Tasco Oil owns a pipeline booster unit that that operates continuously.
The time between breakdowns for each booster is exponential with
a mean of 20 hours. The repair time is exponential with mean 3
hours. In a particular station, two repairpersons attend 10
boosters. The hourly wage for each repairperson is $18. Pipeline
losses are estimated to be $30 per broken booster per hour. Tasco
is studying the possibility of hiring an additional
repairperson.
a) Will there be any cost savings in hiring a third
repairperson?
b) What is the schedule loss in dollars per breakdown when the
number of repairpersons on duty is two? Three?
Answer:
Get Answers For Free
Most questions answered within 1 hours.