A deep-foundation engineering contractor has bid on a foundation system for a new building housing the world headquarters for a Fortune 500 company. A part of the project consists of installing auger cast piles. The contractor was given bid information for cost-estimation purposes which consisted of the estimated depth of each pile; however, actual drill footage of each pile could not be determined exactly until construction was performed. The contractor developed a linear regression model to estimate the actual pile length as a function of the estimated pile lengths. Use a significance level of 0.05 for all hypothesis tests and intervals.

Source DF Sum of Squares Mean Square F Ratio Prob>F
Model 1 52569.023 52569 537.7953 <0.0001*
Error 309 30204.481 97.7
C. Total 310 82773.505
Parameter Estimates
Term Estimate Std. Error t ratio Prob>t Lower 95% Upper 95%
Intercept 11.614377 1.137095 10.21 <0.0001* 9.3769485 13.851806
Pile Length (ft.) Estimated 0.8141892 0.035109 23.19 <0.0001* 0.7451065 0.8832719

a. What proportion of the variation in the Pile Length(ft.)-Actual is “explained” by the simple linear relationship with Pile Length(ft.)-Estimated?

b. What is the correlation coefficient between Pile Length(ft.)-Estimated and the Pile Length(ft.)-Actual?

c. Multiple Choice: Choose 1

1. as the Pile Length(ft.)-Estimated increases by 1, the Pile Length(ft.)-Actual is expected to decrease by about 0.8141892.

2. as the Pile Length(ft.)-Estimated increases by 1, the Pile Length(ft.)-Actual is expected to increase by about 0.035109.

  3. as the Pile Length(ft.)-Estimated increases by 1, the Pile Length(ft.)-Actual is expected to decrease by about 0.035109.

4. it is not appropriate since the simple regression coefficient for Pile Length(ft.)-Estimated is not significant based on its large t Ratio.

5.  as the Pile Length(ft.)-Estimated increases by 1, the Pile Length(ft.)-Actual is expected to increase by about 0.8141892.

d. Give a point estimate for the Pile Length(ft.)-Actual for a pile with a Pile Length(ft.)-Estimated of 40 feet?

Homework Answers

Answer #1

A) Proportion of the variation explained by the linear model is given by R squared.

Therefore, 63.5% variation is explained by the model.

B) The correlation coefficient is given by:-

C) As the Pile Length(ft.)-Estimated increases by 1, the Pile Length(ft.)-Actual increase by 0.8141892. The regression equation is

.

So, option (D) is correct.

D) The point estimate is given by:-

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
An engineering student has designed a new cloths dryer. X: temperature setting in ∘F, Y: actual...
An engineering student has designed a new cloths dryer. X: temperature setting in ∘F, Y: actual interior temperature during cycle ∘F. She has collected the following n=5 samples: X Y 140 170 145 174 150 172 155 178 160 176 Find the correlation coefficient, r. a.) 0.80 b.) 0.70 c.) 0.90 d.) 0.70 Following question 10 about the new cloths dryer (given the table): What is the fitted simple linear regression equation? In the answer choices, Y^ is representing the...
(1) A real estate agent says he can approximate the value of a house through the...
(1) A real estate agent says he can approximate the value of a house through the following equation: SP = 125,000 + 3000BR + 500BDR + 4000WC –6000P; where BR= # of bathrooms, BDR= # bedrooms, WC =Wine cellar and P=Pool. There are _____ zero-one variables in this regression model. Select one: a. 4 b. 3 c. 2 d. 1 (2) A researcher believes, among other things, the town one lives in within the state influences the likelihood of contracting...
1.The sample mean is an unbiased estimator for the population mean. This means: The sample mean...
1.The sample mean is an unbiased estimator for the population mean. This means: The sample mean always equals the population mean. The average sample mean, over all possible samples, equals the population mean. The sample mean will only vary a little from the population mean. The sample mean has a normal distribution. 2.Which of the following statements is CORRECTabout the sampling distribution of the sample mean: The standard error of the sample mean will decrease as the sample size increases....
Sign In INNOVATION Deep Change: How Operational Innovation Can Transform Your Company by Michael Hammer From...
Sign In INNOVATION Deep Change: How Operational Innovation Can Transform Your Company by Michael Hammer From the April 2004 Issue Save Share 8.95 In 1991, Progressive Insurance, an automobile insurer based in Mayfield Village, Ohio, had approximately $1.3 billion in sales. By 2002, that figure had grown to $9.5 billion. What fashionable strategies did Progressive employ to achieve sevenfold growth in just over a decade? Was it positioned in a high-growth industry? Hardly. Auto insurance is a mature, 100-year-old industry...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT