Suggest a variables control chart in the Education field. Provide the metric and how it is calculated along with how this information would be tracked and interpreted. Include the graph
Year |
Biology |
Business Administration |
Psychology |
Economics |
Nursing |
Computer Science |
2013 |
389 |
342 |
310 |
220 |
211 |
150 |
2014 |
396 |
365 |
302 |
224 |
217 |
146 |
2015 |
420 |
350 |
343 |
226 |
201 |
138 |
2016 |
416 |
341 |
332 |
233 |
204 |
155 |
2017 |
405 |
353 |
322 |
241 |
209 |
152 |
Creating X -bar and S chart for variables in excel
Step - by step procedure
1. first bring data in to excel sheet.
find the control chart table of contents (Biasing Constraints) from internet. This will help to calculate Lower and upper control limit.
3. Our sample size is 8 . so A3 = 1.427, B3 = 0, B4 = 2.089 (Refer the biasing table)
4. Now we need to calcluate X-bar,St.dev,UCL's,LCLx,X bar-bar, and UCLx
5.X-bar is an average of week (calculation in row wise) "formula = "=IF(C5="","",AVERAGE(C5:N5))"
6. st.dev = =IF(C5="","",STDEV(C5:N5))
7.S-bar = average(st.dev)
8. LCLs = B3* S-bar
9.UCLs = B4* St.dev
10. LCLx = (X bar-bar) - (A3 * S-bar)
11 X bar-bar = Average (S-bar)
12 UCLx = (X bar-bar) + (A3 * S-bar)
Does it appear that the process is in control? Explain
As per the chart , education process is in perfect control
both x-bar and x double are under the upper control.