 5, 5, 6, and 15. Click here for the Excel Data File Insert the mean proportion...
1 An x̅ chart with a sample size of 4 is used to control the mean...
1 An x̅ chart with a sample size of 4 is used to control the mean of a normally distributed quality characteristic. It is known that process standard deviation is 8. The upper and lower control limits of the chart are 147 and 123 respectively. Assume the process mean shifts to 121. What is the probability that this shift is detected on the first subsequent sample? What is expected number of samples taken before the shift is detected? 2 The...
Using samples of 200 credit card statements, an Auditor found the following: ---Sample Number: 1    2    ...
Using samples of 200 credit card statements, an Auditor found the following: ---Sample Number: 1    2     3     4     5     6     7   8 9    10    11   12   13   14   15 Number of Errors:    17  12   11   12   10    10   17   15   12   13    15    10     7     8      10 Determine lower and upper control limits for the fraction of errors using three-sigma limits. Question 8 options: 0 , .126 .017 , .101 .026 , .093 .009 , .109 None of the Above The Quality Control...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.7 4 95.42 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 0.9 8 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.58 1.3 14 95.22 0.6 15 95.04 0.8 16...
A taxi company wants to do an annual review of its service by checking the number...
A taxi company wants to do an annual review of its service by checking the number of monthly complaints. The total number of complaints in each of the last 12 months were 15, 9, 13, 12, 9, 20, 8, 10, 16, 11, 18, and 3. If 3-sigma limits are used to construct a control chart (corresponding to 99.73 percent) calculate the upper control limit (UCL) and the lower control limit (LCL) of this control chart.                         b. Examining the data...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.7 4 95.42 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 0.9 8 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.60 1.3 14 95.22 0.6 15 95.04 0.8 16...