Question

A manufacturing process with acceptance limits 100 +-3 produces measurements in Data below. What percentage of...

A manufacturing process with acceptance limits 100 +-3 produces measurements in Data below. What percentage of production does not meet the acceptance limits?

A. 0.67%

B. 0.46%

C. 0.14%

D. 0.81%

100.896
100.722
101.110
100.319
99.266
101.104
99.769
99.228
98.805
99.568
99.339
99.585
101.680
99.903
99.604
100.550
98.260
100.078
98.515
98.010
101.011
98.809
98.522
100.177
101.138
100.055
99.566
100.500
100.159
100.835
100.075
99.347
101.199
99.749
99.327
98.384
101.632
101.176
99.874
99.879
98.219
101.103
100.066
100.399
102.906
100.808
98.304
99.527
98.534
99.898

Homework Answers

Know the answer?
Your Answer:

Post as a guest

Your Name:

What's your source?

Earn Coins

Coins can be redeemed for fabulous gifts.

Not the answer you're looking for?
Ask your own homework help question
Similar Questions
A manufacturing process with acceptance limits 100 +-3 produces measurements in Data below. What percentage of...
A manufacturing process with acceptance limits 100 +-3 produces measurements in Data below. What percentage of production does not meet the acceptance limits? 98.735 100.714 101.408 99.543 101.002 98.128 100.713 101.124 98.408 99.424 99.855 98.321 100.653 100.918 101.449 101.439 101.562 100.501 100.584 99.929 100.103 100.699 99.280 100.430 100.628 101.745 101.382 99.522 100.465 100.863 100.413 99.417 99.278 100.248 98.216 98.376 101.782 99.715 100.654 99.561 99.855 102.001 100.976 101.014 98.673 99.797 98.274 101.543 97.845 101.391
A manufacturing process with acceptance limits 100 +-3 produces measurements in Data below. What percentage of...
A manufacturing process with acceptance limits 100 +-3 produces measurements in Data below. What percentage of production does not meet the acceptance limits? Please show how to compute in excel. 98.735 100.714 101.408 99.543 101.002 98.128 100.713 101.124 98.408 99.424 99.855 98.321 100.653 100.918 101.449 101.439 101.562 100.501 100.584 99.929 100.103 100.699 99.280 100.430 100.628 101.745 101.382 99.522 100.465 100.863 100.413 99.417 99.278 100.248 98.216 98.376 101.782 99.715 100.654 99.561 99.855 102.001 100.976 101.014 98.673 99.797 98.274 101.543 97.845 101.391
A manufacturing process produces steel rods in batches of 2,200. The firm believes that the percent...
A manufacturing process produces steel rods in batches of 2,200. The firm believes that the percent of defective items generated by this process is 4.3%. a. Calculate the centerline, the upper control limit (UCL), and the lower control limit (LCL) for the p¯p¯ chart. (Round your answers to 3 decimal places.) centerline- Upper control limit- Lower control limit- b. An engineer inspects the next batch of 2,200 steel rods and finds that 5.5% are defective. Is the manufacturing process under...
A process is controlled with a fraction nonconforming control chart with three-sigma limits, ? = 100....
A process is controlled with a fraction nonconforming control chart with three-sigma limits, ? = 100. Suppose that the center line = 0.10. (a) Suppose that the percentage of conforming units in sample ? is ?? . What distribution should ?? follow? Use a Normal distribution to approximate the distribution of ?? . Specify the mean and the variance of this Normal distribution. (b) Find the upper and lower control limit for this fraction nonconforming chart. (c) Find the equivalent...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data...
The following are quality control data for a manufacturing process at Kensport Chemical Company. The data show the temperature in degrees centigrade at five points in time during a manufacturing cycle. Sample x R 1 95.72 1.0 2 95.24 0.9 3 95.18 0.7 4 95.42 0.4 5 95.46 0.5 6 95.32 1.1 7 95.40 0.9 8 95.44 0.3 9 95.08 0.2 10 95.50 0.6 11 95.80 0.6 12 95.22 0.2 13 95.58 1.3 14 95.22 0.6 15 95.04 0.8 16...
The time it takes to produce a certain part in a high-tech manufacturing process is uniformly...
The time it takes to produce a certain part in a high-tech manufacturing process is uniformly distributed between 4 and 8 minutes. Use the following random numbers to simulate the production time for 10 parts and answer the questions below. 0.82, 0.63, 0.02, 0.91, 0.44, 0.18, 0.12, 0.67, 0.80, 0.09 Part Production Time 1 2 3 4 5 6 7 8 9 10 a) According to this simulation, what is the shortest production time? b) According to this simulation, what...
The time it takes to produce a certain part in a high-tech manufacturing process is uniformly...
The time it takes to produce a certain part in a high-tech manufacturing process is uniformly distributed between 4 and 8 minutes. Use the following random numbers to simulate the production time for 10 parts and answer the questions below. 0.82, 0.63, 0.02, 0.91, 0.44, 0.18, 0.12, 0.67, 0.80, 0.09 Part Production Time 1 2 3 4 5 6 7 8 9 10 a) According to this simulation, what is the shortest production time? b) According to this simulation, what...
in a machining process the average diameter of a component is calculated from sample data and...
in a machining process the average diameter of a component is calculated from sample data and is .752" where the standard deviation is .008 for the diameter of this product the specification limit is .750+/-.02 a) prepare the normal distribution curve b) identify process limits c) identify spec limits d)what is the percentage of scrap and rework? E) to eliminate scrap where should the process centered at? f)by eliminating scrap at step (e) what would be the percentage of rework?
In order to determine if a process that produces housings for wireless speakers is in control,...
In order to determine if a process that produces housings for wireless speakers is in control, the following data is collected to construct a control chart. Ten samples of 200 wireless speakers each have been taken and the number of defective housing is: Sample1:3; Sample2:10; Sample3:8; Sample4:2; Sample5:6 Sample6:7; Sample7:4; Sample8:5; Sample9:6;Sample10:7. Based on this data, is the process in control if 2 sigma limits are employed? a. it is out of control b. it is in control because the...
A manufacturing process produces bags of chips whose weight is N(16 oz, 1.5 oz). On a...
A manufacturing process produces bags of chips whose weight is N(16 oz, 1.5 oz). On a given day, the quality control officer takes a sample of 36 bags and computed the mean weight of these bags. The probability that the sample mean weight is below 16 oz is Group of answer choices: A. 0.55 B. 0.45 C. 0.50 D. 0.60