Question

Choose the best answer. A process is out of control if: one point outside the control...

Choose the best answer. A process is out of control if:

one point outside the control limits is found.

one point outside the control limits is found or there are nine consecutive points above or below the mean.

there are nine consecutive points above or below the mean.

Homework Answers

Answer #1

we know that the two main conditions for the process A to be out of control are

(A) it must have at least one point that is outside the 3 sigma level

(B) it must have either 9 consecutive points on the upper side of mean or 9 consecutive points on the lower side of the mean

So, option 1 and 3 are incorrect or we can say incomplete because both these options have only half of condition

option 2 is correct answer because it has both the necessary condition that we mentioned above.

therefore, answer is option 2

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
Choose the best answer. Which of the following signals should be considered out of control on...
Choose the best answer. Which of the following signals should be considered out of control on control charts? A point outside the 3? control limits AND nine consecutive points above the center line or nine consecutive points below the center line on the ?¯chart AND nine points either above or below the center line on the ?¯chart are considered out of control on control charts. Nine consecutive points above the center line or nine consecutive points below the center line...
A process is in control and normally distributed with ? control chart limits of 45 and...
A process is in control and normally distributed with ? control chart limits of 45 and 15. The subgroup size is 4. Suppose the process variance suddenly triples while process mean remains unchanged. What is the probability that the first subsequent subgroup average will fall outside the control limits? What are the ? probability and ARL?
A process is in control and normally distributed with ? control chart limits of 45 and...
A process is in control and normally distributed with ? control chart limits of 45 and 15. The subgroup size is 4. Suppose the process variance suddenly triples while process mean remains unchanged. What is the probability that the first subsequent subgroup average will fall outside the control limits? What are the ? probability and ARL? Suppose the process variance suddenly triples while process mean shifts downward to 10. What are the β probability and ARL now?
Aspen Plastics produces plastic bottles to customer order. To monitor the process, statistical process control charts...
Aspen Plastics produces plastic bottles to customer order. To monitor the process, statistical process control charts are used. The central line of the chart for the sample means is set at 8.50 and the range at 0.31in. Assume that the sample size is 6 and the specification for the bottle neck diameter is 8.50 ± 0.25. a. Calculate the control limits for the mean and range charts. (3 points) b. Suppose that the standard deviation of the process distribution is...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.7 4 95.42 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 0.9 8 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.58 1.3 14 95.22 0.6 15 95.04 0.8 16...
Process in statistical control has a mean of 100.0 and standard deviation of 3.0. ?_bar and...
Process in statistical control has a mean of 100.0 and standard deviation of 3.0. ?_bar and ? charts with subgroups of size 7 are used to monitor the process. If the process center shifts downward to 96.0, what is the probability of first point falling outside ?_bar chart control limits is on the third sample taken after the shift?
In order to determine if a process that produces housings for wireless speakers is in control,...
In order to determine if a process that produces housings for wireless speakers is in control, the following data is collected to construct a control chart. Ten samples of 200 wireless speakers each have been taken and the number of defective housing is: Sample1:3; Sample2:10; Sample3:8; Sample4:2; Sample5:6 Sample6:7; Sample7:4; Sample8:5; Sample9:6;Sample10:7. Based on this data, is the process in control if 2 sigma limits are employed? a. it is out of control b. it is in control because the...
Choose the one best internal control principle that is related to the following: The treasurer of...
Choose the one best internal control principle that is related to the following: The treasurer of a company must take a mandatory vacation every year. a. Independent internal verification. b. Documentation procedures. c. Human resource controls. d. Physical control devices.
4. Which of the following is (are) true? I. A production process that exhibits only random...
4. Which of the following is (are) true? I. A production process that exhibits only random variability would be considered “out of control”. II. If a point plotted on a control chart falls outside one of the control limits, this suggests the production process is “out of control”. III. Assignable variation in a production process is completely random, and cannot be prevented. I and II II only III only I and III I only
Choose the best answer: The terms of a bond issue are spelled out in the bond:...
Choose the best answer: The terms of a bond issue are spelled out in the bond: a)offering memorandum. b) indenture. C) contract.
ADVERTISEMENT
Need Online Homework Help?

Get Answers For Free
Most questions answered within 1 hours.

Ask a Question
ADVERTISEMENT