Question

. A sport goods company wants to determine the number of All-Pro and College footballs to...

. A sport goods company wants to determine the number of All-Pro and College footballs to produce in order to maximize profit. Constraints affecting the production quantities are the production capacities in three departments: cutting and dyeing; sewing; and inspection and packaging. There are 550 hours of cutting and dyeing time, 400 hours of sewing time, and 150 hours of inspection and packaging time available. Each All-Pro football requires 15 minutes of cutting and dyeing time, 10 minutes of sewing time, and 12 minutes of inspection and packaging time. Each College football requires 12 minutes of cutting and dyeing time, 10 minutes of sewing time, and 10 minutes of inspection and packaging time.

                                                                                

The company wants to produce at least 500 All-pro footballs and at least 350 College footballs.

Each All-Pro football provides a profit of $16.50 and each College football provides a profit of $11.50.

Formulate a linear programming model for the above situation by determining

(a) The decision variables

(b) Determine the objective function. What does it represent?

(c) Determine all the constraints. Briefly describe what each constraint represents.

Note: Do NOT solve the problem after formulating.

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A computer company manufactures two types of computers. Each type of computer will require assembly time,...
A computer company manufactures two types of computers. Each type of computer will require assembly time, inspection time, and storage space. The amounts of each of these resources that can be devoted to the production of the computers is limited. The manager wants to determine the quantity of each computer to produce to maximize the profit generated by sales of these computers. In order to develop a suitable model of the problem, the manager has met with design and manufacturing...
Harriet is trying to determine how many units of two types of lawn mowers to produce...
Harriet is trying to determine how many units of two types of lawn mowers to produce each day. One of these is the Standard model, while the other is the Deluxe model. The profit per unit on the Standard model is $60, while the profit per unit on the Deluxe model is $40. The Standard model requires 20 minutes of assembly time, while the Deluxe model requires 35 minutes of assembly time. The Standard model requires 10 minutes of inspection...
NEED TO ACTUALLY HAVE THE EXCEL DOCUMENT OR I WILL FAIL THE QUESTION. CANT BE SCREENSHOT...
NEED TO ACTUALLY HAVE THE EXCEL DOCUMENT OR I WILL FAIL THE QUESTION. CANT BE SCREENSHOT Attach the excel document please 1. Create the model and use Excel Solver to answer the following: A computer company manufactures two types of computers. Each type of computer will require assembly time, inspection time, and storage space. The amounts of each of these resources that can be devoted to the production of the computers is limited. The manager wants to determine the quantity...
A manufacturer produces four parts: XJ201, XM897, TR29, and BR788. The net profit per unit are...
A manufacturer produces four parts: XJ201, XM897, TR29, and BR788. The net profit per unit are $9, $12, $15, and $11 respectively. The products are each processed in the wiring and drilling departments then go to assembly. The final step in the plant is a final inspection. The time in minutes spent at each of the four departments is listed in the following table:                         Wiring             Drilling            Assembly        Inspection XJ201             30                    180                  120                  30 XM897           90                    60                    240                  60 TR29              ...
. A manufacturing company produces diesel engines in four factories located in Tucson, Seattle, Baltimore, and...
. A manufacturing company produces diesel engines in four factories located in Tucson, Seattle, Baltimore, and Detroit. Three trucking firms purchase these engines for their plants located in Nashville, Miami, and Charleston. The supplies and demands, along with the per engine transportation costs in dollars are given below:                                                                           Plant                                                               Nashville             Miami         Charleston         Supply              __________________________________________________________________                         Tucson                800               1100                400                  35    Factory            Seattle                 550               950                 600                  35                        ...
Complete in Excel: A manufacturer produces four parts: XJ201, XM897, TR29, and BR788. The net profit...
Complete in Excel: A manufacturer produces four parts: XJ201, XM897, TR29, and BR788. The net profit per unit are $9, $12, $15, and $11 respectively. The products are each processed in the wiring and drilling departments then go to assembly. The final step in the plant is a final inspection. The time in minutes spent at each of the four departments is listed in the following table:                         Wiring             Drilling            Assembly        Inspection XJ201             30                    180                  120                  30 XM897           90                    60                   ...
Answer Questions 2 and 3 based on the following LP problem. Let     P1 = number of...
Answer Questions 2 and 3 based on the following LP problem. Let     P1 = number of Product 1 to be produced           P2 = number of Product 2 to be produced           P3 = number of Product 3 to be produced Maximize 100P1 + 120P2 + 90P3         Total profit Subject to         8P1 + 12P2 + 10P3 ≤ 7280       Production budget constraint             4P1 + 3P2 + 2P3 ≤ 1920       Labor hours constraint                                    P1 > 200         Minimum quantity needed...
Value-Added and Non-Value-Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: An...
Value-Added and Non-Value-Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: An estimate of the non-value-added cost caused by each activity. If required, round your final answer to the nearest dollar. The root causes of the activity cost (such as plant layout, process design, and product design). The appropriate cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection. Choose " Multiple" in the Root cause column, wherever there is more than one root...
Babaloo leather company produces briefcases from leather, fabric, and synthetic materials in a single production department....
Babaloo leather company produces briefcases from leather, fabric, and synthetic materials in a single production department. The basic product is a standard briefcase made from leather and lined with fabric. Babaloo has a good reputation in the market because the standard briefcase is a high-quality item that has been produced for many years. Last year, the company decided to expand its product line and produce specialty briefcases for special orders. These briefcases differ from the standard in that they vary...
Fine Clothing Company produces Jackets from leather, fabric, and synthetic materials in a single production department....
Fine Clothing Company produces Jackets from leather, fabric, and synthetic materials in a single production department. The basic product is a standard jacket made from leather and lined with fabric. Fine Clothing has a good reputation in the market because the standard jacket is a high-quality item that has been produced for many years. Last year, the company decided to expand its product line and produce specialty jackets for special orders. These jackets differ from the standard in that they...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT