Question

Choose the best answer. Which of the following signals should be considered out of control on...

Choose the best answer. Which of the following signals should be considered out of control on control charts?

A point outside the 3? control limits AND nine consecutive points above the center line or nine consecutive points below the center line on the ?¯chart AND nine points either above or below the center line on the ?¯chart are considered out of control on control charts.

Nine consecutive points above the center line or nine consecutive points below the center line on the ?¯ chart is considered out of control on control charts.

A point outside the 3? control limits is considered out of control on control charts.

Nine points either above or below the center line on the ?¯ chart is considered out of control on control charts.

A point outside the 3? control limits AND nine consecutive points above the center line or nine consecutive points below the center line on the ?¯ chart are considered out of control on control charts.

Homework Answers

Answer #1

option D is correct answer

because we know that the process is out of control only when the points fall outside 3 sigma and 9 consecutive points are either below or above the center line. So, option D met conditions

option A is incorrect because we need consecutive 9 points, but not any 9 points below or above the center line. So, one condition is not satisfied

option B is incorrect because it only shows one condition, but not showing the condition fo 3 sigma. So, it is incomplete

option C is incorrect because we need consecutive 9 points, but not any 9 points below or above the center line. So, one condition is not satisfied

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Choose the best answer. A process is out of control if: one point outside the control...
Choose the best answer. A process is out of control if: one point outside the control limits is found. one point outside the control limits is found or there are nine consecutive points above or below the mean. there are nine consecutive points above or below the mean.
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.7 4 95.42 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 0.9 8 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.58 1.3 14 95.22 0.6 15 95.04 0.8 16...
4. Which of the following is (are) true? I. A production process that exhibits only random...
4. Which of the following is (are) true? I. A production process that exhibits only random variability would be considered “out of control”. II. If a point plotted on a control chart falls outside one of the control limits, this suggests the production process is “out of control”. III. Assignable variation in a production process is completely random, and cannot be prevented. I and II II only III only I and III I only
MULTIPLE CHOICE PLEASE MAKE SURE OF ANSWER 8. Control Charts for Slow Processes 1 point possible...
MULTIPLE CHOICE PLEASE MAKE SURE OF ANSWER 8. Control Charts for Slow Processes 1 point possible (graded) The usage of which of the following charts is suggested for slow moving processes according to the lecture? A- R chart B- X chart C- X-bar chart 9. MA and MR Charts 1 1 point possible (graded) Which of the following statements about moving average (MA) and moving range (MR) charts is NOT correct? A- Moving average (MA) and MR charts use sample...
Surface finish data of the front bumper for passenger vehicle is listed below. First, decide which...
Surface finish data of the front bumper for passenger vehicle is listed below. First, decide which control chart should be used and then determine the trial control limits and revised control limits. Assume any out- of-control points have assignable causes.       Lot Number                                  Sample Size                                 Nonconformities                  1                                                   10                                                     45                2                                                   10                                                     51                3                                                    9                                                      36                4                                                   12                                                     25                5                                                  ...
1 An x̅ chart with a sample size of 4 is used to control the mean...
1 An x̅ chart with a sample size of 4 is used to control the mean of a normally distributed quality characteristic. It is known that process standard deviation is 8. The upper and lower control limits of the chart are 147 and 123 respectively. Assume the process mean shifts to 121. What is the probability that this shift is detected on the first subsequent sample? What is expected number of samples taken before the shift is detected? 2 The...
When a controlled process changes from 3s control to 6s control, it implies the s of...
When a controlled process changes from 3s control to 6s control, it implies the s of the parameter remains the same. the distance between USL-LSL becomes smaller the distance between UCL-LCL becomes smaller the % of reject increases none of the above is true In a simple linear regression analysis, the following sum of squares are produced:    The proportion of the variation in y that is explained by the variation in x is: 20% 80% 25% 50% none of...
Please answer all questions, show all work ofr how you figured out the answer Question 1:...
Please answer all questions, show all work ofr how you figured out the answer Question 1: The 95% confidence limits for creatine kinase enzyme activity in a level I control are 130-252 U/L. What is the standard deviation for this control? Quesiton 2: The process of comparing consecutive laboratory values from the same patient for quality assurance purposes is termed A. Logical consistency B. Delta checking C. Physiological relationship checking D. Arithmetic checking Question 3: A series of LDH enzyme...
* For control purposes, which of the following persons would be the best person to distribute...
* For control purposes, which of the following persons would be the best person to distribute paychecks to employees? The receptionist The HR deparment manager The payroll supervisor The controller The immediate supervisor for each employee The coding system typically used in the general ledger chart of accounts is ______. mnemonic coding hierarchical coding serial coding block coding Morse coding All of the above None of the above A major input to the Distribute Labor Costs sub process of the...
1.Question 1 Which of the following is not a common reason to use Data Visualization? Examining...
1.Question 1 Which of the following is not a common reason to use Data Visualization? Examining relationships Spotting outliers Interpolating distributions for missing data Discriminating clusters 1 point 2.Question 2 Which kind of chart shows hierarchy through a series of rings that are sliced for each category node? Line chart Scatter plot Sunburst chart Donut chart 1 point 3.Question 3 Which chart is drawn by first plotting data points on a Cartesian coordinate grid and then connecting a line between...
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT