Hour Xbar   R   Hour   Xbar   R   Hour   Xbar R Hour    Xbar R 1   3.35   0.76...

Hour Xbar   R   Hour   Xbar   R   Hour   Xbar R Hour    Xbar R
1   3.35   0.76 7    2.95   0.53   13    3.11   0.80   19   3.41    1.66
2   3.00    1.23 8    2.75    1.13 14    2.73 1.36   20   2.89   1.04
3   3.22    1.38 9    3.12    0.66   15 3.12 1.11   21   2.65   1.08
4   3.39    1.21    10    2.75   1.28    16 2.74 0.50   22   3.38   0.46
5   3.17    1.12    11    2.93   1.22    17    2.86 1.43   23   3.04   1.63
6   2.96   0.32   12   2.97   0.35   18   2.64   1.24   24   2.54   1.02

Sampling 44 pieces of​ precision-cut wire​ (to be used in computer​ assembly) every hour for the past 24 hours has produced the following​ result

Based on the sampling​ done,

the

control limits for ​3-sigma

x overbarx

chart are ​(round all intermediate calculations to three decimal places before proceeding with further

​calculations)​:

Upper Control Limit

​(UCL Subscript x overbarUCLx​)

​=

nothing

inches ​(round your response to three decimal​ places).

Based on the sampling​ done,

the

control limits for ​3-sigma

x overbarx

chart are ​(round all intermediate calculations to three decimal places before proceeding with further

​calculations)​:

Upper Control Limit (UCL Subscript x overbarUCLx​) = inches ​(round your response to three decimal​ places).

Lower Control Limit ?

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Twelve​ samples, each containing five​ parts, were taken from a process that produces steel rods at...
Twelve​ samples, each containing five​ parts, were taken from a process that produces steel rods at Emmanual​ Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. Refer to Table S6.1 - Factors for computing control chart limits (3 sigma) for this problem. Sample ​Size, n Mean​ Factor, A2 Upper​ Range, D4 Lower​ Range, D3 2 1.880 3.268 0 3 1.023 2.574 0 4 0.729 2.282 0...
The Canine Gourmet Company produces delicious dog treats for canines with discriminating tastes. Management wants the​...
The Canine Gourmet Company produces delicious dog treats for canines with discriminating tastes. Management wants the​ box-filling line to be set so that the process average weight per packet is 4040 grams. To make sure that the process is in​ control, an inspector at the end of the filling line periodically selects a random box of 1010 packets and weighs each packet. When the process is in​ control, the range in the weight of each sample has averaged 55 grams....
A process sampled 20 times with a sample of size 8 resulted in  = 23.5 and R...
A process sampled 20 times with a sample of size 8 resulted in  = 23.5 and R = 1.8. Compute the upper and lower control limits for the x chart for this process. (Round your answers to two decimal places.) UCL=________. LCL=________. Compute the upper and lower control limits for the R chart for this process. (Round your answers to two decimal places.) UCL=_________. LCL=___________.
Pioneer Chicken advertises​ "lite" chicken with​ 30% fewer calories than standard chicken. When the process for​...
Pioneer Chicken advertises​ "lite" chicken with​ 30% fewer calories than standard chicken. When the process for​ "lite" chicken breast production is in​ control, the average chicken breast contains 420 ​calories, and the standard deviation in caloric content of the chicken breast population is 20 calories. Pioneer wants to design an x overbar​-chart to monitor the caloric content of chicken​ breasts, where 25 chicken breasts would be chosen at random to form each sample. ​a) What are the lower and upper...
A rum producer monitors the position of its label on the bottle by sampling three bottles...
A rum producer monitors the position of its label on the bottle by sampling three bottles from each batch. One quantity measured is the distance from the bottom of the bottle neck to the top of the label. The process mean should be μ = 1.6 inches. Past experience indicates that the distance varies with σ = 0.15 inch. (a) The mean distance x for each batch sample is plotted on an x control chart. Calculate the center line and...
A rum producer monitors the position of its label on the bottle by sampling two bottles...
A rum producer monitors the position of its label on the bottle by sampling two bottles from each batch. One quantity measured is the distance from the bottom of the bottle neck to the top of the label. The process mean should be ? = 1.6 inches. Past experience indicates that the distance varies with ? = 0.13 inch. The mean distance x for each batch sample is plotted on an x control chart. Calculate the center line and control...
A rum producer monitors the position of its label on the bottle by sampling two bottles...
A rum producer monitors the position of its label on the bottle by sampling two bottles from each batch. One quantity measured is the distance from the bottom of the bottle neck to the top of the label. The process mean should be μ = 1.6 inches. Past experience indicates that the distance varies with σ = 0.15 inch. (a) The mean distance x for each batch sample is plotted on an x control chart. Calculate the center line and...
The defect rate for your product has historically been about 4.00​%. For a sample size of...
The defect rate for your product has historically been about 4.00​%. For a sample size of 100​, the upper and lower 3​-sigma control chart limits​ are: UCL Subscript p ​= nothing ​(enter your response as a number between 0 and​ 1, rounded to four decimal​ places). LCL Subscript p ​=   nothing ​(enter your response as a number between 0 and​ 1, rounded to four decimal​ places)
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.7 4 95.42 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 0.9 8 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.58 1.3 14 95.22 0.6 15 95.04 0.8 16...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.7 4 95.42 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 0.9 8 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.60 1.3 14 95.22 0.6 15 95.04 0.8 16...