A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table.
OBSERVATIONS (minutes per cycle) | ||||||||||||||||
Element | Performance Rating |
1 | 2 | 3 | 4 | 5 | 6 | |||||||||
1 | 85 | % | 0.40 | 0.45 | 0.35 | 0.35 | 0.35 | 0.35 | ||||||||
2 | 80 | 1.40 | 1.40 | 1.35 | 1.35 | 1.35 | 1.40 | |||||||||
3 | 125 | 0.75 | 0.75 | 0.65 | 0.70 | 0.75 | 0.70 | |||||||||
4 | 110 | 1.00 | 1.05 | 1.00 | 1.05 | 1.05 | 1.10 | |||||||||
a. Determine the average cycle time for each
element. (Round your answers to 3 decimal
places.)
Element | Average cycle |
1 | |
2 | |
3 | |
4 | |
b. Find the normal time for each element.
(Round your answers to 3 decimal
places.)
Element | Normal time |
1 | |
2 | |
3 | |
4 | |
c. Assuming an allowance factor of 10 percent of
job time, compute the standard time for this job. (Round
your answers to 3 decimal places.)
Element | Standard time |
1 | |
2 | |
3 | |
4 | |
please like if it helps